Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Thu Apr 17 at 3:00 PM PDT. Last updated Fri Mar 21 at 10:06 AM PDT. (DBC-73930) |
Barnston Island Ferry |
Barnston Island Ferry. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Fri Apr 4. Foot passenger only service times: Mar 29th 12:30pm-2:30pm, Mar 30th 12:30pm-4:00pm, Mar 31st 1pm-5:30pm, Apr 1st 1:00pm-6:00pm, Apr 2nd 2:00pm - 7:30pm, Apr 3rd 3:00pm-8:00pm, Apr 4th 3:30pm-9:00pm. Next update time Fri Apr 4 at 9:00 PM PDT. Last updated Thu Mar 27 at 2:50 PM PDT. (DBC-74560) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Tue Apr 1. Schedule modification, early shutdown; Mar 28 at 10:00PM, Mar 29 at 10:00pm, Mar 30 at 10:00PM, Mar 31 at 11:00PM, Apr 1 at 11:00PM. Next update time Wed Apr 2 at 6:15 AM PDT. Last updated Thu Mar 27 at 2:22 PM PDT. (DBC-74557) |
Big Bar Reaction Ferry |
Big Bar Reaction Ferry. Travel advisory in effect at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Road closed for the season. The Aerial Car is in operation for foot traffic only. Next update time Fri May 30, 2025. Last updated Tue Nov 19 at 9:13 AM PST. (DBC-70341) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Thu Apr 3 at 9:30 PM PDT until Fri Apr 4 at 7:00 AM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Next update time Fri Apr 4 at 7:00 AM PDT. Last updated Mon Mar 24 at 1:18 PM PDT. (DBC-74360) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between North Rd and Exit 40: Brunette Ave for 1.3 km (Coquitlam). Until Sun Mar 30 at 7:00 AM PDT. Expect Major delays due to congestion. Only the HOV lane is open. Next update time Sun Mar 30 at 7:00 AM PDT. Last updated Sat Mar 29 at 11:15 PM PDT. (DBC-74642) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Until Mon Mar 31 at 12:15 AM PDT. Lane Closure. Exit ramp is closed. Expect delays. Emergency work will have Hwy 1 reduced to one lane EB and one lane WB until further notice. Median crossover in effect. 5m lane width accommodated. EB exit 165 closed, use exit 168. Next update time Mon Mar 31. Last updated Thu Mar 27 at 3:08 PM PDT. (DBC-73987) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Gladwin Rd and Nicomen River Rd for 0.1 km (10 km east of Lytton). Until Mon Sep 15 at 10:00 AM PDT. From 7:00 AM to 5:30 PM PDT daily. Intermittent stoppages and single lane alternating traffic. Expect up to 40 minute delays. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Mar 25 at 6:01 PM PDT. (DBC-69330) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 60km/h limit through work zone. Intermittent delays of up to 5 minutes. Four stoppages of up to 20 minutes between 9 AM and 3 PM. Watch for traffic control. Next update time Tue Apr 1 at 5:00 PM PST. Last updated Thu Jan 23 at 10:11 AM PST. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Watch for traffic control. Road closed. Use alternate route Highway 97A and 97B. Single lane alternating Monday to Saturday nightly 8 PM - 6 AM. Next update time Sun Mar 30 at 12:00 PM PDT. Last updated Mon Mar 24 at 9:23 AM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Thu Apr 17. Mar 26-29 - 30 min delays 7AM-6PM. Mar 31 to Apr 17: 30 min delays from 12AM-5AM and 7AM-12AM. Traffic disruptions subject to weather. Next update time Thu Apr 17 at 9:00 AM PDT. Last updated Fri Mar 14 at 2:18 PM PDT. (DBC-73974) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closure planned at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Starting Mon Mar 31. Redgrave rest area will be permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Mar 31 at 10:00 AM MDT. Last updated Fri Mar 14 at 10:21 AM MDT. (DBC-73964) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop will be closed. Eastbound exit ramp from Highway 1 onto 264th remains open, the straight thru lane after the exit loop will be closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sat Mar 29 at 10:20 AM PDT. (DBC-74478) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Utility work planned at 92 Ave (Surrey). Starting Mon Apr 7 at 2:00 AM PDT until Fri Apr 11 at 5:00 AM PDT. From 2:00 AM to 5:00 AM PDT on weekdays. Next update time Fri Apr 11 at 5:00 AM PDT. Last updated Mon Mar 24 at 6:26 PM PDT. (DBC-74380) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Mon Apr 14, 2025 at 9:00 AM PST. Last updated Mon Dec 9 at 5:50 PM PST. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Apr 23, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 1:06 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Thu Apr 17, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 2:46 PM PDT. (DBC-28386) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 10, 2025 at 9:00 AM PST. Last updated Tue Dec 10 at 9:04 AM PST. (DBC-53013) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Single Car per green light and 5-tonne load restriction in place until 10:00AM on Mar 30th, 2025. Full road closures will begin again on March 24th between 10am-2pm, 7 days per week. Single lane alternating traffic will be in place outside of these hours. Next update time Mon Mar 31 at 2:30 PM PDT. Last updated Thu Mar 27 at 9:39 AM PDT. (DBC-61149) |
Other Roads Both Directions |
Cave Road, in both directions. Landslide at Quesnel-Hixon Road. Road closed. Landslide on Cave Road. Next update time Tue Apr 1, 2025 at 10:00 AM PDT. Last updated Wed Oct 9 at 10:17 AM PDT. (DBC-67913) |
Other Roads |
Williams Lake Cut Off Rd. Flooding between Xats'Ull Heritage Site Way and Williams Lake Cut Off Rd. Road closed. Williams Lake Cut Off Rd is closed south of Xats'Ull Heritage Site Way and north of Springfield Ranch due to flooding. Next update time Fri Apr 4 at 2:30 PM PDT. Last updated Fri Mar 28 at 2:21 PM PDT. (DBC-73346) |
Other Roads |
Bear Creek Main Forest Service Road. Washout at Westside Road near Kelowna. Road closed. Next update time Sun Mar 30 at 11:00 AM PDT. Last updated Sat Mar 29 at 4:10 PM PDT. (DBC-74624) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned at West Shore Pky (Langford). Starting Wed Apr 16 at 10:00 PM PDT until Thu Apr 17 at 6:00 AM PDT. From 10:00 PM to 6:00 AM PDT on Wednesday and Thursday. Highway 1 northbound, the inside left turn lane to West Shore Parkway is closed. Outside left turn lane remains open. Last updated Wed Mar 26 at 2:41 PM PDT. (DBC-74497) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road sweeping between Butterfield Rd and Trunk Rd for 21.4 km (Mill Bay to Duncan). From 7:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Lane Closure. Watch for traffic control. Road sweeping in effect, alternating lanes will be closed, please watch for traffic control. Last updated Mon Mar 24 at 10:14 AM PDT. (DBC-74347) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Norcross Rd and Sprott Rd (1 km north of Duncan). Starting Fri Apr 4 until Thu Apr 10 at 6:00 AM PDT. From 8:00 PM to 6:00 AM PDT daily. Lane closures in both directions planned. Expect delays. Watch for traffic control personnel. Last updated Tue Mar 11 at 9:07 AM PDT. (DBC-73790) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Spruston Rd and Morden Rd for 0.8 km (5 km south of Nanaimo). Starting Mon Mar 31 at 9:00 AM PDT until Tue Apr 1 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Canyon Bridge Surveying - between Cassidy Rest Stop and Nanaimo River Rd. Watch for speed reduction and work crews. Last updated Wed Mar 19 at 8:55 AM PDT. (DBC-74142) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Tuesday Apr 1 right lane closure closure 9am-5pm. Watch for work crews. Last updated Thu Mar 27 at 5:52 PM PDT. (DBC-70846) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Bastion St and Commercial St for 0.1 km (Nanaimo). Starting Wed Apr 16 at 9:00 AM PDT until Wed Apr 16 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Gas