Highway 3 |
Highway 3. Road sweeping between Exit 177 and Sunshine Valley for 11.9 km (6 to 17 km east of Hope). From 7:00 AM to 4:00 PM PDT on Monday and Tuesday. Expect delays. Last updated Mon Jun 6 at 7:03 AM PDT. (DBC-41881) |
Highway 3 Both Directions |
Highway 3, in both directions. Paving operations between First Avalanche Gate and Sunshine Valley (14 km east of Hope). Until Thu Jun 30. From 7:00 AM to 8:00 PM PDT on weekdays and Saturday. Watch for traffic control. Lane Closure. Expect delays of up to 20 minutes. Last updated Fri May 6 at 6:36 PM PDT. (DBC-40748) |
Highway 3 Both Directions |
Highway 3, in both directions. Utility work planned between Sunshine Valley and Tower Rd for 63.1 km (17 km east of Hope to 47 km west of Princeton). Starting Mon Jun 27 at 8:00 AM PDT until Fri Jul 22 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Hazard tree removal. Watch for and obey traffic control personnel. There will be no work after 12 Noon before a long weekend, or on the Monday following one. Last updated Fri Jun 24 at 3:11 PM PDT. (DBC-42602) |
Highway 3 |
Highway 3. Paving operations at Manning Park Resort (64 km east of Hope). Until Tue Aug 30 at 8:00 PM PDT. Lane Closure. Expect delays up to 20 minutes. Last updated Sat Jun 11 at 9:55 AM PDT. (DBC-42125) |
Highway 3 |
Highway 3. Road sweeping between Thistle Rd and Saturday Creek for 15.8 km (32 to 48 km west of Princeton). Until Wed Jun 29. From 8:00 AM to 3:30 PM PDT on Monday, Tuesday and Wednesday. Single lane alternating traffic. Last updated Thu Jun 23 at 7:57 AM PDT. (DBC-42558) |
Highway 3 Both Directions |
Highway 3, in both directions. Watch for falling rocks between Saturday Creek and Rocklin Ave for 28.2 km (Princeton). Last updated Sun Jun 26 at 11:14 AM PDT. (DBC-38278) |
Highway 3 Eastbound |
Highway 3, eastbound. Tree pruning between 62nd Ave and Nine Mile Pit for 18.2 km (18 km east of Osoyoos to Osoyoos). Until Fri Jul 8 at 5:00 PM PDT. Single lane alternating traffic. Starting Mon Jun 20 at 7:00 AM PDT until Fri Jul 8 at 5:00 PM PDT. Single lane alternating traffic will be in effect between Osoyoos and Bridesville. Last updated Fri Jun 24 at 7:22 PM PDT. (DBC-42290) |
Highway 3 |
Highway 3. Ditching between 68th Ave and East Lake Dr for 7.2 km (Christina Lake). From 6:30 AM to 7:30 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Sun Jun 19 at 10:25 AM PDT. (DBC-42402) |
Highway 3 |
Highway 3. Watch for falling rocks between Paulson Bridge and Highway 3B for 17.3 km (15 km east of Christina Lake to 30 km west of Castlegar). Watch for fallen rock. Last updated Tue May 17 at 3:25 PM PDT. (DBC-40614) |
Highway 3 |
Highway 3. Watch for falling rocks between Columbia Ave and Junction Hwy 3B for 22.0 km (2 km east of Castlegar to 12 km west of Salmo). Watch for fallen rock on roadway. Last updated Tue May 17 at 3:26 PM PDT. (DBC-40778) |
Highway 3 |
Highway 3. Blasting between West Avalanche Gate and East Avalanche Gate (1 km west of Kootenay Pass). From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays. Last updated Wed Jun 8 at 10:27 AM PDT. (DBC-41994) |
Highway 3 Both Directions |
Highway 3, in both directions. Washout between East Avalanche Gate and West Creston Rd for 1.3 km (8 to 10 km east of Kootenay Pass). Single lane alternating traffic. Watch for traffic control. Pavement Drop due to Geotechnical Issue. Speed reduced in the area. Watch for signage and obey appropriately. Last updated Fri Jun 17 at 9:56 AM PDT. (DBC-42136) |
Highway 3 Both Directions |
Highway 3, in both directions. Bridge construction between East Avalanche Gate and West Creston Rd (9 km west of Creston). Until Mon Oct 31. Single lane alternating traffic. Expect delays. Width limit 3.40 m. Vehicles with greater width but can clear 1m from road to deck MAY be able to pass through. Last updated Wed Apr 20 at 12:55 PM PDT. (DBC-39892) |
Highway 3 Both Directions |
Highway 3, in both directions. Road construction work between Elko Tunnel and Kubinec Rd for 7.4 km (10 km east of Elko to 10 km west of Fernie). Until Mon Oct 31. From 7:00 AM to 6:00 PM MDT daily. Watch for traffic control. Last updated Wed Jun 8 at 1:57 PM MDT. (DBC-42005) |
Highway 3 Both Directions |
Highway 3, in both directions. Road construction work at Kubinec Rd (10 km west of Fernie). Until Tue Nov 8. From 7:00 AM to 7:00 PM MDT daily. Watch for traffic control. Last updated Mon May 30 at 2:52 PM MDT. (DBC-41635) |
Highway 3 Both Directions |
Highway 3, in both directions. Tree pruning planned between Carbon Creek Bridge and Loop Bridge for 6.8 km (Sparwood). Starting Mon Jun 27 until Thu Jun 30. From 7:00 AM to 7:00 PM MDT on Monday, Tuesday, Wednesday and Thursday. Watch for traffic control personnel. Last updated Thu Jun 23 at 10:41 AM MDT. (DBC-42569) |