-
Peace / Highway 97 Both Directions
-
[Truncated] Highway 97 (Alaska Highway), in both directions. Maintenance planned at Taylor Bridge (Taylor). Starting Tue May 20 at 7:00 PM MST until Thu Jun 26 at 3:30 AM MST. From 7:00 PM to 3:30 AM MST on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Overweight and oversized loads exceeding widths of 3.85 m (12.6żżż) will be required to wait until after 3:30 am to cross. To avoid lengthy delays, please schedule oversized loads around the 7:00
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Today Tonight Fort St. John 15 4 Dawson Creek 15 3 Chetwynd 15 3 Highway 97 - Pine Pass - - Source: Environment Canada