service installation - watch for work crews. Last updated Fri Mar 14 at 9:21 AM PDT. (DBC-73965) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Construction work planned between Poplar St and St. George St for 0.1 km (Nanaimo). Starting Mon Mar 31 at 9:00 AM PDT until Tue Apr 1 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Construction work - Concrete Pour. Watch for work crews. Last updated Tue Mar 25 at 9:42 AM PDT. (DBC-74422) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 1.6 km (West Vancouver). Starting Tue Apr 1 at 9:00 PM PDT until Thu Apr 3 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on Tuesday, Wednesday and Thursday. Lane Closure. Last updated Tue Mar 25 at 5:46 PM PDT. (DBC-74447) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 1.6 km (West Vancouver). Starting Thu Apr 3 at 9:00 AM PDT until Thu Apr 3 at 4:00 PM PDT. Shoulder will be closed. Last updated Thu Mar 20 at 10:54 AM PDT. (DBC-74212) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned at Exit 19: Lynn Valley Rd (North Vancouver - City). Starting Mon Apr 7 at 7:00 AM PDT until Mon Apr 14 at 5:00 PM PDT. Shoulder will be closed. Tree felling. Last updated Fri Mar 28 at 4:26 PM PDT. (DBC-74616) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Geotechnical investigation between 248 St and Exit 73 for 2.3 km (Langley - District). Until Mon Mar 31. From 9:00 AM to 5:30 AM PST daily. Lane closures in effect. Intermittent 20 minute holds as required between 11:30 PM and 4:30 AM. Closure of the 264th off ramp as required. Watch for traffic control. Last updated Tue Feb 11 at 9:42 AM PST. (DBC-72761) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Bradner Rd and Exit 87: Clearbrook Rd for 3.8 km (Abbotsford). Until Mon Mar 31. From 8:30 PM to 5:30 AM PST on weekdays and Sunday. Left lane is closed in both directions. Last updated Wed Feb 19 at 11:15 AM PST. (DBC-72992) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Electrical maintenance between Old Boston Bar Rd and Larch Rd for 0.4 km (27 to 26 km south of Jackass Mountain Summit). Until Tue Apr 1. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane is blocked. Single lane alternating traffic. Last updated Fri Mar 28 at 8:57 AM PDT. (DBC-74215) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Snow deposit removal between Ainslie Rd N and Slanzi Rd for 3.3 km (20 to 17 km south of Jackass Mountain Summit). Until Fri Apr 4. From 7:00 AM to 7:00 PM PDT daily. Right lane is blocked. Last updated Tue Mar 4 at 11:17 AM PDT. (DBC-73530) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Main St and Gladwin Rd for 3.7 km (Lytton). Starting Thu Apr 3 at 8:00 AM PDT until Fri Apr 11 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Mar 27 at 7:27 AM PDT. (DBC-74525) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Nicomen River Rd and Junction Hwy 8 for 18.4 km (14 km east of Lytton to Spences Bridge). Starting Tue Apr 1 at 8:00 AM PDT until Fri Apr 4 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Mar 28 at 10:09 AM PDT. (DBC-74587) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Old Cariboo Rd and Collins Rd for 0.8 km (Cache Creek). Starting Tue Apr 1 until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Lane Closure. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:19 AM PDT. (DBC-74589) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Pacific Way (Kamloops). Until Fri May 2 at 7:00 PM PDT. Exit ramp is closed. Last updated Fri Feb 28 at 9:16 AM PDT. (DBC-73373) |
Highway 1 |
Highway 1 (TransCanada Highway). Road sweeping between Old Ferry Rd and Des Fosses Rd for 43.3 km (8 km east of Kamloops to 14 km east of Chase). Until Wed Apr 9. 24 hours a day. Watch for slow moving equipment and shadow vehicles. Last updated Tue Mar 18 at 3:21 PM PDT. (DBC-74107) |
Highway 1 |
Highway 1 (TransCanada Highway). Pavement patching underway at Miners Bluff Rd (10 km east of Kamloops). Until Mon Mar 31. Lane Closure. Patching daily, lane closure in place 24 hours a day. No delays expected. Last updated Thu Mar 6 at 12:24 PM PST. (DBC-73518) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Old Ferry Rd and Des Fosses Rd for 42.9 km (14 km east of Chase to 8 km east of Kamloops). Watch for Wildlife. Last updated Sat Mar 29 at 3:59 PM PDT. (DBC-73567) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between 50A St NE and 60 Ave NE for 1.0 km (Salmon Arm). Starting Mon Mar 31 at 8:00 AM PDT until Fri Apr 4 at 4:00 PM PDT. Roadway will be reduced to two lanes. Expect minor delays. Last updated Tue Mar 25 at 11:59 AM PDT. (DBC-74432) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Canoe Beach Dr NE and Old Sicamous Rd for 19.1 km (Salmon Arm to Sicamous). Until Wed Apr 30. Single lane alternating traffic. Watch for traffic control. BC Hydro pole replacement. Last updated Thu Mar 13 at 1:25 PM PDT. (DBC-73920) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Des Fosses Rd and Bernie Rd for 57.6 km (8 km west of Sicamous to 14 km east of Chase). Wildlife advisory in effect. There is debris on the road. Watch for Wildlife. Last updated Sat Mar 29 at 3:59 PM PDT. (DBC-73565) |
Highway 1 |
Highway 1 (TransCanada Highway). Road sweeping between Des Fosses Rd and Bernie Rd for 57.6 km (8 km west of Sicamous to 14 km east of Chase). Until Thu Apr 3. 24 hours a day. Watch for slow moving equipment and shadow trucks. Be prepared for sudden lane closures. Last updated Thu Mar 20 at 12:01 PM PDT. (DBC-74216) |
Highway 1 |
Highway 1 (TransCanada Highway). Road sweeping between Husky Frtg and Perry River Bridge for 26.6 km (Sicamous). Until Thu Apr 3. 24 hours a day. Watch for slow moving equipment and shadow trucks. Be prepared for sudden lane closures. Last updated Thu Mar 20 at 12:04 PM PDT. (DBC-74217) |
Highway 1 |
Highway 1 (TransCanada Highway). There is debris on the road between Enquist Frtg and Malakwa Rd for 5.8 km (9 to 3 km east of Sicamous). Watch for falling ice debris on road. Last updated Wed Feb 26 at 3:05 PM PST. (DBC-73285) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Debris on roadway between Des Fosses Rd and Perry River Bridge for 96.4 km (25 km east of Sicamous to 14 km east of Chase). Watch for falling rocks. Watch for Wildlife. Last updated Sat Mar 29 at 3:59 PM PDT. (DBC-73360) |
Highway 1 |
Highway 1 (TransCanada Highway). Limited visibility with fog between Perry River Bridge and Glacier National Park West Boundary for 90.1 km (25 km east of Sicamous to 1 km east of West Boundary of Glacier National Park). Last updated Sun Mar 30 at 12:10 AM PDT. (DBCRCON-221649) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling ice between Bowolin Rd and Highway 23 South for 40.6 km (26 km east of Sicamous to Revelstoke). Watch for falling rocks. Last updated Mon Mar 3 at 5:13 AM PST. (DBC-73317) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Three Valley Avalanche Gate and Summit Lake OH Bridge for 7.9 km (18 to 10 km west of Revelstoke). Starting Wed Apr 9 at 7:00 AM PDT until Wed Apr 9 at 5:00 PM PDT. Westbound lane will be closed. Single lane alternating traffic will be in effect. Speed limit reduced to 70km/h. Last updated Thu Mar 27 at 10:16 AM PDT. (DBC-74544) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance planned between Highway 23 South and Big Eddy Rd for 1.8 km (Revelstoke). Starting Tue Apr 8 at 7:00 AM PDT until Tue Apr 8 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Environmental clean up from previous incident. Last updated Thu Mar 27 at 10:47 AM PDT. (DBC-74545) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling ice between Victoria Rd W and Glacier National Park West Boundary for 48.1 km (Revelstoke to 1 km east of West Boundary of Glacier National Park). Watch for falling