• Events for Lower Mainland Sunshine Coast
  • Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987)
    Highway 13 Southbound Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Special event between 57A Ave and 58 Ave (Surrey). Until Tue May 20. From 7:00 AM to 1:00 PM PDT on weekends, Monday and Tuesday. Watch for traffic control. Expect delays. The Cloverdale Rodeo will be taking place. Next update time Tue May 20 at 1:00 PM PDT. Last updated Wed May 14 at 3:15 PM PDT. (DBC-76634)
    Highway 17 Eastbound Highway 17, eastbound. Night time construction work planned between Tannery Rd and Bridgeview Dr for 3.3 km (Surrey). Starting Wed May 21 until Fri May 23. From 9:00 PM to 5:00 AM PDT on Wednesday, Thursday, Friday and Saturday. Construction work planned. Watch for traffic control personnel. Detour via Tannery Road to Scott Road to Bridgeview Drive. Next update time Fri May 23 at 5:00 AM PDT. Last updated Fri May 16 at 5:28 PM PDT. (DBC-76737)
    Highway 1A Both Directions Highway 1A, in both directions. Bridge construction at Pattullo Bridge (New Westminster). Until Tue May 20 at 5:00 AM PDT. Road closed. Alternate route via Port Mann Bridge, or Queensborough and Alex Fraser bridges. Next update time Tue May 20 at 5:00 AM PDT. Last updated Fri May 9 at 3:51 PM PDT. (DBC-76436)
    Highway 99 Both Directions Highway 99, in both directions. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Tue May 20 at 11:00 PM PDT until Wed May 21 at 4:30 AM PDT. Road closure planned. Watch for traffic control personnel. Detour via Steveston Highway on and off ramps https://www.Highway99tunnel.Ca/current-work/. Next update time Wed May 21 at 4:30 AM PDT. Last updated Wed May 14 at 11:40 AM PDT. (DBC-76583)
    Other Roads Eastbound Mt Seymour Pkwy, eastbound. Special event between Riverside Dr and Roche Point Dr 1 km north of North Vancouver - District. Road closed. Watch for traffic control. Detour in effect. North Shore Triathlon. Race starts / finishes at Ron Andrews Community Centre. All westbound travel will remain open. Tripeaks.Ca/home-triathlon/. Next update time Mon May 19 at 12:00 PM PDT. Last updated Wed May 14 at 4:36 PM PDT. (DBC-76648)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Geotechnical investigation between Riverside Rd and Exit 90: McCallum Rd for 0.6 km (Abbotsford). Until Fri May 23. From 8:00 PM to 5:00 AM PDT daily. Shoulder closed. Last updated Mon Apr 28 at 1:41 PM PDT. (DBC-75906)
    Highway 10 Both Directions Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278)
    Highway 101 Westbound Highway 101, westbound. Electrical maintenance planned between Hallowell Rd and Egmont Rd for 5.2 km (40 to 45 km west of Sechelt). Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 5:00 PM PDT. Utility work planned. Right lane will be blocked. Last updated Tue May 13 at 9:47 AM PDT. (DBC-76576)
    Highway 101 Westbound Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-72411)
    Highway 101 Westbound Highway 101, westbound. Tree pruning planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu May 22 at 7:30 AM PDT until Thu May 22 at 11:30 AM PDT. Last updated Fri May 16 at 11:08 AM PDT. (DBC-76726)
    Highway 101 Both Directions Highway 101, in both directions. Utility work planned between Field Rd and McCullough Rd (Sechelt). Starting Tue Jun 3 at 7:30 AM PDT until Tue Jun 3 at 5:00 PM PDT. Lane Closure. Watch for traffic control personnel. Expect delays. Last updated Fri May 16 at 4:31 PM PDT. (DBC-76735)
    Highway 11 Both Directions Highway 11, in both directions. Geotechnical investigation between McClary Ave and South Fraser Way for 1.2 km (Abbotsford). Until Fri May 23. From 8:00 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Watch for traffic control. Last updated Mon Apr 28 at 1:39 PM PDT. (DBC-75905)
    Highway 11 Northbound Highway 11, northbound. Bridge maintenance between Riverside St and London Ave Overpass for 1.9 km (Abbotsford to Mission). Until Fri May 30. From 9:00 PM to 6:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Thu May 1 at 9:13 AM PDT. (DBC-76050)
    Highway 13 Both Directions Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197)
