Highway 11 Both Directions |
Highway 11, in both directions. Industrial traffic may slow or block regular traffic. Between McClary Ave and Delair Rd (Abbotsford). Until Thu Apr 10. From 7:00 PM to 6:00 AM PDT on weekends. Watch for traffic control. Construction vehicles will be travelling along the shoulder. No lane closures are planned. Next update time Thu Apr 10 at 6:00 PM PDT. Last updated Tue Mar 11 at 2:03 PM PDT. (DBC-73478) |
Highway 11 Northbound |
Highway 11, northbound. Geotechnical investigation planned between Valley Rd and Bateman Rd for 0.6 km (Abbotsford). Starting Wed Apr 9 at 8:00 AM PDT until Wed Apr 9 at 5:00 PM PDT. Right lane will be blocked. Last updated Mon Mar 31 at 12:12 PM PDT. (DBC-74689) |
Highway 11 Both Directions |
Highway 11, in both directions. Road construction work between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Sat Apr 12. From 9:00 PM to 6:30 AM PDT on weekdays and Saturday. Lane Closure. Night time construction work. Alternating lane closures in both directions. One lane in each direction remains open. Southbound lane closure from April 4th-8th. Last updated Thu Mar 27 at 10:00 AM PDT. (DBC-74538) |