rocks. Last updated Mon Mar 3 at 5:10 AM PST. (DBC-73454) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Jumping Creek Rd and Lanark Snowshed for 4.2 km (1 to 5 km west of West Boundary of Glacier National Park). Starting Wed Apr 2 at 8:00 AM PDT until Wed Apr 2 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Next update time Wed Apr 2 at 3:00 PM PDT. Last updated Sat Mar 29 at 9:39 AM PDT. (DBC-74632) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling ice between Glacier National Park West Boundary and Glacier National Park East Boundary for 43.5 km (1 km east of West Boundary of Glacier National Park to East Boundary of Glacier National Park). Watch for falling rocks. Next update time Mon Mar 31 at 4:30 PM PDT. Last updated Sat Mar 15 at 4:43 PM PDT. (DBC-73291) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between Quartz Creek Bridge (Structure) and Redgrave Rest Area for 0.4 km (14 km east of East Boundary of Glacier National Park). Until Tue Apr 15. From 6:00 AM to 6:00 PM MDT on weekdays. Road maintenance work. 10-15 minute delays expected. Last updated Mon Mar 17 at 10:52 AM MDT. (DBC-74044) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Wed Jan 15 at 1:22 AM MST. (DBC-44269) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work between 128 St and 132 St for 0.8 km (Surrey). Until Fri Apr 4. From 10:00 PM to 5:00 AM PDT daily. Left turn lane closed. Right lane closed. Last updated Tue Mar 18 at 12:35 PM PDT. (DBC-74102) |
Highway 10 |
Highway 10. Utility work between Panorama Dr and 152 St (Surrey). Watch for traffic control. Crews will be working east of Highway 10. Last updated Tue Mar 25 at 9:28 AM PDT. (DBC-74419) |
Highway 10 Eastbound |
Highway 10, eastbound. Construction work between Mufford Cres and Mufford Glover Overpass for 0.4 km (Langley - District). Until Sat Apr 5. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Last updated Thu Mar 20 at 4:37 PM PDT. (DBC-73330) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work between Sakinaw Lake Rd and McKay Rd for 5.2 km (37 to 31 km west of Sechelt). Until Mon Apr 7. From 8:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Last updated Tue Mar 18 at 9:42 AM PDT. (DBC-74094) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Iska Rd and Spipyus Rd for 0.2 km (17 to 16 km west of Sechelt). Starting Wed Apr 9 at 8:00 AM PDT until Wed Apr 9 at 5:00 PM PDT. Westbound lane will be closed. Single lane alternating traffic will be in effect. Two-way traffic will be maintained where space allows. Last updated Wed Mar 26 at 1:37 PM PDT. (DBC-74494) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19. From 8:00 AM to 4:00 PM PST daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Thu Jan 30 at 11:05 AM PST. (DBC-72411) |
Highway 11 Both Directions |
Highway 11, in both directions. Industrial traffic may slow or block regular traffic. Between McClary Ave and Delair Rd (Abbotsford). Until Thu Apr 10. From 7:00 PM to 6:00 AM PDT on weekends. Watch for traffic control. Construction vehicles will be travelling along the shoulder. No lane closures are planned. Next update time Thu Apr 10 at 6:00 PM PDT. Last updated Tue Mar 11 at 2:03 PM PDT. (DBC-73478) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work between London Ave Overpass and Cedar Valley Conn for 0.6 km (Mission). Until Mon Mar 31. From 9:00 PM to 5:00 AM PDT daily. Centre lane blocked. Shoulder closed. Work parameters are on Highway 11 from London Avenue to 150 meters north of Highway 7. Last updated Tue Mar 11 at 1:26 PM PDT. (DBC-73799) |
Highway 11 Both Directions |
Highway 11, in both directions. Road construction work planned between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Starting Mon Mar 31 until Sat Apr 12. From 9:00 PM to 6:30 AM PDT on weekdays and Saturday. Lane Closure. Night time construction work planned. Alternating lane closures in both directions. One lane in each direction remains open. Southbound lane closure from April 4th-8th. Last updated Thu Mar 27 at 10:00 AM PDT. (DBC-74538) |
Highway 12 |
Highway 12. Utility work between Lytton Ferry Rd and Kirbys Flat Rd for 8.8 km (1 to 10 km north of Lytton). Until Mon Mar 31 at 5:00 PM PST. Single lane alternating traffic. Watch for traffic control. Last updated Fri Feb 28 at 9:36 AM PST. (DBC-73377) |
Highway 12 |
Highway 12. Watch for falling rocks between the start of Highway 12 and Kirbys Flat Rd for 22.2 km (Lytton). Last updated Sat Mar 29 at 4:49 AM PDT. (DBC-73451) |
Highway 12 |
Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Mon Apr 7. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Mar 19 at 9:38 AM PDT. (DBC-74148) |
Highway 13 Northbound |
Highway 13, northbound. Utility work between 30A Ave and 36 Ave for 1.0 km (Langley - District). Until Wed Apr 2. From 9:00 AM to 3:30 PM PDT on weekdays. Right turn lane closed. Watch for traffic control. Next update time Wed Apr 2 at 3:00 PM PDT. Last updated Mon Mar 17 at 3:58 PM PDT. (DBC-74068) |
Highway 13 Both Directions |
Highway 13, in both directions. Geotechnical investigation between 48 Ave and the end of Highway 13 for 1.6 km (Langley - District). Until Mon Mar 31. From 9:00 PM to 5:30 AM PST daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Feb 11 at 9:49 AM PST. (DBC-72763) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Thu Mar 20 at 9:08 AM PDT. (DBC-74197) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Both Directions |
Highway 14, in both directions. Road construction work between Sombrio Beach Trail and Petrel Dr for 1.1 km (18 to 17 km west of Jordan River). Until Mon Mar 31. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Last updated Thu Mar 13 at 9:53 AM PDT. (DBC-73905) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work planned between Fore Bay Rd and Fishboat Bay Rd for 1.0 km (2 to 3 km east of Jordan River). Starting Tue Apr 1 until Thu Apr 3. From 9:00 AM to 3:00 PM PDT daily. Eastbound lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Mar 24 at 1:02 PM PDT. (DBC-74356) |
Highway 14 Eastbound |
Highway 14, eastbound. Maintenance planned between Tieulie Pl and Kirby Creek Rd for 0.1 km (9 km east of Jordan River). Starting Mon Apr 7 at 9:00 AM PDT until Mon Apr 7 at 3:00 PM PDT. Right lane will be blocked. Single lane alternating traffic will be in effect. Last updated Wed Mar 26 at 12:47 PM PDT. (DBC-74488) |
Highway 14 |
Highway 14. Utility work planned between Whiffin Spit Rd and Tominny Rd for 0.2 km (Sooke). Starting Tue Apr 8 at 9:00 AM PDT until Tue Apr 8 at 3:00 PM PDT. Eastbound lane will be closed. Single lane alternating traffic will be in effect. Last updated Wed Mar 26 at 12:24 PM PDT. (DBC-74486) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work planned between Goodmere Rd and Dover St (Sooke). Starting Mon Apr 7 at 7:00 PM PDT until Tue Apr 8 at 5:00 AM PDT. Watch for traffic control personnel. Last updated Tue Mar 25 at 9:20 AM PDT. (DBC-74418) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work between Lazzar Rd and Parkland Rd for 0.8 km (Sooke). Until Mon Mar 31. From 10:00 AM to 2:00 PM PDT daily. Watch for traffic control. Next update time Mon Mar 31 at 10:00 AM PDT. Last updated Fri Mar 14 at 10:53 AM PDT. (DBC-73976) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work planned between Parkland Rd and Woodlands Rd for 0.4 km (Sooke). Starting Mon Mar 31 until Fri Apr 18. From 7:00 PM to 5:00 AM PDT daily. Watch for traffic control personnel. Next update time Fri Apr 18 at 5:00 AM PDT. Last updated Fri Mar 14 at 12:56 PM PDT. (DBC-73980) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work planned between Harbourview Rd and Ludlow Rd for 0.7 km (Sooke). Starting Mon Apr 14 until Fri May 9 at 2:00 PM PDT. From 10:00 AM to 2:00 PM PDT daily. Shoulder will be closed. Work will not be impacting traffic. Last updated Thu Mar 27 at 1:15 PM PDT. (DBC-74550) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work planned between 32 Ave and 40 Ave for 1.6 km (Surrey). Starting Sat Apr 12 until Mon May 12. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Thu Mar 13 at 3:24 PM PDT. (DBC-73932) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Construction work planned at 60 Ave (Surrey). Starting Mon Mar 31 at 9:00 AM PDT until Fri Apr 4 at 3:00 PM PDT. Right lane will be closed. Last updated Thu Mar 27 at 4:09 PM PDT. (DBC-74564) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between Golden Ears Way and 88 Ave for 0.9 km (Surrey). Until Fri Apr 4 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right turn lane partially blocked at 92 Ave. Last updated Mon Mar 24 at 6:38 PM PDT. (DBC-74378) |