    Highway 15 Southbound Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Road construction work planned at 60 Ave (Surrey). Starting Tue May 20 at 8:00 PM PDT until Tue May 27 at 6:00 AM PDT. From 8:00 PM to 6:00 AM PDT daily. Right turn lane will be closed. Left turn lane will be closed. Last updated Wed May 14 at 1:20 PM PDT. (DBC-76631)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Special event at 62 Ave (Surrey). Until Mon May 19. From 10:00 AM to 10:00 PM PDT daily. Right turn lane closed. Left turn lane closed. Watch for traffic control. 62nd Avenue closed for Cloverdale Rodeo. Last updated Wed May 14 at 2:58 PM PDT. (DBC-76639)
    Highway 17 Southbound Highway 17, southbound. Road maintenance work planned at Exit 13 (Delta). Starting Sun May 18 at 10:00 PM PDT until Mon May 19 at 3:00 AM PDT. Exit ramp will be closed. Watch for traffic control personnel. Last updated Wed May 14 at 11:44 AM PDT. (DBC-76628)
    Highway 17 Westbound Highway 17, westbound. Construction work planned between Grace Rd and Highway 91 Connector for 0.2 km (Delta to Surrey). Starting Tue May 27 until Wed May 28. From 8:00 AM to 2:00 PM PDT on Tuesday and Wednesday. Right turn lane will be closed. Shoulder will be closed. Last updated Thu May 15 at 2:48 PM PDT. (DBC-76687)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724)
    Highway 3 Highway 3 (Crowsnest Highway). Road sweeping planned between Thistle Rd and Tower Rd for 0.6 km (48 to 47 km west of Princeton). Starting Wed May 21 at 9:00 AM PDT until Thu May 22 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Wednesday and Thursday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Truck speed limit 0 km/h. Slow down for crew and slow moving vehicle. Last updated Thu May 15 at 4:20 PM PDT. (DBC-76694)
    Highway 3 Westbound Highway 3 (Crowsnest Highway), westbound. Utility work between Garret Rd and Tower Rd for 1.2 km (46 to 47 km west of Princeton). Until Fri May 23 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Right lane is blocked. Speed reduced to 80km/hr. No work on May 16 - May 20. Last updated Thu May 8 at 12:40 PM PDT. (DBC-76369)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). Until Sat May 31 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. May 12 - May 16, May 20 - May 24, May 26 - May 31. No construction scheduled for May 17 - May 19. Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Last updated Mon May 12 at 8:32 AM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work between Madaris Rd and Rowan Rd for 2.0 km (4 to 2 km east of Mission). Until Sat May 31 at 3:00 PM PDT. Watch for traffic control. No work during the long weekend. Last updated Mon May 5 at 4:09 PM PDT. (DBC-76211)
    Highway 7B Highway 7B (Mary Hill Bypass). Construction work between Broadway St and Coast Meridian Rd (Port Coquitlam). Until Thu Jul 31. Lane Closure. Bus Stop Improvement project. Last updated Mon May 12 at 3:38 PM PDT. (DBC-76533)
    Highway 7B Both Directions Highway 7B (Mary Hill Bypass), in both directions. Construction work between Kingsway Ave and the end of Highway 7B (Mary Hill Bypass) for 0.8 km (Port Coquitlam). Until Fri Jun 13 at 2:00 PM PDT. From 9:00 AM to 2:00 PM PDT daily. Lane closures in both directions in effect. Bus stop improvement project. Last updated Wed May 7 at 11:38 AM PDT. (DBC-76317)
    Highway 9 Northbound Highway 9, northbound. Utility work planned between Morrow Rd and Park St for 0.3 km (Kent). Starting Wed Jun 4 at 9:00 AM PDT until Wed Jun 4 at 3:00 PM PDT. Right lane will be closed. Last updated Thu May 15 at 9:47 AM PDT. (DBC-76670)
    Highway 91 Both Directions Highway 91, in both directions. Bridge maintenance planned between Exit 15 and Exit 11: Westminster Hwy for 3.0 km (Richmond). Starting Tue May 20 at 11:00 PM PDT until Wed May 21 at 4:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Fri May 16 at 8:42 AM PDT. (DBC-76714)
    Highway 91 Both Directions Highway 91, in both directions. Bridge maintenance planned at Alex Fraser Bridge (Delta). Starting Sun May 18 at 6:30 AM PDT until Sun May 18 at 10:30 AM PDT. Watch for traffic control personnel. Last updated Wed May 14 at 7:32 AM PDT. (DBC-76557)
    Highway 99 Southbound Highway 99, southbound. Utility work between Exit 26 and 112 St for 4.9 km (Delta). Until Mon Jun 16. From 12:00 AM to 12:00 AM PDT daily. Right turn lane closed. Watch for traffic control. Expect delays. No closures on the long weekend. Last updated Wed May 14 at 4:13 PM PDT. (DBC-76647)
    Highway 99 Southbound Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066)
    Highway 99 Southbound Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330)
