Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Thu Apr 17 at 3:00 PM PDT. Last updated Fri Mar 21 at 10:06 AM PDT. (DBC-73930) |
Barnston Island Ferry |
Barnston Island Ferry. Travel advisory planned between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Starting Sat Mar 29 until Fri Apr 4. Foot passenger only service times: Mar 29th 12:30pm-2:30pm, Mar 30th 12:30pm-4:00pm, Mar 31st 1pm-5:30pm, Apr 1st 1:00pm-6:00pm, Apr 2nd 2:00pm - 7:30pm, Apr 3rd 3:00pm-8:00pm, Apr 4th 3:30pm-9:00pm. Next update time Fri Apr 4 at 9:00 PM PDT. Last updated Thu Mar 27 at 2:50 PM PDT. (DBC-74560) |
Barnston Island Ferry |
Barnston Island Ferry. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Fri Mar 28 at 6:15 AM PDT. Ferry route closed. Next update time Fri Mar 28 at 6:15 AM PDT. Last updated Wed Mar 26 at 4:32 PM PDT. (DBC-74503) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Tue Apr 1. Schedule modification, early shutdown; Mar 28 at 10:00PM, Mar 29 at 10:00pm, Mar 30 at 10:00PM, Mar 31 at 11:00PM, Apr 1 at 11:00PM. Next update time Wed Apr 2 at 6:15 AM PDT. Last updated Thu Mar 27 at 2:22 PM PDT. (DBC-74557) |
Big Bar Reaction Ferry |
Big Bar Reaction Ferry. Travel advisory in effect at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Road closed for the season. The Aerial Car is in operation for foot traffic only. Next update time Fri May 30, 2025. Last updated Tue Nov 19 at 9:13 AM PST. (DBC-70341) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Boys Rd and Beverly St for 2.1 km (Duncan). Until Fri Mar 28 at 6:00 AM PDT. Next update time Fri Mar 28 at 6:00 AM PDT. Last updated Fri Mar 14 at 12:52 PM PDT. (DBC-73979) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Fri Mar 28 at 9:30 PM PDT until Sat Mar 29 at 7:00 AM PDT. Right turn lane will be closed. Centre lane will be closed. Next update time Sat Mar 29 at 7:00 AM PDT. Last updated Mon Mar 24 at 1:16 PM PDT. (DBC-74359) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Thu Apr 3 at 9:30 PM PDT until Fri Apr 4 at 7:00 AM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Next update time Fri Apr 4 at 7:00 AM PDT. Last updated Mon Mar 24 at 1:18 PM PDT. (DBC-74360) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Until Mon Mar 31 at 12:15 AM PDT. Lane Closure. Exit ramp is closed. Expect delays. Emergency work will have Hwy 1 reduced to one lane EB and one lane WB until further notice. Median crossover in effect. 5m lane width accommodated. EB exit 165 closed, use exit 168. Next update time Mon Mar 31. Last updated Thu Mar 27 at 3:08 PM PDT. (DBC-73987) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Gladwin Rd and Nicomen River Rd for 0.1 km (10 km east of Lytton). Until Mon Sep 15 at 10:00 AM PDT. From 7:00 AM to 5:30 PM PDT daily. Intermittent stoppages and single lane alternating traffic. Expect up to 40 minute delays. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Mar 25 at 6:01 PM PDT. (DBC-69330) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 60km/h limit through work zone. Intermittent delays of up to 5 minutes. Four stoppages of up to 20 minutes between 9 AM and 3 PM. Watch for traffic control. Next update time Tue Apr 1 at 5:00 PM PST. Last updated Thu Jan 23 at 10:11 AM PST. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Watch for traffic control. Road closed. Use alternate route Highway 97A and 97B. Single lane alternating Monday to Saturday nightly 8 PM - 6 AM. Next update time Sun Mar 30 at 12:00 PM PDT. Last updated Mon Mar 24 at 9:23 AM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Thu Apr 17. Mar 26-29 - 30 min delays 7AM-6PM. Mar 31 to Apr 17: 30 min delays from 12AM-5AM and 7AM-12AM. Traffic disruptions subject to weather. Next update time Thu Apr 17 at 9:00 AM PDT. Last updated Fri Mar 14 at 2:18 PM PDT. (DBC-73974) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closure planned at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Starting Mon Mar 31. Redgrave rest area will be permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Mar 31 at 10:00 AM MDT. Last updated Fri Mar 14 at 10:21 AM MDT. (DBC-73964) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Utility work planned at 92 Ave (Surrey). Starting Mon Apr 7 at 2:00 AM PDT until Fri Apr 11 at 5:00 AM PDT. From 2:00 AM to 5:00 AM PDT on weekdays. Next update time Fri Apr 11 at 5:00 AM PDT. Last updated Mon Mar 24 at 6:26 PM PDT. (DBC-74380) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341) |
Highway 37 Both Directions |
Highway 37, in both directions. Avalanche control activity is planned between Bell 2 Bridge and Bob Quinn Camp for 47.8 km (Bell II to Bob Quinn). Starting Fri Mar 28 at 11:00 AM PDT until Fri Mar 28 at 2:00 PM PDT. Road closure planned. Expect delays up to 40 minutes. Next update time Fri Mar 28 at 2:00 PM PDT. Last updated Thu Mar 27 at 1:40 PM PDT. (DBC-74549) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Broughton St and Bidwell St for 0.4 km (Vancouver). Starting Sat Mar 29 at 6:00 AM PDT until Sat Mar 29 at 7:00 PM PDT. Watch for traffic control personnel. Expect delays. Georgia St will be reduced to one lane in each direction from Bidwell St to Broughton St. Buses can access Pender St eastbound from Georgia St. Next update time Sat Mar 29 at 6:00 PM PDT. Last updated Mon Mar 24 at 1:01 PM PDT. (DBC-74355) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Mon Apr 14, 2025 at 9:00 AM PST. Last updated Mon Dec 9 at 5:50 PM PST. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Apr 23, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 1:06 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Thu Apr 17, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 2:46 PM PDT. (DBC-28386) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 10, 2025 at 9:00 AM PST. Last updated Tue Dec 10 at 9:04 AM PST. (DBC-53013) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Single Car per green light and 5-tonne load restriction in place until 10:00AM on Mar 30th, 2025. Full road closures will begin again on March 24th between 10am-2pm, 7 days per week. Single lane alternating traffic will be in place outside of these hours. Next update time Mon Mar 31 at 2:30 PM PDT. Last updated Thu Mar 27 at 9:39 AM PDT. (DBC-61149) |
Other Roads Both Directions |
Cave Road, in both directions. Landslide at Quesnel-Hixon Road. Road closed. Landslide on Cave Road. Next update time Tue Apr 1, 2025 at 10:00 AM PDT. Last updated Wed Oct 9 at 10:17 AM PDT. (DBC-67913) |
Other Roads |
Williams Lake Cut Off Rd. Flooding between Xats'Ull Heritage Site Way and Williams Lake Cut Off Rd. Road closed. Williams Lake Cut Off Rd is closed south of Xats'Ull Heritage Site Way and north of Springfield Ranch due to flooding. Next update time Fri Mar 28 at 2:30 PM PDT. Last updated Fri Mar 21 at 2:26 PM PDT. (DBC-73346) |