Highway 16 |
Highway 16 (Yellowhead Highway). Utility work between Rainbow Avalanche Gates and Rainbow Chain Up for 8.5 km (21 to 29 km east of Prince Rupert). Until Tue Jul 15. Single lane alternating traffic. Watch for traffic control. Last updated Mon Mar 3 at 11:29 AM PST. (DBC-73483) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road sweeping between Suskwa Forest Service Rd and Owens Rd for 41.5 km (12 km west of Smithers to 10 km east of New Hazelton). From 7:30 AM to 4:30 PM PDT on Wednesday, Thursday and Friday. Please watch for crews and slow moving vehicles. Last updated Wed Mar 26 at 6:06 PM PDT. (DBC-74461) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Utility work between Pine Rd and Endako Mine Rd for 5.8 km (Endako). Until Mon Mar 31 at 5:00 PM PST. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Tue Feb 25 at 11:30 AM PST. (DBC-73234) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Utility work planned between Guay Rd and Pickering Rd for 0.3 km (Prince George). Starting Tue Apr 1 at 8:00 AM PDT until Wed Apr 2 at 5:00 PM PDT. Right lane will be closed. Last updated Fri Mar 28 at 1:15 PM PDT. (DBC-74600) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Mowing between Mcbride Bridge and Hwy 5/16 JCT at Tete Jaune for 61.7 km (1 km east of McBride to Tete Jaune). Until Mon Mar 31 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon Mar 24 at 8:34 AM PDT. (DBC-74341) |
Highway 17 Southbound |
Highway 17 (Patricia Bay Highway), southbound. Special event planned between Lands End Rd and Exit 31 (North Saanich). Starting Wed Jul 23 at 6:00 PM PDT until Wed Jul 23 at 7:30 PM PDT. Victoria Wheelers Cycling Club Bike Race - watch for cyclists at Wain Rd off ramp. Last updated Tue Mar 25 at 9:50 AM PDT. (DBC-74423) |
Highway 18 Both Directions |
Highway 18, in both directions. Utility work planned between Drinkwater Rd and Somenos Rd for 0.7 km (22 km east of Lake Cowichan). Starting Mon Mar 31 at 8:00 AM PDT until Mon Mar 31 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. BC HYDRO pole replacement - watch for work crews. Last updated Wed Mar 19 at 12:26 PM PDT. (DBC-72588) |
Highway 19 |
Highway 19 (Island Highway). Utility work planned between Beaver Cove Rd and Reload Railway S Overpass for 4.4 km (14 to 19 km south of Port McNeill). Starting Wed Apr 2 at 8:00 AM PDT until Wed Apr 2 at 5:00 PM PDT. Single lane alternating traffic will be in effect. BC Hydro Pole Replacements. Last updated Wed Mar 19 at 11:21 AM PDT. (DBC-74155) |
Highway 19 |
Highway 19 (Island Highway). Water pooling between Beaver Cove Rd and Rainbow Rd for 120.7 km (15 km south of Port McNeill to 51 km north of Campbell River). Last updated Sat Mar 29 at 3:47 PM PDT. (DBCRCON-221682) |
Highway 19 Northbound |
Highway 19 (Island Highway), northbound. Utility work between Big Tree Creek Rest Area and Mountview Dr for 13.0 km (34 to 47 km north of Campbell River). BC Hydro Pole replacement. Last updated Mon Feb 10 at 9:51 AM PST. (DBC-72724) |
Highway 19 |
Highway 19 (Island Highway). Electrical maintenance planned at Coulter Rd (Campbell River). Starting Mon Mar 31 at 8:30 AM PDT until Mon Mar 31 at 2:00 PM PDT. Watch for traffic control personnel. Last updated Thu Mar 27 at 1:41 PM PDT. (DBC-74551) |
Highway 19 |
Highway 19 (Inland Island Highway). Heavy rain between Duncan Bay Main and Cook Creek Rd for 56.7 km (12 km south of Campbell River to 28 km south of Cumberland). Last updated Sat Mar 29 at 7:15 AM PDT. (DBCRCON-221677) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Bridge maintenance between Cook Creek Rd and Parksville Exit (Highway 19A) for 41.2 km (28 km south of Cumberland to 1 km south of Parksville). Until Fri Apr 4 at 4:30 PM PDT. From 8:00 AM to 4:30 PM PDT on weekdays. Right lane is closed in both directions. Last updated Fri Mar 14 at 11:56 AM PDT. (DBC-73978) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Bridge maintenance between Parksville Exit (Highway 19A) and Wilkinson Rd for 35.8 km (1 km south of Parksville to Nanaimo). Until Thu Apr 17 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane is closed in both directions. Watch for traffic control. Last updated Wed Mar 26 at 10:58 AM PDT. (DBC-74467) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Bridge maintenance between Cranberry Ave and the end of Highway 19 (Island Highway) for 7.9 km (Nanaimo). Until Thu Apr 17 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane is closed in both directions. Watch for traffic control. Last updated Wed Mar 26 at 11:03 AM PDT. (DBC-74479) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Bridge maintenance between Exit 46 and Cook Creek Rd for 43.4 km (Parksville to 12 km south of Buckley Bay Ferry Terminal). Until Fri Apr 4 at 4:30 PM PDT. Single lane alternating traffic. Expect delays. Last updated Mon Mar 10 at 2:23 PM PDT. (DBC-73758) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Construction work between Columbia Dr and Lee Rd for 0.1 km (2 to 1 km north of Parksville). Until Thu Apr 17 at 6:00 PM PDT. Watch for traffic control. Shoulder closed. Shoulder closed between Lee Rd and French Creek Bridge. Watch for work crews. Last updated Fri Mar 14 at 8:43 AM PDT. (DBC-73963) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work between Columbia Dr and Yambury Rd for 1.5 km (Qualicum Beach to 2 km south of Qualicum Beach). Until Fri Apr 4 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Utility work - Pole cable transfers. Watch for work crews. Last updated Tue Mar 11 at 1:23 PM PDT. (DBC-73804) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work between Kinkade Rd and Hobbs Rd for 3.0 km (3 km north of Qualicum Beach to Qualicum Beach). Until Fri Apr 4 at 3:00 PM PDT. Utility Work - Single Lane alternating traffic in localized areas between Hobbs Rd and Kinkade Rd. Watch for work crews. Expect minor delays. Last updated Wed Mar 12 at 11:54 PM PDT. (DBC-73806) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Construction work between Sundry Rd and Coburn Rd (18 km north of Qualicum Beach). Until Mon Mar 31 at 5:00 PM PDT. Shoulder closed. Watch for traffic control. Bus stop Upgrades - Work on shoulder. Watch for work crews. Last updated Wed Mar 19 at 9:33 AM PDT. (DBC-74146) |
Highway 19A |
Highway 19A (Island Highway). Limited visibility with fog between Jamieson Rd and Glenmore Rd for 58.5 km (12 km south of Buckley Bay Ferry Terminal to 11 km south of Campbell River). Last updated Sun Mar 30 at 1:44 AM PDT. (DBCRCON-221678) |
Highway 19A |
Highway 19A (Island Highway). Tree pruning between Buckley Bay Rd and Royston Rd for 15.8 km (Buckley Bay Ferry Terminal to 2 km south of Courtenay). Until Fri May 2 at 4:00 PM PST. Single lane alternating traffic. Tree maintenance around BC Hydro poles/lines Mon-Fri 9-3. Last updated Mon Jan 27 at 10:19 AM PST. (DBC-72227) |
Highway 1A Both Directions |
