Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization planned between Anderson River Mainline and Thomas Rd (26 to 27 km north of Yale). Starting Mon Apr 22 until Sat May 11. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control personnel. Expect delays. Next update time Sat May 11 at 5:00 PM PDT. Last updated Wed Apr 17 at 3:13 PM PDT. (DBC-62837) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work between 136 St and 152 St for 2.2 km (Surrey). Until Tue Apr 30. From 8:00 PM to 5:00 AM PDT and from 9:00 AM to 3:00 PM PDT daily. Left turn lane closed. Right turn lane closed. Right lane closed. Watch for traffic control. Expect delays. Next update time Tue Apr 30 at 8:00 AM PDT. Last updated Thu Apr 4 at 12:25 PM PDT. (DBC-62314) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work at 112 St (Delta). Until Sun Apr 21 at 5:00 PM PDT. Expect delays. Lane closures in both directions in effect. Consider alternate route. Next update time Sun Apr 21 at 5:00 PM PDT. Last updated Fri Apr 19 at 10:52 AM PDT. (DBC-62922) |
Other Roads Westbound |
Old Hope Princeton Hwy, westbound. Utility work between 6th Ave and 7th Ave in Hope. Until Tue May 21. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Expect delays. Next update time Tue May 21 at 4:00 PM PDT. Last updated Fri Apr 5 at 10:27 AM PDT. (DBC-62023) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Apr 5 at 6:10 AM PDT. (DBC-60503) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Bridge maintenance planned at Port Mann Bridge (Surrey). Starting Sun Apr 21 at 9:00 PM PDT until Tue Apr 23 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on Sunday, Monday and Tuesday. Right lane will be closed. Watch for traffic control personnel. Please drive to conditions and obey traffic control equipment and signs. Last updated Fri Apr 19 at 2:41 PM PDT. (DBC-62871) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 248 St and Exit 83: Mt Lehman Rd for 13.3 km (Langley - District to Abbotsford). Until Tue Apr 30 at 5:30 AM PDT. Left lane is closed in both directions. Left lane closures in both directions for barrier placement, soil removal and median works. Last updated Tue Mar 26 at 3:46 PM PDT. (DBC-62079) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work between Bradner Rd and Peardonville Rd for 4.0 km (Abbotsford). Until Tue Apr 30. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is blocked. Watch for traffic control. Expect delays. Last updated Fri Mar 22 at 10:01 AM PDT. (DBC-61943) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 95: Whatcom Rd and Exit 116: Lickman Rd for 20.5 km (Abbotsford to Chilliwack). Until Tue Apr 30. From 8:00 PM to 5:30 AM PDT on weekdays. Lane Closure. Expect minor delays. Next update time Tue Apr 30 at 5:30 AM PDT. Last updated Thu Apr 18 at 4:53 PM PDT. (DBC-62880) |
Highway 1 |
Highway 1 (TransCanada Highway). Road sweeping between Exit 171: Old Hope-Princeton Highway and Haig Station Rd for 2.2 km (Hope). Watch for traffic control. Last updated Mon Apr 15 at 7:31 AM PDT. (DBC-62682) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance at Ainslie Rd N (15 km south of Jackass Mountain Summit). Until Sat Apr 20 at 3:00 PM PDT. Single lane alternating traffic. Bridge washing through the canyon. Starting at Ainslie creek bridge and continuing south to sawmill creek bridge. Single lane alternating traffic at each bridge location. Last updated Fri Apr 19 at 3:24 PM PDT. (DBC-62935) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance between Ainslie Rd N and Kahmoose Rd (15 km south of Jackass Mountain Summit). Single lane alternating traffic. Last updated Mon Apr 15 at 8:11 AM PDT. (DBC-62683) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction between Blue Lake Rd and Jackass Summit (2 km south of Jackass Mountain Summit). 