Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Industrial traffic may slow or block regular traffic. Between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Fri Jun 6 at 9:30 PM PDT until Sat Jun 7 at 7:00 AM PDT. Lane Closure. Loading of material to and from Millennium Line for project. Next update time Sat Jun 7 at 7:00 AM PDT. Last updated Fri May 23 at 9:12 PM PDT. (DBC-76898) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 AM PDT. Exit ramp is closed. Current Westbound off-ramp loop will be closed. A new off-ramp will be opened before the overpass. The traveling public will exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Thu May 22 at 2:58 PM PDT. (DBC-76914) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). From 7:00 AM to 5:30 PM PDT daily. Single lane alternating traffic. Expect up to 40 minute delays due to railway crossing and construction activities. Closure in effect May 28 and 29 7:00pm-5:00am. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Sat May 24 at 10:24 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. May 13 - Aug 16 7am-5pm Monday to Saturday 60km/h. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Sun May 18 at 2:19 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Alternate route Hwy 97A and 97B. Single lane alternating traffic 8P-6AM Mon-Thurs. Next update time Sun May 25 at 12:00 PM PDT. Last updated Wed May 21 at 10:46 PM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Travelers should expect 30 min closures 7PM-8AM and 2 hour closures 230am-430am, Mon to Sun morning. Stoppages at any time. Next update time Sun Jun 29 at 12:00 PM PDT. Last updated Wed May 21 at 10:49 PM PDT. (DBC-73974) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Shawnigan-Mill Bay Rd and Butterfield Rd for 3.5 km (Mill Bay). Starting Wed May 28 at 8:00 AM PDT until Wed May 28 at 4:00 PM PDT. Shoulder will be closed. Last updated Thu May 15 at 11:06 AM PDT. (DBC-76679) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Trunk Rd and York Rd for 0.6 km (Duncan). Until Sat Jun 14 at 4:00 PM PDT. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Mon May 5 at 7:25 AM PDT. (DBC-74880) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Somenos Rd and Mt Sicker Rd for 1.5 km (2 to 4 km south of Chemainus). Starting Wed May 28 at 8:30 AM PDT until Wed May 28 at 3:30 PM PDT. Lane will be blocked. Last updated Thu May 15 at 10:08 AM PDT. (DBC-76672) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Mon Apr 21 at 11:59 AM PDT. (DBC-70846) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning planned between Dawes St and Chestnut St for 1.7 km (Nanaimo). Starting Tue May 27 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Watch for work crews. Last updated Thu May 22 at 11:53 AM PDT. (DBC-76958) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance planned at Exit 2: Eagleridge Dr (West Vancouver). Starting Wed May 28 at 10:00 PM PDT until Thu May 29 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:05 PM PDT. (DBC-77022) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance planned between Exit 3 and Westport Rd (West Vancouver). Starting Sun May 25 until Tue May 27 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday and Monday. Right lane will be closed. Bridge Washing.
Westbound work: May 25th 10 PM to 5 AM. Eastbound work: May 26th 10 PM to 5 AM. Last updated Fri May 23 at 5:18 PM PDT. (DBC-77020) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance planned between Exit 4: Headland Dr and Almondel Rd (West Vancouver). Starting Thu May 29 at 10:00 PM PDT until Fri May 30 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:14 PM PDT. (DBC-77023) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Lane closures in both directions in effect. No work on long weekends. Last updated Fri May 23 at 11:09 PM PDT. (DBC-74277) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 120: Young Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Wed May 28 until Thu May 29 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Wednesday and Thursday. Right lane will be blocked. Last updated Fri May 23 at 4:19 PM PDT. (DBC-77014) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 123: Prest Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Mon May 26 until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Shoulder will be closed. Last updated Fri May 23 at 4:28 PM PDT. (DBC-77015) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 138: Bridal Falls Rd and Wahleach Access Rd for 1.2 km (7 to 9 km east of Chilliwack). Starting Mon Jun 30 at 9:00 AM PDT until Fri Jul 11 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed. Shoulder will be closed. Speed limit reduced to 80km/h. No work permitted on Fridays or Mondays of a long weekend. Last updated Fri May 23 at 4:18 PM PDT. (DBC-77013) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work