Highway 1A, in both directions. Construction work planned between 196A St and Landmark Way for 0.1 km (Langley - District). Starting Mon Mar 31 until Mon Mar 31. Shoulder will be closed. Watch for traffic control personnel. Work is a part of the Skytrain Project. Last updated Tue Mar 11 at 1:04 PM PDT. (DBC-73801) |
Highway 20 |
Highway 20. Utility work between Nimpo Lake Road North and Fish Trap recreation Site. Until Wed Apr 2. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Please watch for signage and personnel. Last updated Mon Mar 10 at 1:18 PM PDT. (DBC-73752) |
Highway 20 |
Highway 20. Watch for slippery sections between Olsen Dr and Rainbow Range Trailhead for 77.7 km (16 km east of Bella Coola to 39 km west of Anahim Lake). Muddy sections. Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221689) |
Highway 20 |
Highway 20. Watch for slippery sections between Hunlen Falls Turner Lakes Trailhead and Kappan Mtn Rd for 40.7 km (Anahim Lake). Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221690) |
Highway 22 |
Highway 22. Watch for slippery sections between US Border and Warfield Hill Rd for 20.2 km (BC and WA Border, South of Rossland to Trail). Last updated Sat Mar 29 at 8:49 PM PDT. (DBCRCON-221693) |
Highway 23 |
Highway 23. Limited visibility with fog between Junction Hwy 31 and Junction Highway 1 for 49.0 km (Revelstoke). Last updated Sun Mar 30 at 12:10 AM PDT. (DBCRCON-221561) |
Highway 23 Both Directions |
Highway 23, in both directions. Watch for falling ice between Junction Highway 1 and Mica Dam for 150.1 km (Revelstoke to 5 km north of Mica Dam). Watch for falling rocks. Last updated Mon Mar 3 at 6:59 AM PST. (DBC-73459) |
Highway 27 Both Directions |
Highway 27, in both directions. Utility work between Braeside Rd and Malcom Rd for 39.0 km (7 to 46 km south of Fort St James). Until Mon Mar 31 at 5:00 PM PST. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Tue Feb 25 at 11:28 AM PST. (DBC-73232) |
Highway 28 |
Highway 28. Utility work between Gold River Hwy and Western Mine Rd for 39.7 km (Gold River to 37 km west of Campbell River). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Minor Delays, Fibre Optic Conduit Placement. Last updated Thu Mar 13 at 2:23 PM PDT. (DBC-73923) |
Highway 28 Both Directions |
Highway 28, in both directions. Bridge maintenance planned at Western Mine Rd (37 km west of Campbell River). Starting Mon Apr 7 at 7:30 AM PDT until Fri May 30 at 7:30 PM PDT. From 7:30 AM to 6:00 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Active working hours 7:30am to 6:00pm. This is a 24hr 7 day a week operation at Buttle Narrows. Last updated Mon Mar 24 at 12:32 PM PDT. (DBC-74354) |
Highway 29 |
Highway 29. Watch for slippery sections between the start of Highway 29 and Peace Canyon Access Rd for 151.5 km (Tumbler Ridge to 6 km south of Hudson's Hope). Compact snow. Last updated Sun Mar 30 at 12:48 AM MST. (DBCRCON-221666) |
Highway 29 |
Highway 29. Utility work between Asleson Rd and Weiland Rd for 4.9 km (Chetwynd). Until Mon Apr 7. From 8:00 AM to 4:00 PM MST on weekdays. Single lane alternating traffic. Southbound lane closure. Watch for traffic control. Last updated Thu Mar 20 at 11:10 AM MST. (DBC-74214) |
Highway 29 |
Highway 29. Utility work planned between N Access Rd and Lakeshore Dr for 26.3 km (Chetwynd). Starting Mon Mar 31 until Wed Apr 30. From 8:00 AM to 4:00 PM MST on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 27 at 4:43 PM MST. (DBC-74565) |
Highway 29 |
Highway 29. Watch for slippery sections between Johnson Creek Rd and Halfway River Bridge for 49.2 km (Hudson's Hope). Last updated Sun Mar 30 at 12:48 AM MST. (DBCRCON-221676) |
Highway 29 Northbound |
Highway 29, northbound. Maintenance between Szoo Rd and Donis Rd for 15.7 km (46 to 61 km north of Hudson's Hope). Until Fri Apr 18. From 7:00 AM to 4:00 PM MST daily. Right lane closed. Expect minor delays. Last updated Thu Mar 13 at 10:18 AM MST. (DBC-73908) |
Highway 29 Both Directions |
Highway 29, in both directions. Road construction work between 283 Rd and Tompkins Frtg for 4.2 km (69 to 73 km north of Hudson's Hope). Until Mon Mar 31 at 6:00 PM MST. Single lane alternating traffic. Emergency vehicles have the right of way. Last updated Thu Mar 6 at 4:29 PM MST. (DBC-73637) |
Highway 3 |
Highway 3 . Maintenance planned at Newton Road 5 km east of Keremeos. Starting Mon Jun 2 at 7:00 AM PST until Fri Jun 6 at 4:00 PM PST. Shoulder will be closed. Work taking place on Newton Road. Last updated Mon Jan 27 at 4:23 PM PST. (DBC-72315) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Construction work planned between Exit 173: Old Hope Princeton Way and the start of Highway 3 (Crowsnest Highway) for 2.0 km (Hope). Starting Mon Mar 31 at 7:00 AM PDT until Mon Mar 31 at 3:00 PM PDT. Pavement patching is planned. Right lane will be closed. Last updated Fri Mar 28 at 8:59 AM PDT. (DBC-74584) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work planned between Ashnola Rd and Hedley-Nickleplate Rd for 6.1 km (9 km west of Keremeos to 12 km east of Hedley). Starting Mon Apr 7 until Fri Apr 11. From 8:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Tue Mar 25 at 10:14 AM PDT. (DBC-74424) |
Highway 3 |
Highway 3 (Crowsnest Highway). There are rocks on the road at Chopaka Rd (18 km east of Keremeos). Rocks in roadway, on highway 3 approximately 3 km east of Chopaka road. Last updated Sat Mar 29 at 3:58 PM PDT. (DBC-73885) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Sat Mar 29 at 4:47 AM PDT. (DBC-73820) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Wilgress Lake Rest Area and Granby Rd for 26.0 km (2 km west of Eholt Summit to Grand Forks). Last updated Sat Mar 29 at 8:49 PM PDT. (DBCRCON-221672) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between 68th Ave and Meadows Rd for 93.5 km (Christina Lake to 10 km west of Salmo). Last updated Sat Mar 29 at 8:49 PM PDT. (DBCRCON-221694) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Sat Mar 29 at 4:47 AM PDT. (DBC-73822) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Tailings Rd and Cook St for 68.9 km (14 km east of Salmo to Creston). Last updated Sat Mar 29 at 8:50 PM PDT. (DBCRCON-221571) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Junction Hwy 6NS and West Creston Rd for 55.4 km (14 km east of Salmo to 10 km west of Creston). Last updated Sat Mar 29 at 3:46 PM PDT. (DBC-73304) |
Highway 3 |
Highway 3 (Crowsnest Highway). Winter driving conditions between Wright Rd and Tavistock St for 41.2 km (5 km west of Curzon Junction to Moyie). Last updated Sat Mar 29 at 4:03 PM PDT. (DBCRCON-221686) |
Highway 3 |
Highway 3 (Crowsnest Highway). Snowing between Sunrise Rd and White Cloud Pit Rd for 69.0 km (Moyie to 9 km west of Jaffray). Last updated Sat Mar 29 at 4:04 PM MDT. (DBCRCON-221659) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road sweeping between Jim Smith Lake Rd and 30th Ave N for 5.7 km (Cranbrook). Until Mon May 5. From 8:00 AM to 3:30 PM MDT daily. Lane closures in both directions in effect. Intermittent closures will take place as crews work. One lane in both directions will be maintained. Last updated Fri Mar 7 at 2:59 PM MDT. (DBC-73673) |
Highway 3 |
Highway 3 (Crowsnest Highway). Winter driving conditions between Riverside Dr and Michel Creek Rd for 32.4 km (Fernie to Sparwood). Slushy sections. Last updated Sat Mar 29 at 5:32 AM MDT. (DBCRCON-221699) |
Highway 3 |
Highway 3 (Crowsnest Highway). Winter driving conditions between Michel Mouth Bridge and BC/AB Border for 17.8 km (Sparwood to British Columbia and Alberta Border). Watch for slippery sections. Compact snow. Snowing. Last updated Sun Mar 30 at 1:06 AM MDT. (DBCRCON-221700) |
Highway 30 |
