• All Events
  • Barnston Island Ferry Both Directions Barnston Island Ferry, in both directions. Travel advisory in effect at Barnston Island Ferry. Until Fri May 16. Residential access only. Foot passenger service only times. Ferry out of service: May 12-15 9PM to 1155PM and May 16 9PM to 1255AM. Next update time Fri May 16 at 1:00 AM PDT. Last updated Sun May 11 at 2:09 PM PDT. (DBC-75727)
    Barnston Island Ferry Both Directions Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Sat May 31 at 3:00 PM PDT. Last updated Tue Apr 29 at 3:24 PM PDT. (DBC-73930)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). From 7:00 AM to 5:30 PM PDT daily. Until further notice, full time single lane alternating traffic. Expect up to 40-minute delays due to railway crossing and construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Fri May 2 at 8:49 AM PDT. (DBC-75637)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h 24/7 until May 12. Watch for traffic control. Next update time Mon May 12 at 5:00 PM PDT. Last updated Sat Apr 26 at 2:13 PM PDT. (DBC-64961)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Single lane alternating traffic 8 PM to 6 AM Mon-Thurs. No closures from Friday, May 16th, to Tuesday, May 20th. Closures to resume May 20th at 12:00 PM to 3:00 PM. Next update time Tue May 20 at 3:00 PM PDT. Last updated Sun May 11 at 10:35 AM PDT. (DBC-70490)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Wed May 14. Travelers should expect traffic delays up to 30 min 24 hours a day with single lane alternating traffic or closures. Next update time Thu May 15 at 12:00 PM PDT. Last updated Thu Apr 17 at 12:29 PM PDT. (DBC-73974)
    Highway 13 Southbound Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478)
    Highway 17 Both Directions Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341)
    Highway 1A Both Directions Highway 1A, in both directions. Bridge construction planned at Pattullo Bridge (New Westminster). Starting Fri May 16 at 9:00 PM PDT until Tue May 20 at 5:00 AM PDT. Road closure planned. Alternate route via Port Mann Bridge, or Queensborough and Alex Fraser bridges. Next update time Tue May 20 at 5:00 AM PDT. Last updated Fri May 9 at 3:51 PM PDT. (DBC-76436)
    Highway 23 Both Directions Highway 23, in both directions. Paving operations planned between Junction Hwy 6 and Junction Hwy 31 for 44.8 km (Nakusp). Starting Mon May 12 until Wed May 14. From 7:00 AM to 5:30 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect delays. Next update time Wed May 14 at 5:30 PM PDT. Last updated Fri May 9 at 11:27 AM PDT. (DBC-76424)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Special event planned between 3rd St and 7th Ave for 0.5 km (Keremeos). Starting Mon May 19 at 9:00 AM PDT until Mon May 19 at 12:30 PM PDT. Victoria Day parade. Road closed. Detour via 3rd St and 6th Ave. Watch for traffic control and expect delays. Next update time Mon May 19 at 12:30 PM PDT. Last updated Thu May 8 at 10:53 AM PDT. (DBC-76365)
    Highway 37A Both Directions Highway 37A, in both directions. Avalanche control work planned between Pearly Gates and Surprise Pullout/Windy Chain Up for 33.9 km (12 km east of Stewart to 13 km west of Meziadin). Starting Mon May 12 at 1:00 PM PDT until Mon May 12 at 5:00 PM PDT. Road closure planned. Detour will not be available. Expect delays of up to four hours. Next update time Mon May 12 at 5:00 PM PDT. Last updated Sun May 11 at 5:39 PM PDT. (DBC-76479)
    Other Roads Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 14, 2026 at 9:00 AM PDT. Last updated Mon Apr 14 at 9:09 AM PDT. (DBC-23443)
    Other Roads Both Directions Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Oct 22 at 2:00 PM PDT. Last updated Wed Apr 23 at 3:19 PM PDT. (DBC-27390)
    Other Roads Both Directions Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 17, 2026 at 2:00 PM PDT. Last updated Thu Apr 17 at 3:40 PM PDT. (DBC-28386)
    Other Roads Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311)
    Other Roads Both Directions McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 9, 2026 at 9:00 AM PDT. Last updated Thu Apr 10 at 9:28 AM PDT. (DBC-53013)
    Other Roads Both Directions Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Full road closures between 10am-2pm, 7 days per week. Single lane alternating traffic will be in place outside of these hours. Expect delays. Next update time Mon May 12 at 2:30 PM PDT. Last updated Fri May 9 at 2:32 PM PDT. (DBC-61149)
    Other Roads Both Directions Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road. Next update time Wed Apr 8, 2026 at 10:00 AM PDT. Last updated Wed Apr 9 at 10:42 PM PDT. (DBC-67913)
    Atlin Hwy Atlin Hwy. Frost heaves between Discovery Ave and Yukon Border for 50.8 km (Atlin to British Columbia and Yukon Border). Last updated Sun May 11 at 3:47 PM PDT. (DBCRCON-223121)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006)
    Highway 1 Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856)
    Highway 1 Highway 1 (TransCanada Highway). Utility work planned between Trunk Rd and York Rd for 0.6 km (Duncan). Starting Tue May 20 until Sat Jun 14 at 4:00 PM PDT. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Mon May 5 at 7:25 AM PDT. (DBC-74880)
    Highway 1 Southbound Highway 1 (TransCanada Highway), southbound. Utility work planned between Mt Sicker Rd and Somenos Rd for 3.2 km (2 km south of Chemainus to 5 km north of Duncan). Starting Wed May 14 at 9:00 AM PDT until Wed May 14 at 4:00 PM PDT. Lane Closure. Last updated Thu May 8 at 10:41 AM PDT. (DBC-76363)
    Highway 1 Southbound Highway 1 (TransCanada Highway), southbound. Bridge maintenance planned between Mt Sicker Rd and Somenos Rd for 3.2 km (5 km north of Duncan to 2 km south of Chemainus). Starting Wed May 14 at 9:00 AM PDT until Wed May 14 at 4:00 PM PDT. Left lane will be closed. Westholme bridge Watch for crews and equipment working. Last updated Thu May 8 at 8:40 AM PDT. (DBC-76360)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Oyster Sto-Lo Rd (2 km north of Ladysmith). Starting Tue May 13 at 7:00 PM PDT until Wed May 14 at 5:00 AM PDT. Centre lane will be closed in both directions. Watch for traffic control personnel. Last updated Fri May 9 at 10:55 AM PDT. (DBC-76413)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Cedar Rd (Nanaimo). Starting Mon May 12 at 7:00 PM PDT until Tue May 13 at 3:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 10:51 AM PDT. (DBC-76410)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Haliburton St (Nanaimo). Starting Tue May 13 at 3:00 AM PDT until Tue May 13 at 5:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 10:53 AM PDT. (DBC-76412)
