Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Lane closures in both directions. Construction speed zone in effect. Southbound bridge closed for repairs. All Traffic diverted onto the adjacent bridge. No overwidth protocols in effect up to 4.4m. Next update time Mon Jan 20, 2025 at 7:00 AM PST. Last updated Fri Nov 29 at 9:22 PM PST. (DBC-70685) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Tue Jul 1, 2025. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Sat May 10, 2025 at 12:00 PM PDT. Last updated Thu Sep 26 at 12:08 PM PDT. (DBC-54341) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. From 10:00 AM to 2:00 PM PST daily. Watch for traffic control. Expect delays. Road closed. 5 ton load restriction and 1 car at a time. Single lane alternating traffic until March 2025. Next update time Mon Mar 3, 2025 at 12:00 PM PST. Last updated Fri Dec 20 at 12:12 PM PST. (DBC-61149) |
Other Roads Both Directions |
Cowichan Bay Road , in both directions. Flooding between Zouhalem Road and Highway 1 near Duncan. Road closed. Detour in effect. Detour Bench Road. Next update time Mon Dec 23 at 12:00 PM PST. Last updated Fri Dec 20 at 12:21 PM PST. (DBC-71241) |
Highway 1 |
Highway 1 (TransCanada Highway). Limited visibility with fog between Tolmie Lane and Exit 10: Burnside Rd W for 6.7 km (1 km south of Saanich to View Royal). Last updated Sat Dec 21 at 6:32 AM PST. (DBCRCON-205390) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 Both Directions |
[Truncated] Highway 1 (TransCanada Highway), in both directions. Utility work planned between Sprott Rd and Mays Rd for 0.9 km (4 to 3 km north of Duncan). Starting Mon Jan 20, 2025 at 8:00 PM PST until Tue Jan 21, 2025 at 6:00 AM PST. Centre lane will be closed in both directions. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - Cable work - Right and Left Turn lanes closed at Mays Rd. Watch for speed reduction and work crews |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Davis Rd and Platt Rd for 1.0 km (Ladysmith to 1 km south of Ladysmith). Starting Thu Jan 23, 2025 at 10:00 AM PST until Thu Jan 23, 2025 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - BC Hydro - Westdowne rd exit closed - alternate access at Thicke Rd (800m away) watch for work crews. Last updated Mon Dec 16 at 1:59 PM PST. (DBC-71188) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work planned between Finlayson St and Nicol St for 0.3 km (Nanaimo). Starting Mon Dec 30 at 9:00 AM PST until Fri Jan 24, 2025 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Thu Dec 5 at 11:24 AM PST. (DBC-70846) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Westbound |
Highway 14, westbound. Utility work between Maple Ave S and Croce Rd for 1.4 km (Sooke). Until Tue Dec 31 at 6:00 AM PST. From 7:00 PM to 6:00 AM PST daily. Right turn lane closed. Shoulder maintenance. Single lane alternating traffic. Last updated Fri Nov 22 at 12:02 PM PST. (DBC-67026) |
Highway 14 Both Directions |
Highway 14, in both directions. Maintenance between Dover St and Impala Rd for 10.1 km (Metchosin to Sooke). Until Thu Jan 30, 2025 at 2:00 PM PST. Right lane closed. Single lane alternating traffic. Expect delays. Watch for traffic control. Tree maintenance around power lines at multiple locations. Watch for speed a limit reduction. Last updated Wed Dec 18 at 4:28 AM PST. (DBC-71214) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work planned between Parkland Rd and Awsworth Rd for 13.4 km (Langford to Sooke). Starting Thu Jan 2, 2025 at 10:00 PM PST until Fri Jan 3, 2025 at 6:00 AM PST. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility Work - Arial cable placement - 3 locations of single lane alternating traffic. Watch for speed reductions and work crews. Last updated Mon Dec 16 at 1:21 PM PST. (DBC-71187) |
Highway 19 |
Highway 19 (Island Highway). Strong crosswinds between Port Hardy Ferry and Eve River Rest Area for 139.9 km (Port Hardy to 35 km south of Woss). Last updated Sat Dec 21 at 6:50 AM PST. (DBCRCON-205004) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work between Fort Rupert Rd and E Main Rd for 30.3 km (Port Hardy to 6 km south of Port McNeill). Until Fri Jan 31, 2025 at 3:00 PM PST. Single lane alternating traffic. Tree pruning. Last updated Mon Dec 2 at 10:49 AM PST. (DBC-70739) |
Highway 19 |
Highway 19 (Island Highway). Limited visibility dense fog between Sayward Rd and Hamm Rd for 90.0 km (Campbell River). Limited visibility with fog. Last updated Sat Dec 21 at 4:32 AM PST. (DBCRCON-205173) |
Highway 19 |