Highway 30. Utility work between Marble River Rest Area and South Hardy Mainline for 2.0 km (14 to 16 km north of Port Alice). Until Thu May 1 at 7:00 PM PDT. Single lane alternating traffic. Underground Utility Locates & Geophysical Survey Excluding Weekends. Last updated Thu Feb 20 at 9:34 AM PDT. (DBC-73032) |
Highway 31 |
Highway 31. Road maintenance work between Lardeau and Argenta Rd for 6.1 km (10 to 4 km south of Meadow Creek). For the next two weeks. Single lane alternating traffic. Construction work. Last updated Mon Mar 17 at 11:00 AM PDT. (DBC-74050) |
Highway 31 |
Highway 31. Watch for falling rocks between Cascade Creek Mainline and Junction Hwy 23 for 57.5 km (Trout Lake). Last updated Sat Mar 29 at 4:48 AM PDT. (DBC-74515) |
Highway 33 |
Highway 33. Watch for slippery sections between Christian Valley Rd and McCulloch Rd for 76.2 km (Westbridge to 30 km south of Kelowna). Last updated Sat Mar 29 at 8:49 PM PDT. (DBCRCON-221696) |
Highway 33 Northbound |
Highway 33, northbound. Utility work planned between Franklyn Rd and Bryden Rd for 0.3 km (Kelowna). Starting Mon Apr 7 at 9:00 AM PDT until Thu Apr 10 at 3:00 PM PDT. Lane Closure. Last updated Thu Mar 20 at 1:45 PM PDT. (DBC-74223) |
Highway 33 |
Highway 33. Road sweeping planned between Black Mountain Dr and Highway 97 for 6.9 km (Kelowna). Starting Tue Apr 1 at 8:00 PM PDT until Sat Apr 12 at 6:00 AM PDT. Hwy 33 road sweeping. Last updated Thu Mar 27 at 2:20 PM PDT. (DBC-74556) |
Highway 37 |
Highway 37. Frost heaves between Deltaic Cr Bridge and Stikine Bridge for 216.5 km (26 km south of Bell II to 30 km north of Iskut). Last updated Sat Mar 29 at 4:08 PM PDT. (DBCRCON-221691) |
Highway 37 |
Highway 37. Watch for slippery sections between Commercial Dr and Dease River Bridge for 67.9 km (Dease Lake to 46 km south of Jade City). Last updated Sat Mar 29 at 3:47 PM PDT. (DBCRCON-221683) |
Highway 37 |
Highway 37. Watch for slippery sections between Dease River Bridge and the end of Highway 37 for 164.6 km (46 km south of Jade City to British Columbia and Yukon Border). Compact snow. Last updated Sat Mar 29 at 3:47 PM PDT. (DBCRCON-221578) |
Highway 37 |
Highway 37. Stalled vehicle between French Creek Bridge and Blue River Bridge for 0.2 km (31 km south of British Columbia and Yukon Border). For the next half day. Single lane alternating traffic. Next update time Sun Mar 30 at 9:30 AM PDT. Last updated Sat Mar 29 at 9:52 PM PDT. (DBC-74609) |
Highway 3A Both Directions |
Highway 3A, in both directions. Utility work planned between Main St and Stagecoach Rd for 2.5 km (6 to 9 km east of Keremeos). Starting Tue Apr 1 at 7:00 AM PDT until Tue Apr 1 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Speed reduced to 60km/h. Expect delays of 5 to 15 minutes. Last updated Fri Mar 28 at 10:34 AM PDT. (DBC-74591) |
Highway 3A |
Highway 3A. Watch for falling rocks between Kootenay Bay Ferry and Junction Hwy 3 for 78.0 km (1 km north of Kootenay Bay Ferry Landing to Creston). Last updated Sat Mar 29 at 4:47 AM PDT. (DBC-73148) |
Highway 3B |
Highway 3B. Watch for slippery sections between Highway 22 Jct W and Highway 3 Jct W for 28.2 km (Rossland to 8 km north of Nancy Greene Summit). Last updated Sat Mar 29 at 8:49 PM PDT. (DBCRCON-221695) |
Highway 4 Both Directions |
Highway 4, in both directions. Geotechnical investigation planned between Maltby Rd and Radar Hill for 0.7 km (1 km east of Tofino to 1 km east of North Boundary of Pacific Rim National Park in Tofino). Starting Wed Apr 2 at 9:00 AM PST until Wed Apr 2 at 7:00 PM PST. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Environmental Soil Sampling - watch for work crews and speed reduction. Last updated Wed Mar 5 at 2:26 PM PST. (DBC-73588) |
Highway 4 Both Directions |
Highway 4, in both directions. Utility work between Tofino-Ucluelet Hwy and Thunderous Bridge for 0.2 km (1 km east of Southern Boundary of Pacific Rim National Park). Until Mon Mar 31 at 5:00 PM PST. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Digital Message Board Install - watch for work crews and traffic Pattern change. Last updated Fri Feb 28 at 11:45 AM PST. (DBC-73386) |
Highway 4 |
Highway 4. Heavy rain between Sutton Pass Summit and the end of Highway 4 for 85.5 km (2 km west of Sutton Pass Summit to Qualicum Beach). Last updated Fri Mar 28 at 2:34 PM PDT. (DBCRCON-221614) |
Highway 4 Westbound |
Highway 4, westbound. Utility work planned between Tsuma-As Dr and Hector Rd for 0.2 km (1 km west of Port Alberni). Starting Thu Apr 3 until Thu Apr 3 at 2:00 AM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility work - BC HYDRO pole transfer. Night work. Watch for work crews. Last updated Thu Mar 27 at 6:43 PM PDT. (DBC-74572) |
Highway 4 Both Directions |
Highway 4, in both directions. Construction work between Elizabeth St and Helen St for 0.2 km (Port Alberni). Until Thu May 1 at 5:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - watch for work crews. Last updated Tue Mar 25 at 8:32 AM PDT. (DBC-74413) |
Highway 4 Both Directions |
Highway 4, in both directions. Bridge maintenance between Tofino-Ucluelet Hwy and John St for 93.3 km (Port Alberni to 1 km east of Southern Boundary of Pacific Rim National Park). Until Fri Apr 4 at 4:00 PM PST. Lane Closure. Watch for traffic control. Bridge washing in various locations. Last updated Wed Mar 5 at 3:16 PM PST. (DBC-73594) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Wed Apr 2 at 10:00 AM PST. Last updated Thu Jan 2 at 9:53 AM PST. (DBC-52953) |
Highway 43 |
Highway 43. Winter driving conditions between the start of Highway 43 and Alpine Way for 33.7 km (Sparwood to Elkford). Slushy sections. Last updated Sat Mar 29 at 5:32 AM MDT. (DBCRCON-221655) |
Highway 4A Both Directions |
Highway 4A, in both directions. Utility work planned between Virginia Rd and Bonell Rd for 1.3 km (6 to 5 km west of Parksville). Starting Mon Apr 7 at 9:00 AM PDT until Fri Apr 11 at 3:00 PM PDT. Shoulder will be closed. Expect minor delays. Watch for traffic control personnel. Utility Work - Pole transfer. Watch for work crews. Last updated Mon Mar 24 at 8:49 AM PDT. (DBC-74342) |
Highway 4A Both Directions |
Highway 4A, in both directions. Utility work between the start of Highway 4A and Fairdowne Rd for 7.5 km (2 to 9 km west of Parksville). Until Fri Apr 4 at 3:00 PM PDT. Shoulder closed. Expect minor delays. Watch for traffic control. Utility Work - Pole Cable transfers. Watch for work crews. Last updated Mon Mar 10 at 3:51 PM PDT. (DBC-73762) |
Highway 5 |
Highway 5 (Coquihalla South). Watch for slippery sections between Exit 286: Merritt - 97C and Exit 336: Walloper Interchange for 49.9 km (Merritt to 14 km north of Surrey Lake Summit). Last updated Sat Mar 29 at 8:48 PM PDT. (DBCRCON-221692) |
Highway 5 Southbound |
Highway 5, southbound. Utility work between Holland Rd and Lost Creek Rd for 3.7 km (3 to 7 km north of Clearwater). Until Fri Apr 4. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Thu Mar 13 at 4:03 PM PDT. (DBC-73936) |
Highway 5 Southbound |
Highway 5, southbound. Utility work planned between Holland Rd and Lost Creek Rd for 3.7 km (3 to 7 km north of Clearwater). Starting Mon Apr 28 until Thu May 15. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 13 at 4:25 PM PDT. (DBC-73940) |
Highway 52 E |
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4 km (Tumbler Ridge). Compact snow. Last updated Sun Mar 30 at 12:48 AM MST. (DBCRCON-221667) |
Highway 52 N |
Highway 52 N (Heritage Highway). Watch for slippery sections between 200 Rd and the end of Highway 52 N (Heritage Highway) for 81.7 km (Tumbler Ridge). Compact snow. Last updated Sun Mar 30 at 12:48 AM MST. (DBCRCON-221668) |
Highway 5A |