    Highway 1 Northbound Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Mon Apr 21 at 11:59 AM PDT. (DBC-70846)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Exit 3 and Westport Rd (West Vancouver). Starting Tue May 13 until Thu May 15 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Tuesday and Wednesday. Lane Closure. Alternating lane closures in both directions for bridge washing. Last updated Fri May 9 at 11:23 AM PDT. (DBC-76423)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Exit 4: Headland Dr and Almondel Rd (West Vancouver). Until Tue May 13 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday and Monday. Lane Closure. Alternating lane closures in both directions for bridge washing. Last updated Fri May 9 at 11:05 AM PDT. (DBC-76420)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Geotechnical investigation planned between Riverside Rd and Exit 90: McCallum Rd for 0.6 km (Abbotsford). Starting Mon May 12 until Fri May 23. From 8:00 PM to 5:00 AM PDT daily. Shoulder will be closed. Last updated Mon Apr 28 at 1:41 PM PDT. (DBC-75906)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Utility work planned between Juniper Beach Prov Park Access Rd and Back Valley Rd for 3.8 km (10 to 14 km east of Cache Creek). Starting Mon May 12 until Fri May 23. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 1 at 4:16 PM PDT. (DBC-75457)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Utility work planned between Bale Rd and Pinecrest Dr for 1.9 km (24 to 22 km east of Cache Creek). Starting Mon May 12 until Fri May 16 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon Apr 21 at 12:03 PM PDT. (DBC-75458)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Utility work planned between Little River Rd and Des Fosses Rd for 0.9 km (13 to 14 km east of Chase). Starting Fri May 16 at 10:00 AM PDT until Fri May 16 at 2:00 PM PDT. Lane Closure. Last updated Thu May 1 at 10:54 AM PDT. (DBC-76056)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Utility work planned between 10 St NE and 14 St NE for 0.5 km (Salmon Arm). Starting Mon May 12 until Fri May 16. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed. Last updated Thu May 1 at 11:38 AM PDT. (DBC-76057)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Tree pruning between Loftus Rd and Rutherford-Three Valley Rest Area for 30.4 km (16 km east of Sicamous to 19 km west of Revelstoke). Until Fri May 23 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Wed Apr 30 at 3:05 PM PDT. (DBC-75910)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Sun May 18 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of 20 minutes. Last updated Wed May 7 at 7:00 PM PDT. (DBC-74730)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Speed reduction to 30km/h during construction. Last updated Fri Apr 25 at 5:56 PM PDT. (DBC-75826)
    Highway 1 Highway 1 (TransCanada Highway). Road maintenance work planned between Glacier National Park Summit and Beaver Valley Rd (3 km east of Rogers Pass Summit). Starting Tue May 13 at 8:00 AM PDT until Tue May 13 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Snow shed washing. Last updated Sun May 11 at 10:56 AM PDT. (DBC-76474)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Glacier National Park Summit and Beaver Valley Rd (4 km east of Rogers Pass Summit). Starting Mon May 12 at 8:00 AM PDT until Mon May 12 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Snow shed washing. Last updated Sun May 11 at 10:54 AM PDT. (DBC-76472)
    Highway 1 Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon May 19 at 9:00 AM MDT. Last updated Mon May 5 at 9:57 AM MDT. (DBC-73964)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Maintenance between Redgrave Rest Area and Anderson Rd for 39.9 km (14 km east of East Boundary of Glacier National Park to 1 km west of Golden). From 8:00 AM to 3:30 PM MDT on Monday and Tuesday. Last updated Mon May 5 at 8:18 AM MDT. (DBC-76164)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437)
    Highway 1 Both Directions Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Sun May 11 at 8:11 PM MDT. (DBC-44269)
    Highway 1 Highway 1 (Kicking Horse Pass). Maintenance between Golden Donald Upper Rd and West Boundary of Yoho National Park for 24.0 km (West Boundary of Yoho National Park to Golden). Until Thu May 15 at 3:30 PM MDT. Watch for slow moving vehicle. Last updated Mon May 5 at 8:24 AM MDT. (DBC-76167)
    Highway 10 Both Directions Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278)
    Highway 101 Westbound Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-72411)
    Highway 11 Both Directions Highway 11, in both directions. Geotechnical investigation planned between McClary Ave and South Fraser Way for 1.2 km (Abbotsford). Starting Mon May 12 until Fri May 23. From 8:00 PM to 5:00 AM PDT daily. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Mon Apr 28 at 1:39 PM PDT. (DBC-75905)
    Highway 11 Northbound Highway 11, northbound. Bridge maintenance between Riverside St and London Ave Overpass for 1.9 km (Abbotsford to Mission). Until Fri May 30. From 9:00 PM to 6:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Thu May 1 at 9:13 AM PDT. (DBC-76050)
    Highway 13 Both Directions Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197)
    Highway 14 Highway 14. Special event planned between Croce Rd and Brooks Rd for 0.9 km (Sooke). Starting Sat Jun 7 at 11:00 AM PDT until Sat Jun 7 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Apr 29 at 8:59 AM PDT. (DBC-75941)
    Highway 14 Both Directions Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277)
    Highway 14 Eastbound Highway 14, eastbound. Utility work planned between Lazzar Rd and Parkland Rd for 0.8 km (Sooke). Starting Mon May 12 until Wed May 14 at 2:00 PM PDT. From 9:00 AM to 2:00 AM PDT on Monday, Tuesday and Wednesday. Shoulder will be closed. Last updated Thu May 8 at 10:47 AM PDT. (DBC-76364)
    Highway 15 Northbound Highway 15 (Pacific Highway), northbound. Utility work between 32 Ave and 40 Ave for 1.6 km (Surrey). Until Mon May 12 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Mon Apr 21 at 12:15 PM PDT. (DBC-73932)
    Highway 15 Southbound Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance planned between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Starting Mon May 19 at 6:15 PM PDT. Bridge construction planned. Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Mon May 12 at 1:30 PM PDT. Last updated Sun May 11 at 1:17 PM PDT. (DBC-74895)
