-
Lower Mainland / Highway 99A Both Directions
-
Highway 99A (King George Blvd), in both directions. Paving operations between Crescent Rd and 40 Ave for 0.8 km (Surrey). Until Fri May 17. From 7:00 AM to 5:00 PM PDT daily. Roadway is reduced to a single lane in each direction. Shoulder is closed. Watch for traffic control personnel. Last updated Mon Apr 22 at 2:59 PM PDT. (DBC-63034)
- Nearby Highway Webcams
- Nearby Weather Station Reports
-
Forecast Today Tonight White Rock 20 10 Pitt Meadows 20 10 Vancouver 20 10 Gulf Islands (Southern) 16 10 Abbotsford 21 10 Gibsons 18 9 Source: Environment Canada