Highway 5A. Construction work planned between Long Lake Rd and Old Stage Coach Rd (22 km south of Kamloops). Starting Tue Apr 1 at 8:00 AM PDT until Fri Apr 4 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Mon Mar 17 at 9:36 AM PDT. (DBC-74040) |
Highway 6 EW |
Highway 6 EW. Watch for slippery sections between North Fork Rd and Monashee Summit for 42.1 km (Cherryville to Monashee Summit). Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221684) |
Highway 6 NS Both Directions |
Highway 6 NS, in both directions. Watch for falling rocks between Summit Lake Rd and Memphis Creek for 50.2 km (7 km north of Slocan to Summit Lake). Last updated Sat Mar 29 at 4:48 AM PDT. (DBC-73130) |
Highway 7 Both Directions |
Highway 7, in both directions. Utility work planned between King Edward St and Schoolhouse St for 0.7 km (Coquitlam). Starting Mon Apr 7 at 9:00 AM PDT until Mon Apr 7 at 3:00 PM PDT. Left turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Last updated Mon Mar 24 at 1:08 PM PDT. (DBC-74358) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Highway 7 westbound right turn onto 272nd St is closed. Detour via turnaround at 265th St. Expect intermittent delays. Single lane alternating traffic on 272nd St as required. Next update time Sat Apr 12 at 5:00 PM PDT. Last updated Wed Mar 19 at 10:01 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work planned between Wren St and Hurd St for 0.7 km (Mission). Starting Wed Apr 2 until Thu Apr 3. From 9:00 AM to 3:00 PM PDT on Wednesday and Thursday. Lane closures in both directions planned. Last updated Mon Mar 17 at 1:27 PM PDT. (DBC-74058) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Hawkins Pickle Rd and McIntyre Rd for 0.4 km (3 km east of Mission). Until Mon Mar 31 at 3:00 PM PST. Watch for traffic control. Last updated Thu Feb 27 at 3:20 PM PST. (DBC-73345) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work planned between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Starting Tue Apr 1 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. Watch for traffic control personnel. Last updated Fri Mar 28 at 4:12 PM PDT. (DBC-74614) |
Highway 7 |
Highway 7 (Lougheed Highway). Road sweeping between Harrison Bay Rd and Kennedy Rd for 5.7 km (Kent). Single lane alternating traffic. Sweeping taking place on Highway 7 from Harrison Bay store to Sasquatch in then to Morris Valley rd. Please watch for slow moving vehicles. Last updated Wed Mar 26 at 8:07 AM PDT. (DBC-74465) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road sweeping between Scowlitz Access Rd and Highlands Blvd for 8.6 km (Kent). Single lane alternating traffic. Expect delays. Watch for traffic control and sweeper working. Last updated Tue Mar 25 at 7:05 AM PDT. (DBC-74407) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Bridge maintenance between Seabird Island Rd and Ruby Creek Rd for 15.0 km (Kent). Lane Closure. Watch for traffic control. Last updated Tue Mar 25 at 7:23 AM PDT. (DBC-74408) |
Highway 7B Eastbound |
Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617) |
Highway 7B Both Directions |
Highway 7B (Mary Hill Bypass), in both directions. Construction work planned at Kingsway Ave (Port Coquitlam). Starting Fri Apr 4 at 8:00 PM PDT until Sat Apr 5 at 2:00 PM PDT. Lane closures in both directions planned. Bus stop improvement project. Last updated Thu Mar 27 at 9:50 AM PDT. (DBC-74539) |
Highway 8 |
Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). Last updated Sat Mar 29 at 4:49 AM PDT. (DBC-72877) |
Highway 8 |
Highway 8. Road construction work between the start of Highway 8 and Porcupine Ridge Rd for 1.0 km (8 to 9 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Mon Apr 28 at 5:00 PM PDT. Last updated Fri Mar 28 at 12:54 PM PDT. (DBC-73833) |
Highway 8 |
Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.5 km (12 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Mon Apr 28. Last updated Fri Mar 28 at 12:53 PM PDT. (DBC-74599) |
Highway 8 |
Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Mon Apr 28. Last updated Fri Mar 28 at 12:48 PM PDT. (DBC-74597) |
Highway 8 |
Highway 8. Road construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 to 18 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Expect delays. Watch for traffic control. Next update time Mon Apr 28 at 5:00 PM PDT. Last updated Fri Mar 28 at 11:59 AM PDT. (DBC-73832) |
Highway 8 |
Highway 8. Construction work planned between Porcupine Ridge Rd and 14 Mile Ranch Rd (18 km east of Spences Bridge). Starting Thu Apr 3 at 7:00 AM PDT until Fri Apr 4 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 27 at 7:21 AM PDT. (DBC-74524) |
Highway 8 |
Highway 8. Construction work planned at 14 Mile Ranch Rd (19 km east of Spences Bridge). Starting Tue Apr 1 at 7:00 AM PDT until Wed Apr 2 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 27 at 7:19 AM PDT. (DBC-74523) |
Highway 8 |
Highway 8. Construction work between Shackan IR and Dot Ranch Cut-Off Rd East for 0.8 km (21 to 22 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Mon Apr 28. Last updated Fri Mar 28 at 12:00 PM PDT. (DBC-74592) |
Highway 91A Both Directions |
Highway 91A, in both directions. Bridge maintenance planned between Boundary Rd and Howes St for 0.2 km (Richmond to New Westminster). Starting Mon Mar 31 at 10:00 PM PDT until Thu Apr 3 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Right lane will be blocked. Expect delays. Look out for crews working in Slow Lane. Follow signs and drive to conditions. Last updated Thu Mar 20 at 6:35 PM PDT. (DBC-74239) |
Highway 93 |
Highway 93. Snowing between Back Rd and Wasa Junction for 31.5 km (7 km south of Fort Steele to 3 km north of Wasa). Last updated Sat Mar 29 at 4:04 PM MDT. (DBCRCON-221660) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Speed reduced to 50km/h. Single lane alternating traffic from 9:00am to 3:00pm on March 18. Last updated Mon Mar 17 at 1:58 PM MDT. (DBC-73931) |
Highway 93 |
Highway 93. Watch for slippery sections between Stanley St and Simpson River Trail for 58.0 km (Radium Hot Springs to 36 km south of British Columbia and Alberta Border). Compact snow. Last updated Sun Mar 30 at 1:10 AM MDT. (DBCRCON-221697) |
Highway 93 |
Highway 93. Compact snow between Simpson River Trail and the end of Highway 93 for 36.3 km (British Columbia and Alberta Border). Slushy with slippery sections. Snowing. Last updated Sun Mar 30 at 1:10 AM MDT. (DBCRCON-221698) |
Highway 95 Both Directions |
Highway 95, in both directions. Utility work between Green Rd and S Skookumchuck Rd. Until Wed Apr 2. From 7:00 AM to 5:00 PM MDT daily. Watch for traffic control. Expect delays. Speed reduced to 60 km/h. Next update time Wed Apr 2 at 5:00 PM MDT. Last updated Wed Feb 26 at 6:37 PM MDT. (DBC-73280) |
Highway 95 |
Highway 95. Winter driving conditions between BC/US Border and Sinclair Creek Loop Rd for 11.2 km (Kingsgate to Curzon Junction). Last updated Sat Mar 29 at 4:03 PM PDT. (DBCRCON-221687) |
Highway 95A |
Highway 95A. Snowing between the start of Highway 95A and Wasa Junction for 55.5 km (Cranbrook to 27 km north of Kimberley). Last updated Sat Mar 29 at 4:04 PM MDT. (DBCRCON-221661) |
Highway 97 Southbound |
Highway 97, southbound. Road construction work between Sandhill Rd and Pineview Dr (1 km south of Penticton). Until Fri Oct 24. Lane Closure. Shoulder closed. Industrial traffic may slow or block regular traffic. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Tue Jan 14 at 9:05 PM PST. (DBC-71783) |
Highway 97 |
Highway 97. Maintenance between Burnaby Ave W and Wharf St for 3.4 km (3 km south of Summerland to 1 km north of Penticton). Until Fri Apr 4. Lane Closure. Expect minor delays. Rest area closed. Watch for traffic control. 24 hours a day, 7 days a week. Pull out/ rest area will be closed for the duration of the project.