    Highway 16 Highway 16 (Yellowhead Highway). Bridge maintenance between Omineca Ave and Beaver Rd for 37.5 km (Witset (Moricetown) to South Hazelton). Until Fri May 1, 2026 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect delays. Watch for crew and equipment. Expect up to 15 min delays. Last updated Thu May 1 at 3:45 PM PDT. (DBC-75882)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Bridge maintenance between Moose Lake Boat Launch and Grant Brook Bridge for 0.6 km (5 to 6 km east of Moose Lake). Until Wed May 14 at 8:00 AM PDT. Single lane alternating traffic. Will be single lane alternating traffic twenty four hours. Last updated Thu May 1 at 1:39 PM PDT. (DBC-76064)
    Highway 17 Both Directions Highway 17 (Patricia Bay Highway), in both directions. Utility work planned between Gliddon Rd and Exit 19: Island View Rd for 1.8 km (Central Saanich). Starting Wed May 14 at 9:00 AM PDT until Thu May 15 at 6:00 AM PDT. Expect delays. Last updated Thu May 8 at 8:43 AM PDT. (DBC-76361)
    Highway 17 Southbound Highway 17 (Patricia Bay Highway), southbound. Special event planned between Lands End Rd and Exit 31 (North Saanich). Starting Wed Jul 23 at 6:00 PM PDT until Wed Jul 23 at 7:30 PM PDT. Victoria Wheelers Cycling Club Bike Race - watch for cyclists at Wain Rd off ramp. Last updated Tue Mar 25 at 9:50 AM PDT. (DBC-74423)
    Highway 19 Southbound Highway 19 (Island Highway), southbound. Road sweeping between Browns Bay Rd and Hamm Rd for 44.8 km (Campbell River). Until Thu May 15 at 5:00 PM PDT. Lane blocked. Watch for traffic control. Slow moving operation. Last updated Mon May 5 at 7:48 AM PDT. (DBC-75898)
    Highway 19 Southbound Highway 19 (Island Highway), southbound. Utility work planned at Browns Bay Rd (6 km north of Campbell River). Starting Tue May 13 at 7:00 AM PDT until Wed May 14 at 5:00 PM PDT. Telus Utility work - Aerial splicing **Urgent work**. Last updated Fri May 9 at 11:57 AM PDT. (DBC-76428)
    Highway 19 Both Directions Highway 19 (Island Highway), in both directions. There will be ditching between Browns Bay Rd and Orange Point Rd for 15.4 km (Campbell River). Starting Mon May 12 at 8:00 AM PDT until Fri May 23 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control personnel. SLOW MOVING OPERATION. Last updated Mon May 5 at 12:34 PM PDT. (DBC-76197)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Utility work planned between Frontage Rd and Dawson Rd for 0.6 km (2 km south of Parksville). Starting Tue May 20 at 9:00 PM PDT until Fri May 23 at 6:00 AM PDT. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - NIGHT WORK. Watch for speed reduction and Work crews. Last updated Mon May 5 at 2:08 PM PDT. (DBC-76206)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Utility work planned between Kinghorn Rd and Northwest Bay Rd for 0.4 km (6 km south of Parksville). Starting Tue May 20 at 9:00 PM PDT until Mon May 26 at 6:00 AM PDT. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - NIGHT WORK, watch for work crews. Last updated Fri May 9 at 9:52 AM PDT. (DBC-76408)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Electrical maintenance planned at Northwest Bay Rd (6 km south of Parksville). Starting Thu May 15 at 7:00 PM PDT until Thu May 15 at 10:30 PM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 11:00 AM PDT. (DBC-76417)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Electrical maintenance planned at Aulds Rd (Nanaimo). Starting Wed May 14 at 7:00 PM PDT until Thu May 15. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 10:57 AM PDT. (DBC-76414)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Electrical maintenance planned at Exit 21: Northfield Rd (Nanaimo). Starting Thu May 15 at 1:00 AM PDT until Thu May 15 at 5:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 10:58 AM PDT. (DBC-76415)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Electrical maintenance planned at Wright Rd (1 km north of Parksville). Starting Thu May 15 at 11:00 PM PDT until Fri May 16 at 2:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 11:01 AM PDT. (DBC-76418)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Electrical maintenance planned at Lee Rd (1 km north of Parksville). Starting Fri May 16 at 2:30 AM PDT until Fri May 16 at 5:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 9 at 11:02 AM PDT. (DBC-76419)
    Highway 19A Highway 19A (Island Highway). Utility work planned between Virginia Dr and Grieve Rd for 1.2 km (1 km north of Courtenay to Courtenay). Starting Thu May 15 at 9:00 AM PDT until Fri May 23 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Telus Aerial placing and Splicing. Last updated Fri May 9 at 10:14 AM PDT. (DBC-76409)
    Highway 19A Northbound Highway 19A (Island Highway), northbound. Utility work planned between Lalum Rd and Ployart Rd for 0.4 km (15 to 16 km south of Campbell River). Starting Wed May 28 at 11:00 PM PDT until Thu May 29 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Rogers - Run communication line. Last updated Wed May 7 at 1:48 PM PDT. (DBC-76326)
    Highway 19A Highway 19A (Island Highway). Utility work planned between Lalum Rd and Ployart Rd for 0.4 km (15 to 16 km south of Campbell River). Starting Tue May 13 at 9:00 AM PDT until Tue May 13 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Rogers - Communications Line Install. Last updated Wed May 7 at 3:21 PM PDT. (DBC-76331)
    Highway 19A Northbound Highway 19A (Island Highway), northbound. Road sweeping between Glenmore Rd and Jubilee Pky for 11.1 km (11 km south of Campbell River to Campbell River). Until Thu May 15 at 5:00 PM PDT. Watch for traffic control. SLOW MOVING OPERATION. Last updated Mon Apr 28 at 10:48 AM PDT. (DBC-75899)
    Highway 19A Highway 19A (Island Highway). Construction work planned between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Starting Wed Jun 4 at 7:00 AM PDT until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100)
    Highway 19A Southbound Highway 19A (Island Highway), southbound. Utility work planned between Crawford Rd and Engles Rd for 1.2 km (1 to 2 km south of Campbell River). Starting Mon May 12 at 9:00 AM PDT until Tue May 13 at 3:00 PM PDT. Single lane alternating traffic will be in effect. BC Hydro Pole Replacement. Last updated Tue May 6 at 1:51 PM PDT. (DBC-76251)
    Highway 20 Highway 20. Utility work between MacK Rd and Walker Park Rd for 0.9 km (9 to 10 km east of Bella Coola). Until Fri May 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watermain Installation. Please watch for signage and personnel. Expect minor delays of up to ten minutes. Last updated Mon Apr 21 at 12:22 PM PDT. (DBC-75347)
