Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of up to 15 minutes. Project completion: Nov 30, 2024. Next update time Wed May 1 at 6:30 AM PDT. Last updated Wed Mar 20 at 7:48 AM PDT. (DBC-56391) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work between Cherry Rd and Deer Dr for 2.7 km (14 to 11 km west of Kamloops). Until Thu Mar 28. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Expect minor delays. Last updated Wed Mar 27 at 6:56 PM PDT. (DBC-61697) |
Highway 5 Both Directions |
Highway 5, in both directions. Roadside brushing between McLure Ferry Rd and Little Fort Rest Area Rd for 49.7 km (15 km south of Barriere to Little Fort). Until Thu Mar 28. From 7:00 AM to 7:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Single lane alternating traffic. Watch for Road Crew. Last updated Wed Mar 27 at 6:56 PM PDT. (DBC-61969) |
Highway 5A |
Highway 5A. Watch for falling rocks between the start of Highway 5A and Gulliford Lake Rest Area for 37.5 km (2 km south of Gulliford Lake Rest Area to Princeton). Last updated Thu Mar 28 at 3:17 AM PDT. (DBC-58676) |
Highway 5A Southbound |
Highway 5A, southbound. Road sweeping between Rose Hill Rd and Beresford Rd for 3.4 km (4 km south of Kamloops to Kamloops). Watch for slow moving vehicle. Last updated Wed Mar 27 at 6:55 PM PDT. (DBC-61788) |
Highway 8 Both Directions |
Highway 8, in both directions. Utility work between Porcupine Ridge Rd and Aberdeen Rd for 39.0 km (7 km west of Merritt to 14 km east of Spences Bridge). Until Sat Jun 1, 2024. From 7:00 AM to 5:00 PM PDT on Friday and Saturday. Single lane alternating traffic. Last updated Thu Jun 29 at 2:25 PM PDT. (DBC-53957) |
Highway 97C |
Highway 97C (Okanagan Connector). Watch for slippery sections between Pennask Summit and Eight Mile Rd for 72.9 km (Pennask Summit to Merritt). Compact snow. Last updated Thu Mar 28 at 6:47 AM PDT. (DBCRCON-185548) |
Highway 97C |
Highway 97C. Watch for slippery sections between Merritt and Highland Valley Copper Mine for 56.0 km (96 to 40 km south of Ashcroft). Compact snow. Last updated Thu Mar 28 at 6:47 AM PDT. (DBCRCON-185518) |
Highway 97D |
Highway 97D. Watch for slippery sections between the start of Highway 97D and Highway 5; Meadow Creek Rd for 24.1 km (Logan Lake). Compact snow. Last updated Thu Mar 28 at 6:47 AM PDT. (DBCRCON-185519) |
Other Roads Both Directions |
Halston Avenue Connector, in both directions. Bridge construction between Kingston Avenue and Salish Road in Kamloops. Until Wed Jul 10. Lane closures in both directions in effect. Watch for traffic control. Possible delays. Last updated Wed Mar 27 at 6:55 PM PDT. (DBC-61191) |
Other Roads Both Directions |
Barnhartvale Road, in both directions. Tree pruning between Buse Lake and Highway 97 near Kamloops. Until Fri Mar 29 at 5:00 PM PDT. Single lane alternating traffic. Last updated Wed Mar 27 at 6:55 PM PDT. (DBC-61270) |
Other Roads Both Directions |
Oriole Rd, in both directions. The traffic signal is out at Trans Canada Highway. Traffic lights are flashing red. Please proceed with caution. Last updated Thu Mar 28 at 6:05 AM PDT. (DBC-62120) |