Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Broughton St and Bidwell St for 0.4 km (Vancouver). Starting Sat Mar 29 at 6:00 AM PDT until Sat Mar 29 at 7:00 PM PDT. Watch for traffic control personnel. Expect delays. Georgia St will be reduced to one lane in each direction from Bidwell St to Broughton St. Buses can access Pender St eastbound from Georgia St. Next update time Sat Mar 29 at 6:00 PM PDT. Last updated Mon Mar 24 at 1:01 PM PDT. (DBC-74355) |
Highway 99 Westbound |
Highway 99, westbound. Utility work between Cayoosh Park rd and Ainsworth rd 1 km south of Lillooet. Until Mon Apr 14. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Mar 27 at 9:42 AM PDT. (DBC-74536) |
Highway 99 Northbound |
Highway 99, northbound. Utility work between Exit 20 and 72 St for 4.1 km (Delta). Until Mon Mar 31. From 12:00 AM to 12:00 AM PDT daily. Lane Closure. The bus lane will be closed. Last updated Fri Feb 28 at 2:25 PM PDT. (DBC-73395) |
Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT daily. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Last updated Fri Mar 28 at 7:18 AM PDT. (DBC-74159) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Mon Mar 31 at 10:00 PM PDT until Thu Apr 3 at 5:00 AM PDT. Right lane of exit ramp will be closed. Last updated Mon Mar 24 at 7:37 PM PDT. (DBC-74381) |
Highway 99 Southbound |
Highway 99, southbound. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Fri Apr 4 at 10:00 PM PDT until Sat Apr 5 at 5:30 AM PDT. Right lane of exit ramp will be closed. Last updated Mon Mar 24 at 7:40 PM PDT. (DBC-74383) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between W Pender St and Lions Gate Bridge for 3.3 km (West Vancouver to Vancouver). Starting Sun Apr 27 at 7:00 AM PDT until Sun Apr 27 at 11:30 AM PDT. Expect delays due to congestion. Lane Closure. VancouverSunRun.Com for additional information. Last updated Mon Mar 17 at 10:21 AM PDT. (DBC-74046) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping between Exit 3: Horseshoe Bay Junction and Alpha Lake Rd for 94.3 km (West Vancouver to Whistler). Until Fri Mar 28 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT daily. Shoulder maintenance. Slow moving vehicle operations. Last updated Mon Mar 24 at 10:06 AM PDT. (DBC-74346) |
Highway 99 Both Directions |
Highway 99, in both directions. Tree pruning between Alice Lake Rd and Daisy Lake Rd for 0.5 km (8 to 9 km south of Whistler). Until Fri Mar 28 at 2:30 PM PDT. Lane closures in both directions in effect. Danger Tree work. Northbound right lane blocked, southbound fast lane blocked. Expect stoppages of up to 10 minutes. Last updated Fri Mar 28 at 9:38 AM PDT. (DBC-74543) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Lorimer Rd and Blackcomb Way for 1.3 km (Whistler). Starting Mon Apr 7 until Fri Apr 11. From 9:00 AM to 3:00 PM PDT daily. Last updated Fri Mar 14 at 5:37 PM PDT. (DBC-73993) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 |
Highway 99. Utility work between Davis Rd and E Lillooet Rd for 0.6 km (Lillooet). Until Mon Apr 7. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Mar 19 at 9:35 AM PDT. (DBC-74147) |
Highway 99 |
Highway 99. Tree pruning between Industrial Pl and Fountain Valley Rd for 14.1 km (Lillooet). Until Fri Mar 28. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Mon Mar 17 at 3:51 PM PDT. (DBC-74067) |
Highway 99 |
Highway 99. Utility work between Smith Rd and Marble Canyon Provincial Pk for 5.6 km (37 to 43 km north of Lillooet). Until Mon Mar 31. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Mon Mar 10 at 2:06 PM PDT. (DBC-73756) |