    Highway 20 Highway 20. Frost heaves between Olsen Dr and Sawmill Creek Rd for 214.3 km (16 km east of Bella Coola to Tatla Lake). Last updated Sun May 11 at 7:08 PM PDT. (DBCRCON-223122)
    Highway 23 Both Directions Highway 23, in both directions. Watch for falling rocks between Revelstoke Dam Avalanche Gates and Mica Dam for 146.6 km (Revelstoke to 5 km north of Mica Dam). Debris on roadway. Last updated Sun May 11 at 7:11 PM PDT. (DBC-74960)
    Highway 26 Highway 26. Road maintenance work at Stanley Rd (12 km west of Wells). Single lane alternating traffic. Next update time Wed May 14 at 2:00 PM PDT. Last updated Mon May 5 at 9:13 AM PDT. (DBC-76011)
    Highway 28 Both Directions Highway 28, in both directions. Road sweeping between Gold River Hwy and Doyle Rd for 86.3 km (Gold River to Campbell River). Until Thu May 15 at 5:30 PM PDT. Watch for traffic control. Watch for a slow moving vehicle on the shoulder. Last updated Mon Apr 28 at 10:40 AM PDT. (DBC-75847)
    Highway 28 Both Directions Highway 28, in both directions. Bridge maintenance at Western Mine Rd (37 km west of Campbell River). Until Fri May 30 at 7:30 PM PDT. From 7:30 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Active working hours 7:30am to 6:00pm. This is a 24hr 7 day a week operation at Buttle Narrows. Last updated Mon Mar 24 at 12:32 PM PDT. (DBC-74354)
    Highway 28 Both Directions Highway 28, in both directions. There will be ditching between Muchalat Pl and Western Mine Rd for 39.8 km (37 km west of Campbell River to Gold River). Starting Mon May 12 at 8:00 AM PDT until Fri May 23 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control personnel. SLOW MOVING OPERATION. Last updated Mon May 5 at 12:38 PM PDT. (DBC-76199)
    Highway 29 Highway 29. Utility work between Nicholson Rd and Moberly Lake Access for 18.4 km (Chetwynd). Until Fri May 30. From 8:00 AM to 6:00 PM MST on weekdays. Single lane alternating traffic. Last updated Fri May 2 at 3:08 PM MST. (DBC-76108)
    Highway 3 Highway 3 . Maintenance planned at Newton Road 5 km east of Keremeos. Starting Mon Jun 2 at 7:00 AM PST until Fri Jun 6 at 4:00 PM PST. Shoulder will be closed. Work taking place on Newton Road. Last updated Mon Jan 27 at 4:23 PM PST. (DBC-72315)
    Highway 3 Westbound Highway 3 (Crowsnest Highway), westbound. Bridge maintenance at Exit 177 (3 km east of Hope). Exit 177 closed westbound. Watch for traffic control. Last updated Tue May 6 at 7:26 AM PDT. (DBC-76235)
    Highway 3 Eastbound Highway 3 (Crowsnest Highway), eastbound. Road sweeping planned between Sunshine Valley and Garret Rd for 64.7 km (17 km east of Hope to 46 km west of Princeton). Starting Tue May 13 at 8:00 AM PDT until Tue May 13 at 3:00 PM PDT. Right lane will be closed. Cambie Bridge right lane closure. Last updated Sun May 11 at 5:43 PM PDT. (DBC-76481)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Utility work between Sunshine Valley and Allison Pass Summit for 9.7 km (21 to 31 km east of Hope). Until Fri May 16. From 9:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Fri Apr 25 at 9:13 AM PDT. (DBC-75788)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Road sweeping planned between Second Avalanche Gate and Allison Pass Summit for 29.6 km (25 to 54 km east of Hope). Starting Mon May 12 at 8:00 AM PDT until Mon May 12 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Cedar Creek Bridges sweeping and bridge washing. Last updated Sun May 11 at 5:45 PM PDT. (DBC-76480)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724)
    Highway 3 Highway 3 (Crowsnest Highway). Utility work between Allison Pass Summit and Manning Park Resort (58 km east of Hope). Until Thu May 15 at 4:30 PM PDT. Lane Closure. Hydro Pole replacement from Gibson Pass Rd. To Manning Park. Last updated Tue Apr 15 at 2:51 PM PDT. (DBC-75425)
    Highway 3 Westbound Highway 3 (Crowsnest Highway), westbound. Utility work planned between Garret Rd and Tower Rd for 1.2 km (46 to 47 km west of Princeton). Starting Mon May 12 until Fri May 23 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Right lane will be blocked. Speed reduced to 80km/hr. No work on May 16 - May 20. Last updated Thu May 8 at 12:40 PM PDT. (DBC-76369)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Junction Hwy 6NS and West Creston Rd for 55.4 km (14 km east of Salmo to 10 km west of Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73304)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Watch for falling rocks between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass). Next update time Mon Jun 2 at 11:30 AM PDT. Last updated Thu Apr 10 at 11:53 AM PDT. (DBC-75211)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Moyie Swansea Bridge and Lumberton Rd for 4.5 km (13 km east of Moyie to 11 km west of Cranbrook). Starting Thu May 15 at 7:00 AM MDT until Thu May 15 at 2:30 PM MDT. Last updated Tue May 6 at 8:57 AM MDT. (DBC-76240)
    Highway 31 Highway 31. Watch for falling rocks between Cascade Creek Mainline and Junction Hwy 23 for 57.5 km (Trout Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-74515)
    Highway 33 Both Directions Highway 33, in both directions. Paving operations between Kettle Valley Rail Trail and Beaverdell Station Rd for 34.7 km (Beaverdell to Westbridge). Until Fri Jul 11. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Watch for uneven pavement and milled surfaces. No work on long weekends. Last updated Thu Apr 24 at 12:47 PM PDT. (DBC-75739)
    Highway 33 Southbound Highway 33, southbound. Utility work planned between Highway 97 and Ziprick Rd for 0.2 km (Kelowna). Starting Wed May 14 at 7:00 AM PDT until Sat May 24 at 5:00 PM PDT. Sidewalk is closed. Last updated Fri May 9 at 10:52 AM PDT. (DBC-76411)
    Highway 37 Both Directions Highway 37, in both directions. Bridge construction at Hanna North Bridge (7 km north of Meziadin). Single lane alternating traffic. With a 4 Meter Width Restriction and 85 tonne Load Limit - until further notice. Expect minor delays. Last updated Mon May 5 at 1:50 PM PDT. (DBC-76204)
    Highway 37 Highway 37. Frost heaves between Bob Quinn Camp and the end of Highway 37 for 422.9 km (Bob Quinn to British Columbia and Yukon Border). Last updated Sun May 11 at 3:47 PM PDT. (DBCRCON-223126)
    Highway 37 Highway 37. Road sweeping between Devils Cr Bridge and Eastman Cr Rest Area for 36.9 km (11 km north of Bob Quinn to 44 km south of Tatogga). For the next week. Last updated Mon May 5 at 7:14 AM PDT. (DBC-76163)