2 way traffic reinstated. Speed reduced to 30km/hr. Please obey construction speed zone. Prepare for changing conditions and watch for maintenance crews. Expected delays of 5 to 10 mins. Loads over 3.8m width restricted. Next update time Sun Apr 21 at 5:00 PM PDT. Last updated Thu Apr 18 at 4:59 PM PDT. (DBC-35355) |
Highway 10 Eastbound |
Highway 10, eastbound. Utility work between 172 St and 176A St for 0.5 km (Surrey). Until Thu Apr 25. From 10:00 PM to 5:00 AM PDT daily. Left lane is blocked. Centre lane blocked. Last updated Wed Apr 17 at 9:20 AM PDT. (DBC-62812) |
Highway 10 Westbound |
Highway 10, westbound. Utility work between 176A St and 176 St for 0.1 km (Surrey). Until Fri May 3 at 3:00 PM PDT. Centre lane blocked. Right turn lane closed. Work is to remove blockage from storm service on the north west corner of Hwy 10 and 176 St. Last updated Tue Apr 16 at 3:32 PM PDT. (DBC-62784) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Westley Rd and Davis Bay Rd (Sechelt). Starting Mon Jun 24 until Fri Jun 28. From 8:00 AM to 4:30 PM PDT on weekdays. Watch for traffic control personnel. Last updated Tue Apr 16 at 12:03 PM PDT. (DBC-62773) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Maintenance planned between 62 Ave and 60 Ave for 0.5 km (Surrey). Starting Mon Apr 22 at 11:00 AM PDT until Fri May 10 at 2:00 PM PDT. From 11:00 AM to 2:00 PM PDT on weekdays. Lane Closure. Watch for traffic control personnel. Last updated Wed Apr 17 at 12:10 PM PDT. (DBC-62825) |
Highway 17 Both Directions |
Highway 17, in both directions. Bridge maintenance planned at 28 Ave Overpass (Delta). Starting Sun Apr 21 at 9:00 PM PDT until Mon Apr 22 at 2:00 AM PDT. Lane Closure. Watch for traffic control personnel. Bridge washing Highway 17 Eastbound and Westbound at Deltaport Way Overpass. Last updated Fri Apr 19 at 4:07 PM PDT. (DBC-62937) |
Highway 17 Northbound |
Highway 17, northbound. Road maintenance work planned at Exit 13 (Delta). Starting Sun Apr 21 at 9:00 AM PDT until Sun Apr 21 at 2:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Fri Apr 19 at 4:12 PM PDT. (DBC-62939) |
Highway 17 Westbound |
Highway 17, westbound. Road construction work planned between Grace Rd and Highway 91 Connector for 1.7 km (Surrey to Delta). Starting Mon Apr 29 at 9:00 AM PDT until Fri May 3 at 3:00 PM PDT. Right lane will be blocked. Watch for traffic control personnel. Last updated Wed Apr 17 at 5:50 PM PDT. (DBC-62849) |
Highway 17 |
Highway 17. Utility work planned between Highway 91 Connector and Grace Rd (1 km east of Delta). Starting Tue Apr 30 at 9:00 AM PDT until Wed May 1 at 5:00 PM PDT. Right turn lane will be closed. Shoulder will be closed. Manhole work at Elevator Road. Last updated Thu Apr 18 at 3:42 PM PDT. (DBC-62886) |
Highway 17 Both Directions |
Highway 17, in both directions. Maintenance between Old Yale Rd and 136 St for 2.5 km (Surrey). Until Mon Apr 29 at 7:00 AM PST. Placing construction signs and message boards to inform traffic of nightly lane closure setups. Intermittent rolling closures required. Some weekend daytime closures required. Last updated Mon Feb 19 at 8:31 AM PST. (DBC-59667) |
Highway 17 Westbound |
Highway 17, westbound. Maintenance between 104 Ave and 136 St for 6.2 km (Surrey). Until Fri Apr 26 at 5:00 PM PDT. Shoulder closed. Pile driving off the highway. Shoulder is closed as a buffer from 104th Ave to the Port Mann Bridge. Last updated Tue Apr 16 at 11:18 AM PDT. (DBC-62109) |
