Highway 16 |
Highway 16 (Yellowhead Highway). Utility work between Rainbow Avalanche Gates and Rainbow Chain Up for 8.5 km (21 to 29 km east of Prince Rupert). Until Tue Jul 15. Single lane alternating traffic. Watch for traffic control. Last updated Mon Mar 3 at 11:29 AM PST. (DBC-73483) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Kitwanga and Palling Rd W for 237.1 km (17 km west of Gitsegukla to 3 km west of Palling). Until Wed Apr 2 at 5:00 AM PDT. Oversized load move. Intermittent closures up to 20 minutes. Watch for pilot vehicles and traffic control. Last updated Tue Apr 1 at 4:39 PM PDT. (DBC-74674) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road sweeping between Suskwa Forest Service Rd and Owens Rd for 41.5 km (12 km west of Smithers to 10 km east of New Hazelton). From 7:30 AM to 4:30 PM PDT on Wednesday, Thursday and Friday. Please watch for crews and slow moving vehicles. Last updated Wed Mar 26 at 6:06 PM PDT. (DBC-74461) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Utility work between Guay Rd and Pickering Rd for 0.3 km (Prince George). Until Wed Apr 2 at 5:00 PM PDT. Right lane closed. Last updated Fri Mar 28 at 1:15 PM PDT. (DBC-74600) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between Dome Creek Rd and Main St for 50.2 km (McBride). Last updated Tue Apr 1 at 8:55 PM PDT. (DBCRCON-221849) |