    Highway 37 Highway 37. Road sweeping between Stikine Bridge and Williams Rd for 49.4 km (30 km north of Iskut to Dease Lake). For the next week. Last updated Mon May 5 at 7:19 AM PDT. (DBC-76165)
    Highway 37A Both Directions Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). There is debris on the road. Next update time Tue May 13 at 12:00 PM PDT. Last updated Sun May 11 at 6:05 PM PDT. (DBC-74957)
    Highway 3A Highway 3A. Watch for falling rocks between Kootenay Bay Ferry and Junction Hwy 3 for 78.0 km (1 km north of Kootenay Bay Ferry Landing to Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73148)
    Highway 4 Both Directions Highway 4, in both directions. Special event planned between Yew Wood Rd and Industrial Way (Tofino). Starting Sat May 24 at 1:00 PM PDT until Sat May 24 at 4:00 PM PDT. Expect minor delays. Watch for traffic control personnel. SPECIAL EVENT - 10K CRUSADE FOR A CHANGE - watch for runners, walkers and traffic control. Intermittent stops to allow for runners/walkers to cross the intersection of HWY 4 and Industrial Way. Last updated Mon May 5 at 3:08 PM PDT. (DBC-76209)
    Highway 4 Both Directions Highway 4, in both directions. Construction work between Elizabeth St and Helen St for 0.2 km (Port Alberni). Until Fri May 16 at 5:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - watch for work crews. Last updated Thu May 1 at 2:28 PM PDT. (DBC-74413)
    Highway 4 Both Directions Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Fri Aug 1 at 10:00 AM PDT. Last updated Wed Apr 2 at 10:13 AM PDT. (DBC-52953)
    Highway 5 Northbound Highway 5 (Coquihalla South), northbound. Bridge maintenance planned between Exit 183: Othello Rd and Exit 192 for 1.2 km (14 to 15 km north of Hope). Starting Thu May 15 at 8:00 AM PDT until Thu May 15 at 11:00 AM PDT. Right lane will be blocked. Last updated Fri May 9 at 11:32 AM PDT. (DBC-76426)
    Highway 5 Southbound Highway 5 (Coquihalla South), southbound. Material spill between Exit 231: Mine Creek Rd and Exit 228: Coquihalla Lakes Rd (12 km north of Coquihalla Summit). Watch for slippery sections. Oil spill on in southbound lanes. Drive with caution. Next update time Mon May 12 at 9:00 AM PDT. Last updated Sun May 11 at 7:52 PM PDT. (DBC-76449)
    Highway 5 Southbound Highway 5, southbound. Utility work between Holland Rd and Lost Creek Rd for 3.7 km (3 to 7 km north of Clearwater). Until Thu May 15 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Mon Apr 21 at 12:35 PM PDT. (DBC-73940)
    Highway 5A Both Directions Highway 5A, in both directions. Paving operations between Douglas Lake Rd and Long Lake Rd for 58.8 km (Kamloops to 25 km north of Merritt). Until Sat Jun 28. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Sections of single lane alternating traffic. Watch for traffic control. Expect delays of up to 20 minutes. Last updated Sat May 10 at 7:02 AM PDT. (DBC-76454)
    Highway 6 EW Highway 6 EW. Paving operations between Robazzo Rd and Idler Rd for 19.7 km (15 km west of Nakusp to 17 km east of Fauquier). Until Thu May 15 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Mon Apr 21 at 12:35 PM PDT. (DBC-75294)
    Highway 6 NS Both Directions Highway 6 NS, in both directions. Watch for falling rocks between Summit Lake Rd and Memphis Creek for 50.2 km (7 km north of Slocan to Summit Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-73130)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). Until Sat May 31 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. May 5 - May 10, May 12 - May 16, May 20 - May 24, May 26 żżż May 31. No construction scheduled for May 17 - May 19. Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Last updated Mon May 5 at 8:13 AM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work between Madaris Rd and Rowan Rd for 2.0 km (4 to 2 km east of Mission). Until Sat May 31 at 3:00 PM PDT. Watch for traffic control. No work during the long weekend. Last updated Mon May 5 at 4:09 PM PDT. (DBC-76211)
    Highway 7 Eastbound Highway 7 (Lougheed Highway), eastbound. Utility work between Wilson Rd and Key Rd for 0.4 km (Kent). Until Mon May 12. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Mon Apr 28 at 12:03 PM PDT. (DBC-75679)
    Highway 7B Eastbound Highway 7B (Mary Hill Bypass), eastbound. Paving operations planned between United Blvd and Shaughnessy St for 1.9 km (Coquitlam to Port Coquitlam). Starting Tue May 13 at 10:00 PM PDT until Wed May 14 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Wed May 7 at 11:55 AM PDT. (DBC-76320)
    Highway 7B Eastbound Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617)
    Highway 7B Both Directions Highway 7B (Mary Hill Bypass), in both directions. Construction work between Kingsway Ave and the end of Highway 7B (Mary Hill Bypass) for 0.8 km (Port Coquitlam). Until Fri Jun 13 at 2:00 PM PDT. From 9:00 AM to 2:00 PM PDT daily. Lane closures in both directions in effect. Bus stop improvement project. Last updated Wed May 7 at 11:38 AM PDT. (DBC-76317)
    Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Thu May 8 at 10:58 AM PDT. (DBC-72877)
    Highway 8 Both Directions Highway 8, in both directions. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.5 km (8 to 9 km east of Spences Bridge). Until Thu May 15 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 11. Last updated Fri May 9 at 6:03 AM PDT. (DBC-76366)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.6 km (9 to 11 km east of Spences Bridge). Until Fri May 16 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. SITE 9/10. Next update time Fri May 16 at 5:00 PM PDT. Last updated Fri May 9 at 6:07 AM PDT. (DBC-74796)
    Highway 8 Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.5 km (12 km east of Spences Bridge). Until Fri May 16 at 12:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 8. Next update time Fri May 16 at 12:00 PM PDT. Last updated Thu May 8 at 11:59 AM PDT. (DBC-74599)
    Highway 8 Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 km east of Spences Bridge). Until Fri May 16 at 12:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 6. Next update time Fri May 16 at 12:00 PM PDT. Last updated Thu May 8 at 12:02 PM PDT. (DBC-74597)
    Highway 8 Highway 8. Paving operations between Porcupine Ridge Rd and Shackan IR for 0.9 km (18 to 19 km east of Spences Bridge). Until Fri May 16 at 12:00 PM PDT. Single lane alternating traffic. Watch for traffic control. SITE 5. Last updated Thu May 8 at 1:06 PM PDT. (DBC-76090)