    Highway 99 Both Directions Highway 99, in both directions. Bridge maintenance planned between Garibaldi Hwy and Ocean Point Dr for 1.7 km (2 km north of West Vancouver to West Vancouver). Starting Mon May 19 until Wed May 21. From 7:30 AM to 5:30 PM PDT daily. Alternating lane closures. Watch for traffic control. Last updated Fri May 16 at 9:03 AM PDT. (DBC-76720)
    Highway 99 Southbound Highway 99, southbound. Bridge maintenance planned between Daisy Lake Rd and Alice Lake Rd (1 km north of Squamish). Starting Tue May 20 at 7:30 AM PDT until Tue May 20 at 5:30 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Fri May 16 at 8:59 AM PDT. (DBC-76719)
    Highway 99 Both Directions Highway 99, in both directions. Road sweeping planned between Centennial Way and Alpha Lake Rd for 46.9 km (Whistler to Squamish). Starting Sun May 18 until Fri May 23. From 7:30 AM to 5:30 PM PDT daily. Watch for slow moving vehicles. Last updated Fri May 16 at 9:06 AM PDT. (DBC-76721)
    Highway 99 Northbound Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439)
    Highway 99 Both Directions Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437)
    Highway 99 Both Directions Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529)
    Other Roads Both Directions 56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742)
    Other Roads Both Directions 264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747)
    Other Roads Westbound University Blvd, westbound. Geotechnical investigation between Blanca St and Wesbrook Mall 1 km north of Vancouver. Until Fri Jun 6. From 7:30 AM to 7:00 PM PDT daily. Left shoulder closed. Geotechnical investigation on median. Watch for traffic control. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75801)
    Other Roads Southbound Bradner Rd, southbound. Utility work between Downes Rd and Highway 1 in Abbotsford. Until Sat May 31. From 7:00 AM to 5:00 PM PDT daily. Work taking place underneath Highway 1 from Downes Rd to Downes Rd on Bradner. Last updated Fri Apr 25 at 1:23 PM PDT. (DBC-75811)
    Other Roads Both Directions Cypress Bowl Road, in both directions. Road maintenance work between Uplands Way and Cypress Place 1 km north of West Vancouver. Until Sat May 31. From 7:30 AM to 4:00 PM PDT on weekdays. Expect minor delays. Last updated Fri Apr 25 at 4:47 PM PDT. (DBC-75820)
    Other Roads Eastbound Bay St, eastbound. Utility work between Keith Rd and Highway 1 in West Vancouver. Until Mon May 19. Last updated Fri May 9 at 3:20 PM PDT. (DBC-76433)
    Other Roads Both Directions Main St, in both directions. Utility work planned between Mountain Highway and Phibbs Exchange 1 km north of North Vancouver - District. Starting Tue Jun 3 at 10:00 AM PDT until Tue Jun 3 at 2:00 PM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Last updated Fri May 9 at 4:51 PM PDT. (DBC-76440)
    Other Roads Both Directions Mt. Seymour Rd, in both directions. Special event planned between Mushroom Parking Lot and Mt. Seymour Parking Lot P1. Starting Wed May 21 at 7:00 PM PDT until Wed May 21 at 10:00 PM PDT. Filming work. Expect minor delays and watch for crews. Last updated Mon May 12 at 2:11 PM PDT. (DBC-76519)
    Other Roads Both Directions Harris Rd, in both directions. Construction work planned between Highway 7 and McMyn Rd in Pitt Meadows. Starting Mon May 19 until Fri May 23. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed. Right turn lane will be closed. Watch for traffic control personnel. Last updated Wed May 14 at 2:37 PM PDT. (DBC-76637)
    Other Roads Eastbound Chancellor Blvd, eastbound. Utility work between Western Pkwy and Acadia Rd in Vancouver. Until Fri May 23. Shoulder maintenance. Watch for traffic control. Last updated Wed May 14 at 3:03 PM PDT. (DBC-76640)
    Other Roads Eastbound Chancellor Blvd, eastbound. Utility work planned between Western Pkwy and Acadia Rd in Vancouver. Starting Tue May 20 until Mon Jun 16. From 7:00 AM to 5:00 PM PDT daily. Shoulder maintenance planned. Watch for traffic control personnel. Last updated Wed May 14 at 3:06 PM PDT. (DBC-76641)
    Other Roads Eastbound Moray Bridge, eastbound. Bridge maintenance planned at Sea Island Way in Richmond. Starting Tue May 20 at 6:00 AM PDT until Fri Jun 6 at 2:30 PM PDT. From 6:00 AM to 2:30 PM PDT on weekdays. Lane Closure. Watch for traffic control personnel. Last updated Fri May 16 at 8:47 AM PDT. (DBC-76715)