Highway 3 |
Highway 3 (Crowsnest Highway). Bridge maintenance between the start of Highway 3 (Crowsnest Highway) and Exit 177 for 6.6 km (Hope). Lane Closure. Last updated Thu Apr 11 at 7:19 AM PDT. (DBC-62567) |
Highway 3 |
Highway 3 (Crowsnest Highway). Bridge maintenance between Exit 173: Old Hope Princeton Way and Exit 177 for 3.6 km (Hope). Right lane closed. Last updated Wed Apr 10 at 7:49 AM PDT. (DBC-62516) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work at Exit 177 (3 km east of Hope). Until Fri May 3. From 8:00 AM to 4:00 PM PDT on weekdays. Expect minor delays. Lane Closure. Shoulder closed. For BC Hydro work from Exit 177 / Highway 5 split to Mount Hope FSR. Speed reduced to 60 km/h. Please use caution and watch for crew on shoulder. Last updated Fri Apr 19 at 8:17 AM PDT. (DBC-62907) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work between Second Avalanche Gate and Allison Pass Summit for 16.3 km (50 to 34 km east of Hope). Until Fri Apr 26 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Next update time Fri Apr 26 at 4:00 PM PDT. Last updated Wed Apr 10 at 9:59 AM PDT. (DBC-62348) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). Until Sat Apr 27. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Lane Closure. Expect delays. For street widening; expect delays on River Road with Single Lane Alternating Traffic as required. Last updated Mon Apr 8 at 7:36 AM PDT. (DBC-62407) |
Highway 7 |
Highway 7 (Lougheed Highway). Construction work between S River Rd and McIntyre Rd (3 km east of Mission). Until Sat Apr 20 at 3:00 PM PDT. Work is from 1 km east of Dewdney Bridge to 1 km west of the bridge. Ground improvement parallel to the highway. Last updated Thu Apr 11 at 2:38 PM PDT. (DBC-62586) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Road construction work between McIntyre Rd and S River Rd for 0.2 km (3 km east of Mission). Until Sat Apr 20. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Expect delays. For ground improvement parallel to the highway for 1km either side of the Dewdney Bridge. Last updated Fri Apr 5 at 8:19 AM PDT. (DBC-62335) |
Highway 91 Southbound |
Highway 91, southbound. Paving operations planned between Boundary Rd and Annacis Channel Bridge for 0.2 km (New Westminster to Richmond). Starting Sun Apr 21 at 9:00 PM PDT until Mon Apr 22 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Hwy 91A on ramp to to Hwy 91 westbound closed, detour via Cliveden to Hwy 91 westbound. Last updated Fri Apr 19 at 8:40 AM PDT. (DBC-62909) |
Highway 91A Eastbound |
Highway 91A, eastbound. Paving operations planned between Howes St and Queensborough Bridge for 1.2 km (New Westminster). Starting Mon Apr 22 at 9:00 PM PDT until Tue Apr 23 at 5:00 AM PDT. Lane Closure. Watch for traffic control personnel. Howes On-Ramp to NB Hwy 91A will be closed to traffic. Detoured SB on Hwy 91A to Cliveden where they will have access to Hwy 91A NB. Last updated Fri Apr 19 at 11:51 AM PDT. (DBC-62911) |
Highway 99 Both Directions |
Highway 99, in both directions. Maintenance planned at Massey Tunnel (Richmond). Starting Sat Apr 20 at 9:00 PM PDT until Sun Apr 21 at 5:00 AM PDT. From north end of Massey Tunnel to the south end. Rail inspection on Deas Island train track. Inspection will take approximately 15 mins. Or less in each lane. Last updated Wed Apr 17 at 2:43 PM PDT. (DBC-62842) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned at Lions Bay Ave (Lions Bay). Starting Mon Apr 22 until Fri Apr 26. From 9:00 AM to 3:00 PM PDT on weekdays. Lane Closure. Expect delays. Shoulder will be closed. For Telus pole maintenance from Oceanview Rd to Crystal Falls Rd. Last updated Mon Apr 15 at 1:43 PM PDT. (DBC-62714) |