    Highway 8 Highway 8. Construction work between Shackan IR and Dot Ranch Cut-Off Rd East for 0.8 km (21 to 22 km east of Spences Bridge). Until Fri May 16 at 12:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 4. Next update time Fri May 16 at 12:00 PM PDT. Last updated Thu May 8 at 12:01 PM PDT. (DBC-74592)
    Highway 93 Both Directions Highway 93, in both directions. Bridge maintenance planned between Dorr Cut-off Rd and Fitzpatrick Rd for 4.7 km (8 to 12 km north of Grasmere). Starting Tue May 13 at 9:00 AM MDT until Tue May 13 at 5:00 PM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Speed reduction to 50 km/hour. Last updated Thu Apr 24 at 8:59 AM MDT. (DBC-75712)
    Highway 93 Both Directions Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Speed reduced to 50km/h. Single lane alternating traffic in effect May 5-10th 9am-3pm. Last updated Mon May 5 at 8:33 AM MDT. (DBC-73931)
    Highway 97 Highway 97. Utility work planned at Maple Drive. Starting Tue May 13 until Wed May 14. From 7:00 AM to 5:00 PM PDT on Tuesday and Wednesday. Northbound lane will be closed. Shoulder will be closed. Turn lane narrows when turning from Maple Drive on to Hwy 97 southbound.Please watch for signage and personnel. Last updated Wed May 7 at 2:02 PM PDT. (DBC-76328)
    Highway 97 Southbound Highway 97, southbound. Road construction work between Sandhill Rd and Pineview Dr (1 km south of Penticton). Until Fri Oct 24. Lane Closure. Shoulder closed. Industrial traffic may slow or block regular traffic. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Tue Jan 14 at 9:05 PM PST. (DBC-71783)
    Highway 97 Highway 97. Bridge maintenance planned between W Warren Ave and W Duncan Ave for 0.5 km (Penticton). Starting Mon May 12 at 9:00 AM PDT until Mon May 12 at 3:00 PM PDT. Lane Closure. Watch for slow moving vehicles, slow down to 70km/h and move over when passing. Last updated Fri May 9 at 7:25 AM PDT. (DBC-76395)
    Highway 97 Highway 97. Bridge maintenance planned between Riverside Dr and Burnaby Ave W (1 km north of Penticton). Starting Tue May 13 at 9:00 AM PDT until Tue May 13 at 3:00 PM PDT. Lane Closure. Bridge washing. Watch for slow moving vehicles. Slow down to 70 km/h and move over when passing. Last updated Fri May 9 at 7:35 AM PDT. (DBC-76399)
    Highway 97 Highway 97. Bridge maintenance planned between Riverside Dr and Burnaby Ave W for 0.1 km (Penticton). Starting Mon May 12 at 9:00 AM PDT until Mon May 12 at 3:00 PM PDT. Lane Closure. Bridge washing. Watch for slow moving vehicles. Slow down to 70 km/h and move over when passing. Last updated Fri May 9 at 7:31 AM PDT. (DBC-76397)
    Highway 97 Highway 97. Bridge maintenance planned between Sage Mesa Dr and Wharf St (Summerland). Starting Tue May 13 at 9:00 AM PDT until Tue May 13 at 3:00 PM PDT. Lane Closure. Bridge washing. Watch for slow moving vehicles. Slow down to 70 km/h and move over when passing. Last updated Fri May 9 at 7:38 AM PDT. (DBC-76400)
    Highway 97 Highway 97. Bridge maintenance planned between Peach Orchard Rd and Rosedale Ave (Summerland). Starting Tue May 13 at 9:00 AM PDT until Tue May 13 at 3:00 PM PDT. Lane Closure. Bridge washing. Watch for slow moving vehicles. Slow down to 70 km/h and move over when passing. Last updated Fri May 9 at 7:40 AM PDT. (DBC-76401)
    Highway 97 Both Directions Highway 97, in both directions. Road sweeping between Trepanier Bench Rd and Seclusion Bay Rd for 4.0 km (Peachland). Watch for traffic control. Last updated Sat May 10 at 6:30 PM PDT. (DBC-76447)
    Highway 97 Northbound Highway 97, northbound. Bridge maintenance between Campbell Rd and Abbott St for 1.9 km (Kelowna). Until Thu May 15. From 8:30 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Night time construction work. WIDE LOADS USE CAUTION AND ARE ADVISED TO CALL AHEAD 250-469-0330. Last updated Fri May 9 at 11:28 AM PDT. (DBC-76425)
    Highway 97 Both Directions Highway 97, in both directions. Paving operations between Gatzke Rd and Clerke Rd for 15.9 km (Coldstream to 13 km north of Kelowna). Until Mon Jun 30 at 6:00 AM PDT. From 3:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Last updated Mon Apr 21 at 12:39 PM PDT. (DBC-75276)
    Highway 97 Both Directions Highway 97, in both directions. Road sweeping between 48 Ave and Highland Rd for 6.4 km (Vernon). Until Thu May 15. From 7:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Expect intermittent lane closures. Watch for slow moving equipment and shadow vehicles. Last updated Wed May 7 at 12:56 PM PDT. (DBC-75730)
    Highway 97 Highway 97 (Cariboo Connector). Utility work between Soda Creek-MacAlister Rd and Kersley-Dale Landing Rd for 42.7 km (17 km south of Quesnel to 39 km north of Wildwood). Until Sat May 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Vegetation maintenance along roadside. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Thu May 1 at 8:37 AM PDT. (DBC-76046)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Construction work between Umiti Pit Rd and Pollard Rd (13 km north of Quesnel). Until Tue Sep 30. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Expect delays up to 5 minutes. Last updated Fri May 2 at 2:09 PM PDT. (DBC-76097)
    Highway 97 Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Mon Jun 30 at 10:00 AM PDT. Last updated Tue Apr 29 at 10:52 AM PDT. (DBC-71474)
    Highway 97 Southbound Highway 97, southbound. Construction work planned between Armstrong Ave and 18th Ave for 0.4 km (Prince George). Starting Mon May 12 at 9:00 AM PDT until Fri Jun 13 at 11:45 PM PDT. From 7:00 PM to 6:00 AM PDT and from 9:00 AM to 4:00 PM PDT on weekdays and Saturday. Right lane will be closed. Watch for traffic control personnel. Next update time Thu Jun 12 at 9:00 AM PDT. Last updated Sat May 10 at 5:32 PM PDT. (DBC-76466)
    Highway 97 Northbound Highway 97, northbound. Geotechnical investigation between North Nechako Rd and Blueberry Rd for 0.1 km (Prince George). Until Tue May 13. Lane Closure. Detour in effect. Watch for traffic control. Highway 97 On Ramp from Cameron Street Round-a-bout to Highway 97 merge lane is closed. Last updated Mon May 5 at 11:02 AM PDT. (DBC-76192)
    Highway 97 Both Directions Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426)
    Highway 97 Southbound Highway 97, southbound. Utility work planned between Summit Lake Rd and Mitchell Rd for 5.3 km (29 to 34 km north of Prince George). Starting Wed May 21 at 9:00 AM PDT until Wed May 21 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 8 at 3:51 PM PDT. (DBC-76378)