Highway 19 (Inland Island Highway). Fog patches between Duncan Bay Main and Cook Creek Rd for 56.7 km (12 km south of Campbell River to 28 km south of Cumberland). Last updated Sat Dec 21 at 7:11 AM PST. (DBCRCON-205473) |
Highway 19 |
Highway 19 (Inland Island Highway). Fog patches between Cook Creek Rd and Parksville Exit (Highway 19A) for 40.1 km (29 km south of Cumberland to Parksville). Last updated Sat Dec 21 at 4:46 AM PST. (DBCRCON-205162) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Maintenance between Parksville Exit (Highway 19A) and Church Rd for 5.4 km (Parksville). Until Fri Dec 27 at 3:00 PM PST. Right lane closed. Shoulder closed. Expect minor delays. Watch for traffic control. Vegetation removal around hydro lines. Last updated Sun Dec 15 at 3:25 AM PST. (DBC-71082) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Electrical maintenance planned at Norwell Dr (Nanaimo). Starting Thu Jan 2, 2025 at 8:30 AM PST until Thu Jan 2, 2025 at 2:30 PM PST. Right lane will be closed. Watch for traffic control personnel. Speed reduction will be in place. Last updated Mon Dec 16 at 8:41 AM PST. (DBC-71173) |
Highway 19A |
Highway 19A (Island Highway). Fog patches between Exit 46 and Cook Creek Rd for 43.8 km (Parksville to 12 km south of Buckley Bay Ferry Terminal). Last updated Sat Dec 21 at 4:46 AM PST. (DBCRCON-205097) |
Highway 19A |
Highway 19A (Island Highway). Limited visibility dense fog between Catherwood Rd and the end of Highway 19A (Island Highway) for 23.7 km (Campbell River). Limited visibility with fog. Last updated Sat Dec 21 at 4:32 AM PST. (DBCRCON-205174) |
Highway 28 |
Highway 28. Limited visibility dense fog between Gold River Hwy and the end of Highway 28 for 47.4 km (Campbell River). Limited visibility with fog. Last updated Sat Dec 21 at 4:32 AM PST. (DBCRCON-205108) |
Highway 30 |
Highway 30. Strong crosswinds between the start of Highway 30 and the end of Highway 30 for 35.9 km (Port Alice). Last updated Sat Dec 21 at 6:50 AM PST. (DBCRCON-205005) |
Highway 30 Both Directions |
Highway 30, in both directions. Utility work between South Hardy Mainline and Beaver Lake Forest Trail for 1.2 km (28 to 27 km north of Port Alice). Until Fri Jan 31, 2025 at 4:00 PM PST. Single lane alternating traffic. Last updated Wed Dec 4 at 12:04 PM PST. (DBC-70821) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Wed Jan 1, 2025 at 10:00 AM PDT. Last updated Mon Oct 28 at 9:48 AM PDT. (DBC-52953) |
Highway 4A |
Highway 4A. Fog patches between the start of Highway 4A and the end of Highway 4A for 11.6 km (Parksville). Last updated Sat Dec 21 at 4:46 AM PST. (DBCRCON-205098) |
Mount Washington Rd |
Mount Washington Rd. Fog patches between Alpine Rd and Dove Creek Rd for 17.7 km (Mount Washington Ski Resort). Last updated Sat Dec 21 at 7:11 AM PST. (DBCRCON-205474) |
Other Roads Both Directions |
Tzouhalem Road, in both directions. Road construction work between Cowichan Bay Road and Samuel Road. Until Mon Mar 24, 2025 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Shoulder closed. Last updated Mon Jun 17 at 7:52 AM PDT. (DBC-65244) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:30 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. Next update time Tue Mar 25, 2025 at 12:00 PM PDT. Last updated Fri Oct 11 at 3:04 PM PDT. (DBC-68621) |
Other Roads Both Directions |
Cedar Road, in both directions. Electrical maintenance planned at Cedar Road in Nanaimo. Starting Wed Jan 8, 2025 at 8:30 AM PST until Wed Jan 8, 2025 at 2:30 PM PST. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Dec 19 at 1:49 PM PST. (DBC-71174) |
Other Roads Both Directions |
Youbou Rd., in both directions. Utility work planned between Beaver Rd and N. Shore Rd. Starting Mon Jan 6, 2025 at 8:00 AM PST until Fri Jan 10, 2025 at 5:00 PM PST. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - BC Hydro maintenance. Watch for work crews and Traffic Control Personnel. Last updated Mon Dec 16 at 11:54 AM PST. (DBC-71183) |
Other Roads Eastbound |
Youbou rd, eastbound. Utility work planned between Winter Dr. And Beaver Rd. Starting Mon Dec 30 at 9:30 AM PST until Mon Dec 30 at 3:30 PM PST. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - BC Hydro pole replacement. Single Lane Alternating Traffic. Watch for work crews and traffic control personnel. Last updated Mon Dec 16 at 2:15 PM PST. (DBC-71189) |
Other Roads Both Directions |
Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Hwy 1, Hwy 17, Ravine Way and Carey Rd both directions. Traffic Pattern change on Ravine Way starting Jan 10. Work on shoulder. Construction zone in effect 24/7. Last updated Fri Dec 20 at 12:43 PM PST. (DBC-71339) |