Highway 99 Southbound |
Highway 99, southbound. Construction work planned at Copper Dr (2 km south of Squamish). Starting Mon Apr 22 until Wed Apr 24. From 7:00 AM to 5:00 PM PDT on Monday, Tuesday and Wednesday. Right lane will be blocked. Next update time Wed Apr 24 at 5:00 PM PDT. Last updated Wed Apr 17 at 12:41 PM PDT. (DBC-62826) |
Highway 99 Northbound |
Highway 99, northbound. Utility work between Scott Cres and Cleveland Ave (Squamish). Until Mon Jun 3. Right turn lane closed. Shoulder closed. Watch for traffic control. Next update time Mon Jun 3 at 9:00 AM PDT. Last updated Wed Mar 6 at 12:51 PM PDT. (DBC-61357) |
Highway 99 Southbound |
Highway 99, southbound. Tree pruning planned between Depot Rd and Garibaldi Way (Squamish). Starting Mon Apr 22 at 7:00 AM PDT until Mon Apr 22 at 4:00 PM PDT. Right lane will be blocked. Last updated Fri Apr 19 at 1:52 PM PDT. (DBC-62929) |
Highway 99 Southbound |
Highway 99, southbound. Roadside brushing between Daisy Lake Rd and Alice Lake Rd (Squamish). Until Fri Apr 26. From 7:30 AM to 4:00 PM PDT on weekdays. Watch for traffic control. Northbound traffic will be shifted to the Southbound left lane. Last updated Fri Apr 19 at 1:21 PM PDT. (DBC-62630) |
Highway 99 Both Directions |
Highway 99, in both directions. Mowing between Exit 3: Horseshoe Bay Junction and Alpha Lake Rd for 94.3 km (Whistler to West Vancouver). Starting Mon Apr 22 until Fri Apr 26. From 8:00 AM to 3:30 PM PDT on weekdays. Road sweeping planned. Watch for slow moving vehicle. Last updated Fri Apr 19 at 12:47 PM PDT. (DBC-62927) |
Other Roads Both Directions |
Phibbs Exchange, in both directions. Construction work at the vicinity of Phibbs Exchange until Spring 2024. Expect sidewalk closures and detours throughout the duration of the project. There will be two stoppages of up to 5 minutes on the EB on-ramp from Dollarton Hwy between 9AM & 1PM April 8. Last updated Thu Apr 4 at 9:42 AM PDT. (DBC-46374) |
Other Roads Eastbound |
W 16th Avenue, eastbound. Utility work between Westbrook Mall and Binning Road 1 km north of Ucluelet. Until Sat Jun 15. From 7:00 AM to 5:00 PM PDT on weekdays. Right lane closed. Installation of new watermain, fire hydrants chambers and road paving. Last updated Thu Mar 7 at 2:12 PM PDT. (DBC-61404) |
Other Roads Both Directions |
Cross Creek Rd, in both directions. Utility work between Queens Ave and Tyrol Rd. Until Fri May 10. From 7:00 AM to 5:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Mar 28 at 5:32 PM PDT. (DBC-62152) |
Other Roads Eastbound |
Cypress Bowl Road, eastbound. Construction work planned between power lines and Chippendale Road. Starting Wed May 8 at 7:00 AM PDT until Wed May 8 at 5:00 PM PDT. Right lane will be blocked. Last updated Thu Mar 28 at 5:56 PM PDT. (DBC-62153) |
Other Roads Both Directions |
Rockwell Dr, in both directions. Road construction work at 6.3km north of Harrison Hot Springs. Until Fri Sep 13. Single lane alternating traffic. 24/7. Last updated Mon Apr 15 at 10:18 AM PDT. (DBC-62705) |
Other Roads Westbound |
Copper Drive, westbound. Shoulder maintenance planned between Main Street and Creekside Drive. Starting Mon Apr 29 until Wed May 29. From 7:00 AM to 7:00 PM PDT daily. Shoulder will be closed. Watch for traffic control personnel. Last updated Mon Apr 15 at 2:37 PM PDT. (DBC-62717) |