    Highway 97 Southbound Highway 97, southbound. Special event planned between Carp Lake Rd and Haight Rd for 6.0 km (McLeod Lake). Starting Wed Aug 6 at 9:00 AM PDT until Wed Aug 6 at 12:00 PM PDT. Lane Closure. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Last updated Thu Apr 10 at 2:54 PM PDT. (DBC-75226)
    Highway 97 Highway 97. Utility work between Kennedy Rd and Powder King Rd for 30.2 km (25 km north of McLeod Lake to 4 km south of Pine Pass Summit). Until Fri May 30. Single lane alternating traffic. Watch for traffic control. Last updated Fri Apr 4 at 9:05 AM PDT. (DBC-74907)
    Highway 97 Southbound Highway 97, southbound. Bridge construction between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 km south of Chetwynd). Until Mon Jun 30. Expect minor delays. Watch for crews and equipment working along the side of the road. Last updated Wed Mar 12 at 2:49 PM MST. (DBC-73850)
    Highway 97 Highway 97 (Alaska Highway). Maintenance planned at Taylor Bridge (Taylor). Starting Tue May 20 at 7:00 PM MST until Thu Jun 26 at 3:30 AM MST. From 7:00 PM to 3:30 AM MST on weekdays. Single lane alternating traffic will be in effect. Loads exceeding 3.85 m in width will wait until 3:30 am to cross. Avoid lengthy delays, schedule oversized loads within 7 pm - 3:30 am time frame. Questions/concerns, email acrawford@dawsonroadmaintenance.Ca. Last updated Wed May 7 at 10:52 PM MST. (DBC-76270)
    Highway 97 Both Directions Highway 97 (Alaska Highway), in both directions. Bridge maintenance between Big Bam Rd and McMahon Dr for 1.0 km (Taylor). Until Thu May 15 at 3:30 PM MST. From 9:00 AM to 3:00 PM MST on weekdays. Width limit 3.85 m. 20 minute delays. Single lane alternating traffic, and pilot car traffic in effect. Midday break: 12pm-1pm. Loads exceeding 3.85M, wait until 3pm. Questions: 250-262-2600. Last updated Tue Apr 22 at 12:40 PM MST. (DBC-75427)
    Highway 97A Both Directions Highway 97A, in both directions. Road sweeping between the start of Highway 97A and Wagner Rd for 14.0 km (12 to 26 km south of Enderby). Until Thu May 15. From 7:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Expect intermittent lane closures. Watch for slow moving equipment and shadow vehicles. Last updated Wed May 7 at 12:56 PM PDT. (DBC-75729)
    Highway 97C Highway 97C. Utility work planned between Charles Ranch Equine and 5.7 KM North of Mountain High Retreat - North Road. Starting Mon May 12 until Fri May 16. From 8:00 AM to 4:00 PM PDT on weekdays. Southbound lane will be closed. Shoulder will be closed. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Wed May 7 at 1:04 PM PDT. (DBC-76322)
    Highway 99 Southbound Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066)
    Highway 99 Southbound Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330)
    Highway 99 Southbound Highway 99, southbound. Road construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Mon May 12 until Thu May 15. From 10:00 PM to 5:30 AM PDT on Monday, Tuesday, Wednesday and Thursday. Right turn lane will be closed. Watch for traffic control personnel. Next update time Thu May 15 at 9:00 AM PDT. Last updated Fri Apr 25 at 5:28 PM PDT. (DBC-75821)
    Highway 99 Both Directions Highway 99, in both directions. Bridge maintenance planned between Lehigh Rd and Stawamus Chief Provincial Pk for 1.7 km (Squamish). Starting Mon May 12 at 7:30 AM PDT until Mon May 12 at 3:30 PM PDT. Right lane will be closed. Watch for traffic control personnel. Crews will be working between Gonzales Creek and Shannon Creek. Last updated Fri May 9 at 3:25 PM PDT. (DBC-76434)
    Highway 99 Northbound Highway 99, northbound. Construction work between Scott Cres and Cleveland Ave (Squamish). Until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane closed. Shoulder closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601)
    Highway 99 Northbound Highway 99, northbound. Maintenance planned between Centennial Way and Mamquam Rd for 0.9 km (Squamish). Starting Mon May 12 at 7:30 AM PDT until Mon May 12 at 3:30 PM PDT. Left lane will be closed. Watch for traffic control personnel. Crews will be working from the Mamquam River Bridge. Last updated Fri May 9 at 3:29 PM PDT. (DBC-76435)
    Highway 99 Northbound Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439)
    Highway 99 Both Directions Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437)
    Highway 99 Both Directions Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529)
    Highway 99 Both Directions Highway 99, in both directions. Rock slope stabilization between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Until Sat Jun 21 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 24 at 1:40 PM PDT. (DBC-75530)
    Highway 99 Highway 99. Bridge maintenance between Lil'wat Pl and Texas Creek Rd for 43.0 km (Lillooet). From 6:00 AM to 3:00 PM PDT on Monday, Tuesday and Wednesday. Lane Closure. Expect Bridge Cleaning between Lillooet and Blowdown. Short Delays possible. Last updated Fri Apr 25 at 1:19 PM PDT. (DBC-75810)
    Other Roads Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed Jul 2 at 10:00 AM MST. Last updated Thu Jan 2 at 11:37 AM MST. (DBC-30093)
    Other Roads Both Directions Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Jun 30 at 10:00 AM PDT. Last updated Tue Apr 1 at 8:55 AM PDT. (DBC-35978)
    Other Roads Both Directions Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays and Sunday. Single lane alternating traffic. Watch for traffic control. No work on long weekends. Next update time Mon Jun 30 at 9:00 AM PDT. Last updated Wed May 7 at 11:52 AM PDT. (DBC-68621)
    Other Roads Both Directions Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Expect delays. Partial road washout, obey signage. Next update time Mon May 19 at 8:00 AM PDT. Last updated Thu Apr 17 at 7:56 AM PDT. (DBC-71008)
    Other Roads Both Directions Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Night Work from 7 pm to 7 am, Construction work between Highway 17 and Ravine Way near Victoria. Expect delays and traffic interruptions on Hwy 17, Ravine Way and Carey Rd both directions. Construction zone in effect 24/7. Next update time Thu Jun 5 at 10:00 AM PDT. Last updated Mon May 5 at 8:38 AM PDT. (DBC-71339)
    Other Roads Both Directions Fairbanks Rd, in both directions. Utility work between 1110 Fairbanks Rd and 1108 Fairbanks Rd. Until Sat May 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility Work - Pipe installation. Watch for work crews. Last updated Tue Apr 15 at 4:20 PM PDT. (DBC-73197)
    Other Roads Both Directions Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. WATERMAIN INSTALL - Watch for work crews. Last updated Tue Mar 18 at 11:57 AM PDT. (DBC-73760)
