Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Thu Apr 17. March 31 to April 17: 30 min delays from 12AM-5AM and 7AM-12AM. Single lane alternating traffic / traffic disruptions subject to weather. Next update time Thu Apr 17 at 9:00 AM PDT. Last updated Mon Mar 31 at 12:44 PM PDT. (DBC-73974) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area will be permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Fri Apr 4 at 10:00 AM MDT. Last updated Tue Apr 1 at 10:04 AM MDT. (DBC-73964) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Road maintenance work planned between Griffin Lake Avalanche Gate and Crazy Ck. Bridge for 9.6 km (24 km west of Revelstoke to 30 km east of Sicamous). Starting Fri Apr 11 at 9:00 AM PDT until Fri Apr 11 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Speed reduction to 70 km/hr. Watch for traffic control. Last updated Mon Mar 31 at 4:23 PM PDT. (DBC-74701) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization planned between Griffin Lake Avalanche Gate and Three Valley Siding Rd (21 km west of Revelstoke). Starting Mon Apr 7 until Sun May 18. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. There will be delays up to 20 minutes. Last updated Tue Apr 1 at 12:16 PM PDT. (DBC-74730) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Three Valley Avalanche Gate and Summit Lake OH Bridge for 7.9 km (18 to 10 km west of Revelstoke). Starting Wed Apr 9 at 7:00 AM PDT until Wed Apr 9 at 5:00 PM PDT. Westbound lane will be closed. Single lane alternating traffic will be in effect. Speed limit reduced to 70km/h. Last updated Thu Mar 27 at 10:16 AM PDT. (DBC-74544) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance planned between Highway 23 South and Big Eddy Rd for 1.8 km (Revelstoke). Starting Tue Apr 8 at 7:00 AM PDT until Tue Apr 8 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Environmental clean up from previous incident. Last updated Thu Mar 27 at 10:47 AM PDT. (DBC-74545) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between Quartz Creek Bridge (Structure) and Redgrave Rest Area for 0.4 km (14 km east of East Boundary of Glacier National Park). Until Tue Apr 15. From 6:00 AM to 6:00 PM MDT on weekdays. Road maintenance work. 10-15 minute delays expected. Last updated Mon Mar 17 at 10:52 AM MDT. (DBC-74044) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road sweeping between Anderson Rd and Golden Donald Upper Rd for 3.7 km (Golden). Until Thu Apr 3 at 3:30 PM MDT. Slow moving vehicles. Last updated Tue Apr 1 at 7:29 PM MDT. (DBC-74756) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Wed Apr 2 at 7:09 PM MDT. (DBC-44269) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road sweeping between Jim Smith Lake Rd and 30th Ave N for 5.7 km (Cranbrook). Until Mon May 5. From 8:00 AM to 3:30 PM MDT daily. Lane closures in both directions in effect. Intermittent closures will take place as crews work. One lane in both directions will be maintained. Last updated Fri Mar 7 at 2:59 PM MDT. (DBC-73673) |
Highway 93 Both Directions |
Highway 93, in both directions. Road sweeping between Farstad Way and Fairmont Resort Rd for 53.9 km (1 km south of Skookumchuck to Fairmont Hot Springs). Until Wed Apr 2 at 8:00 PM MDT. Watch for traffic control. Watch for slow moving vehicle. Last updated Wed Apr 2 at 7:14 AM MDT. (DBC-74766) |
Highway 93 |
Highway 93. Bridge maintenance between Highwood Frtg and Grainger Rd for 0.4 km (Canal Flats). Until Thu Apr 3 at 4:30 PM MDT. From 8:00 AM to 4:30 PM MDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Last updated Mon Mar 31 at 2:43 PM MDT. (DBC-74692) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Speed reduced to 50km/h. Single lane alternating traffic April 2nd & 3rd, 9am-3pm. Last updated Wed Apr 2 at 1:50 PM MDT. (DBC-73931) |
Highway 95 Both Directions |
Highway 95, in both directions. Road sweeping between Radium Valley Rd and Reflection Lake Rd for 100.3 km (Golden to Radium Hot Springs). Until Thu Apr 10. From 8:00 AM to 3:00 PM MDT on Monday, Tuesday, Wednesday and Thursday. Road sweeping in progress, reduce speed, crews and equipment working. Last updated Wed Apr 2 at 7:15 AM MDT. (DBC-74767) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712) |