-
Lower Mainland / Highway 7 Both Directions
-
Highway 7 (Lougheed Highway), in both directions. Construction work between Wahleach Rd and Johnson Slough Rest Area (Kent). Until Sat Nov 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Reduced speed zone. Watch for traffic control personnel. Last updated Thu Aug 8 at 5:01 PM PDT. (DBC-67009)
- Nearby Highway Webcams
- Nearby Weather Station Reports
-
Forecast Tonight Tue Agassiz 9 12 Hope 7 12 Hope Slide 3 9 Chilliwack 9 12 Coquihalla Highway - Hope to Merritt - - Abbotsford 9 12 Source: Environment Canada