    Other Roads Eastbound Long Harbour Rd, eastbound. Utility work between Welbury Dr and Ferry Terminal in Salt Spring Island. Until Fri May 16 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Apr 21 at 12:49 PM PDT. (DBC-74731)
    Other Roads Both Directions 56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742)
    Other Roads Both Directions 264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747)
    Other Roads Both Directions Eakin Creek Rd, in both directions. There are rocks on the road between Highway 24 and Eakin Creek Canyon Provincial Park. Road closed. Assessment in progress. Next update time Wed May 14 at 3:00 PM PDT. Last updated Wed May 7 at 4:12 PM PDT. (DBC-74750)
    Other Roads Both Directions Mission Mountain Road, in both directions. Muddy sections between Mission Dam and Shalalth Cut Off near Lillooet. Last updated Sun May 11 at 6:05 PM PDT. (DBC-74943)
    Other Roads Both Directions Riverside Rd, in both directions. Roadway obstruction between 233 Riverside Rd and 136 Riverside Rd. Road closed. Sinkhole blocking both lanes. All properties are accessible on either side of the closure. Next update time Mon Jun 9 at 10:00 AM PDT. Last updated Sat May 10 at 6:05 PM PDT. (DBC-75092)
    Other Roads Hardy Bay Rd. Special event planned between Market St and Coal Harbour Rd 1 km north of Port Hardy. Starting Sun Jun 1 at 7:00 AM PDT until Sun Jun 1 at 2:00 PM PDT. Hardy Hussle June 1 7am to 2pm. Last updated Tue Apr 8 at 3:23 PM PDT. (DBC-75103)
    Other Roads Both Directions Fisher Rd, in both directions. Special event planned between Holland Ave and Watson Ave. Starting Sat Aug 23 at 7:00 AM PDT until Sat Aug 23 at 5:00 PM PDT. Road closure planned. Cobble Hill Fair. Last updated Mon Apr 14 at 9:51 AM PDT. (DBC-75349)
    Other Roads Westbound University Blvd, westbound. Geotechnical investigation between Blanca St and Wesbrook Mall 1 km north of Vancouver. Until Fri Jun 6. From 7:30 AM to 7:00 PM PDT daily. Left shoulder closed. Geotechnical investigation on median. Watch for traffic control. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75801)
    Other Roads Southbound Bradner Rd, southbound. Utility work between Downes Rd and Highway 1 in Abbotsford. Until Sat May 31. From 7:00 AM to 5:00 PM PDT daily. Work taking place underneath Highway 1 from Downes Rd to Downes Rd on Bradner. Last updated Fri Apr 25 at 1:23 PM PDT. (DBC-75811)
    Other Roads Both Directions Cypress Bowl Road, in both directions. Road maintenance work between Uplands Way and Cypress Place 1 km north of West Vancouver. Until Sat May 31. From 7:30 AM to 4:00 PM PDT on weekdays. Expect minor delays. Last updated Fri Apr 25 at 4:47 PM PDT. (DBC-75820)
    Other Roads Highway 16 (Yellowhead). Utility work at Rainbow Chain Up near Prince Rupert. Until Fri May 23. From 8:00 AM to 6:00 PM PDT on weekdays. Road closed intermittently. Watch for traffic control. Last updated Tue Apr 29 at 3:42 PM PDT. (DBC-75965)
    Other Roads Telegraph Road. Utility work planned between 4395 Telegraph Road and 4405 Telegraph Road near Cobble Hill. Starting Thu May 15 until Thu May 22 at 6:00 PM PDT. From 8:00 AM to 6:00 PM PDT daily. Shoulder will be closed. Gas line installation. Last updated Thu May 1 at 11:56 AM PDT. (DBC-76060)
    Other Roads Both Directions Deloume Rd, in both directions. Utility work between Lodge Pole Rd and Lilmac Rd. Until Sat May 31 at 6:00 PM PDT. Single lane alternating traffic. Last updated Wed May 7 at 11:32 AM PDT. (DBC-76316)
    Other Roads Northbound United Blvd, northbound. Paving operations planned at Hwy 7 in Coquitlam. Starting Mon May 12 at 10:00 PM PDT until Tue May 13 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Wed May 7 at 11:52 AM PDT. (DBC-76319)
    Other Roads Mission Mountain Road. Special event planned between Carpenter Lake Road and Shalalth Road 85 km west of Lillooet. Starting Mon May 12 until Fri May 30. From 7:00 AM to 5:00 PM PDT daily. Lane closures in both directions planned. Helicopter in use will be harvesting timber. Expect delays of up to 30 minutes. Traffic to be let through when safe to do so. Please obey all signage and personnel. Last updated Thu May 8 at 2:45 PM PDT. (DBC-76376)
    Other Roads Both Directions Summers Creek Rd, in both directions. Utility work planned between Highway 5A and Prospect Dr 16 km north of Princeton. Starting Tue May 20 until Thu Jun 19 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Expect single lane traffic in multiple work zones. Last updated Fri May 9 at 6:21 AM PDT. (DBC-76392)
    Other Roads Fairview Rd. Bridge maintenance planned between HWY 97 and Satikw Drive. Starting Mon May 12 at 9:00 AM PDT until Mon May 12 at 3:00 PM PDT. Lane Closure. Bridge washing. Watch for slow moving vehicles. Slow down and move over when passing. Last updated Fri May 9 at 7:34 AM PDT. (DBC-76398)
    Other Roads Both Directions Mt. Seymour Rd, in both directions. Special event planned between Mushroom Parking Lot and Enquist Lodge. Starting Thu May 15 at 7:00 AM PDT until Thu May 15 at 10:00 AM PDT. Filming work. Expect minor delays and watch for crews. Last updated Fri May 9 at 1:35 PM PDT. (DBC-76430)
    Other Roads Eastbound Bay St, eastbound. Utility work planned between Keith Rd and Highway 1 in West Vancouver. Starting Mon May 12 until Mon May 19. Last updated Fri May 9 at 3:20 PM PDT. (DBC-76433)
    Other Roads Both Directions Main St, in both directions. Utility work planned between Mountain Highway and Phibbs Exchange 1 km north of North Vancouver - District. Starting Tue Jun 3 at 10:00 AM PDT until Tue Jun 3 at 2:00 PM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Last updated Fri May 9 at 4:51 PM PDT. (DBC-76440)
    Telegraph Creek Rd Telegraph Creek Rd (Highway 51). Muddy sections between Stikine Ave and Riverview Dr for 56.6 km (Telegraph Creek to 51 km west of Dease Lake). Last updated Sun May 11 at 3:47 PM PDT. (DBCRCON-223127)
    Upper Arrow Lake Ferry Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712)
    Westside Rd Westside Rd. Construction work planned between Old Ferry Wharf Rd and Sailview Bay for 1.4 km (2 km west of West Kelowna to West Kelowna). Starting Mon May 12 at 7:00 AM PDT until Fri May 16 at 3:00 PM PDT. Single lane alternating traffic will be in effect. CONSTRUCTING A LOCK BLOCK WALL AND SIDEWALK ON THE NORTH SIDE OF WESTSIDE ROAD, AND BACKFILLING AGAINST SIDEWALK Westside Rd between Old Ferry Wharf Rd and Bear Creek Rd. Last updated Mon May 5 at 1:41 PM PDT. (DBC-76202)