between Nicomen River Rd and Junction Hwy 8 for 1.7 km (14 to 12 km west of Spences Bridge). Until Fri Jun 20 at 6:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Last updated Thu May 22 at 2:00 PM PDT. (DBC-76568) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned between Juniper Beach Prov Park Access Rd and Back Valley Rd for 3.2 km (14 to 17 km east of Cache Creek). Starting Wed Jun 4 at 7:00 AM PDT until Wed Jun 4 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 20 at 2:33 PM PDT. (DBC-76829) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation planned between Ballou Rd and Tunkwa Lake Rd for 0.5 km (30 km west of Kamloops). Starting Thu Jun 5 at 7:00 AM PDT until Thu Jun 5 at 7:00 PM PDT. Lane closures in both directions planned. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 22 at 3:50 PM PDT. (DBC-76971) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations between Pat Rd and Miners Bluff Rd for 17.7 km (Kamloops). Until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control. Last updated Tue May 20 at 7:02 AM PDT. (DBC-76609) |
Highway 1 |
Highway 1 (TransCanada Highway). Mowing between Old Ferry Rd and Des Fosses Rd for 44.2 km (7 km east of Kamloops to 14 km east of Chase). Starting Mon May 26 until Mon Jun 9. From 7:00 AM to 3:30 PM PDT on weekdays. Watch for slow moving equipment and shadow trucks. Last updated Thu May 22 at 12:29 PM PDT. (DBC-76962) |
Highway 1 |
Highway 1 (TransCanada Highway). Pavement patching is planned. Between Old Ferry Rd and Des Fosses Rd for 44.1 km (7 km east of Kamloops to 14 km east of Chase). Starting Mon May 26 until Mon Jun 9. From 7:00 AM to 3:30 PM PDT on weekdays. Lane Closure. Patching - Moving work zone, expect intermittent lane closures. Last updated Thu May 22 at 12:27 PM PDT. (DBC-76961) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (13 to 5 km west of Chase). Starting Mon Jun 9 at 8:00 AM PDT until Fri Jun 13 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Thu May 15 at 1:28 PM PDT. (DBC-76683) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (5 to 13 km west of Chase). Starting Tue May 27 at 8:00 AM PDT until Fri May 30 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed May 14 at 1:05 PM PDT. (DBC-76630) |
Highway 1 |
Highway 1 (TransCanada Highway). Maintenance planned between Silver Sands Rd and Seed Frtg for 0.8 km (Sicamous). Starting Mon May 26 at 5:30 AM PDT until Mon May 26 at 10:00 AM PDT. Watch for traffic control personnel. Catch basin cleaning - Moving work zone, be prepared for short intermittent lane closures. Last updated Thu May 22 at 12:51 PM PDT. (DBC-76963) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned between 19 Mile OH Bridge and Enchanted Forest Ftg Rd for 1.9 km (27 to 29 km west of Revelstoke). Starting Mon May 26 until Fri May 30. From 10:30 AM to 2:30 PM PDT on weekdays. Watch for traffic control personnel. Last updated Thu May 22 at 9:21 AM PDT. (DBC-76943) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Mon May 26 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of 20 minutes. Work scheduled 12pm to 7pm Thursday May 22. Work returns to 5am-5pm daily starting Friday May 23. Last updated Wed May 21 at 7:01 PM PDT. (DBC-74730) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance planned between Pine Rd and Clanwilliam OH Bridge for 6.2 km (2 to 9 km west of Revelstoke). Starting Thu May 29 at 7:30 AM PDT until Thu May 29 at 5:00 PM PDT. Watch for traffic control personnel. Environmental cleanup work will be taking place. Last updated Thu May 22 at 9:47 AM PDT. (DBC-76946) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Single lane alternating traffic with a 4 meter width restriction. Speed reduction to 30km/h during construction. Last updated Tue May 20 at 5:08 PM PDT. (DBC-75826) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Back Rd and Pine Rd for 0.5 km (3 to 2 km west of Revelstoke). Starting Mon May 26 until Thu May 29. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Thu May 15 at 3:02 PM PDT. (DBC-76629) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. No work on long weekends. Last updated Tue May 13 at 2:27 PM PDT. (DBC-76584) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Townley St and Greely Rd for 6.1 km (Revelstoke). Starting Tue May 27 at 8:00 AM PDT until Tue May 27 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed May 21 at 8:50 AM PDT. (DBC-76881) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Wed May 21 at 10:39 AM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Maintenance between Redgrave Rest Area and Anderson Rd for 39.9 km (14 km east of East Boundary of Glacier National Park to 1 km west of Golden). From 8:00 AM to 3:30 PM MDT on Monday and Tuesday. Last updated Mon May 5 at 8:18 AM MDT. (DBC-76164) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Sat May 24 at 8:35 AM MDT. (DBC-44269) |