Wide loads limit - Maximum 12 feet. Last updated Mon Mar 24 at 11:46 AM PDT. (DBC-73590) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge maintenance planned between William R Bennett Bridge and Abbott St for 1.0 km (Kelowna). Starting Sun Mar 30 at 9:00 PM PDT until Fri Apr 4 at 4:00 AM PDT. From 9:00 PM to 4:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Last updated Fri Mar 28 at 12:05 PM PDT. (DBC-74595) |
Highway 97 |
Highway 97. Road sweeping planned between Abbott St and Edwards Rd for 10.7 km (Kelowna). Starting Tue Apr 1 at 8:00 PM PDT until Sat Apr 12 at 6:00 AM PDT. Hwy 97 road sweeping between Edwards Rd and Abbott Street. Last updated Thu Mar 27 at 2:24 PM PDT. (DBC-74558) |
Highway 97 |
Highway 97. Road sweeping between Crystal Waters Rd and Clerke Rd for 12.1 km (Coldstream). Until Thu Apr 3. From 7:00 AM to 3:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Watch for slow moving equipment and shadow vehicles. Slow down and move over. Last updated Thu Mar 20 at 9:15 AM PDT. (DBC-74201) |
Highway 97 |
Highway 97. Road sweeping between Highland Rd and Monte Creek for 80.1 km (6 km north of Vernon to Monte Creek). Until Mon Apr 28. 24 hours a day. Watch for slow moving equipment and shadow vehicles. Last updated Wed Mar 19 at 11:15 AM PDT. (DBC-73461) |
Highway 97 |
Highway 97. Water pooling between Grandview Flats Rd N and Monte Creek for 69.5 km (17 km north of Vernon to Monte Creek). Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221685) |
Highway 97 |
Highway 97 (Cariboo Connector). Limited visibility with fog between Stephenson Rd and North Bonaparte Rd for 71.4 km (70 Mile House to Cache Creek). Last updated Sat Mar 29 at 10:11 PM PDT. (DBC-74476) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Maintenance between MacKenzie Ave S and Toop Rd for 2.1 km (Williams Lake). Until Thu Apr 17. From 2:30 PM to 11:00 PM PDT on weekdays. Right lane is closed in both directions. Boulevard Cleaning. Please watch for signage and personnel. Right lane shoulder closures in both North and Southbound directions. Last updated Fri Mar 21 at 11:25 AM PDT. (DBC-74271) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Shoulder maintenance between Lakeview Cres and Donald Rd for 0.7 km (Williams Lake). Until Wed Apr 30. From 6:00 AM to 7:00 PM PDT on weekdays. Intersection open to traffic. Expect delays. Please watch for signage and personnel. Last updated Mon Mar 24 at 1:27 PM PDT. (DBC-74362) |
Highway 97 |
Highway 97 (Cariboo Connector). Slushy with slippery sections between Kragbak Rd and Lavally Rd for 44.0 km (8 km north of Wildwood to 47 km south of Quesnel). Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221615) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work planned between Cinema Rd and Naver Creek Rd for 6.8 km (15 to 22 km south of Hixon). Starting Mon Apr 7 at 8:00 AM PDT until Fri Apr 18 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Please watch for signs and personnel. Last updated Thu Mar 27 at 8:49 AM PDT. (DBC-74532) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Utility work between Stoner Pit Rd and Pine Centre Rd for 34.6 km (22 km south of Pineview to Prince George). Until Mon Mar 31 at 5:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon Mar 10 at 1:07 PM PDT. (DBC-73751) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Last updated Fri Dec 27 at 8:11 AM PST. (DBC-71474) |
Highway 97 Northbound |
Highway 97, northbound. Utility work planned between McLeod Rd and Beale Rd for 3.5 km (16 to 12 km north of Prince George). Starting Wed Apr 9 at 10:00 AM PDT until Wed Apr 9 at 4:00 PM PDT. Lane Closure. Watch for traffic control personnel. Last updated Wed Mar 26 at 11:56 AM PDT. (DBC-74484) |
Highway 97 Both Directions |
Highway 97, in both directions. Utility work between Summit Lake Rd and Grizzly Ave for 22.8 km (34 to 57 km north of Prince George). Until Fri Apr 11 at 4:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Tue Mar 18 at 1:19 PM PDT. (DBC-74103) |
Highway 97 |
Highway 97. Watch for slippery sections between Tudyah Lake Provincial Pk and Weiland Rd for 149.0 km (15 km north of McLeod Lake to Chetwynd). Last updated Sun Mar 30 at 12:48 AM PDT. (DBCRCON-221669) |
Highway 97 Southbound |
Highway 97, southbound. Bridge construction between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 km south of Chetwynd). Until Mon Jun 30. Expect minor delays. Watch for crews and equipment working along the side of the road. Last updated Wed Mar 12 at 2:49 PM MST. (DBC-73850) |
Highway 97 |
Highway 97. Watch for slippery sections between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Last updated Sun Mar 30 at 12:48 AM MST. (DBCRCON-221670) |
Highway 97 Southbound |
Highway 97 (Alaska Highway), southbound. Construction work between 271 Rd and 100 Ave for 3.9 km (Fort St John). Until Mon Mar 31. From 8:00 AM to 6:00 PM MST daily. Electrical maintenance. Watch for traffic control. Last updated Wed Feb 26 at 2:53 PM MST. (DBC-72400) |
Highway 97A |
Highway 97A. There is debris on the road between Hutchison Rd and the end of Highway 97A for 16.3 km (Sicamous). Watch for falling ice. Watch for falling rocks. Watch for falling ice and rocks debris on road. Last updated Tue Mar 4 at 6:36 AM PST. (DBC-73284) |
Highway 97A Both Directions |
Highway 97A, in both directions. Watch for falling rocks between Swansea Point Rd and the end of Highway 97A for 9.4 km (Sicamous). There is debris on the road. Last updated Sat Mar 29 at 3:59 PM PDT. (DBC-73568) |
Highway 97B |
Highway 97B. Road sweeping between Gardiner Lake Frtg and the end of Highway 97B for 5.5 km (Salmon Arm). Until Thu Apr 10. From 7:00 AM to 3:30 PM PDT daily. Watch for slow moving equipment and shadow vehicles. When passing, slow down to max 70km/h and move over, YIELD to oncoming traffic. Last updated Mon Mar 24 at 11:01 AM PDT. (DBC-74352) |
Highway 97C |
Highway 97C. Utility work planned between Eight Mile Rd and Junction Hwy 97D for 2.0 km (58 to 60 km south of Ashcroft). Starting Sun Mar 30 at 7:00 AM PDT until Sun Mar 30 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 20 at 10:29 AM PDT. (DBC-74209) |
Highway 97C |
Highway 97C. Watch for falling rocks between Merritt and Landon Rd for 58.1 km (38 to 96 km south of Ashcroft). Last updated Sat Mar 29 at 4:49 AM PDT. (DBC-73139) |
Highway 97C |
Highway 97C. Utility work planned between Railway Ave and Brink St for 0.1 km (Ashcroft). Starting Tue Apr 1 until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Shoulder will be closed. Expect delays of up to 5 minutes. No work taking place on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:07 AM PDT. (DBC-74586) |
Highway 97C |
Highway 97C. Utility work planned between Brink St and Government St for 0.3 km (Ashcroft). Starting Tue Apr 1 until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:12 AM PDT. (DBC-74588) |
Highway 97C |
Highway 97C. Utility work planned between Government St and Empter Frontage Rd for 5.9 km (Ashcroft). Starting Tue Apr 1 until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:31 AM PDT. (DBC-74590) |
Highway 99 Westbound |
Highway 99, westbound. Utility work between Cayoosh Park rd and Ainsworth rd 1 km south of Lillooet. Until Mon Apr 14. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Mar 27 at 9:42 AM PDT. (DBC-74536) |
Highway 99 Northbound |
Highway 99, northbound. Utility work between Exit 20 and 72 St for 4.1 km (Delta). Until Mon Mar 31. From 12:00 AM to 12:00 AM PDT daily. Lane Closure. The bus lane will be closed. Last updated Fri Feb 28 at 2:25 PM PDT. (DBC-73395) |
Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT daily. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Last updated Fri Mar 28 at 7:18 AM PDT. (DBC-74159) |
Highway 99 Southbound |
Highway 99, southbound. Geotechnical investigation between Exit 28 and Exit 26 for 2.5 km (Delta). Until Fri Apr 4 at 5:30 AM PDT. Left lane is blocked. Last updated Fri Mar 28 at 5:17 PM PDT. (DBC-74619) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Mon Mar 31 at 10:00 PM PDT until Thu Apr 10 at 5:00 AM PDT. Right lane of exit ramp will be closed. NB road closure with detour via off/on ramps, April 5th, 8th and 9th, from 11 PM to 4:30 AM. Last updated Fri Mar 28 at 5:34 PM PDT. (DBC-74381) |
Highway 99 Southbound |
Highway 99, southbound. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Fri Apr 4 at 10:00 PM PDT until Thu Apr 10 at 5:30 AM PDT. Right lane of exit ramp will be closed. SB road closure with detour via off/on ramps, April 5th, 8th and 9th, from 11 PM to 4:30 AM. Last updated Fri Mar 28 at 5:35 PM PDT. (DBC-74383) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between W Pender St and Lions Gate Bridge for 3.3 km (West Vancouver to Vancouver). Starting Sun Apr 27 at 7:00 AM PDT until Sun Apr 27 at 11:30 AM PDT. Expect delays due to congestion. Lane Closure. VancouverSunRun.Com for additional information. Last updated Mon Mar 17 at 10:21 AM PDT. (DBC-74046) |
Highway 99 Northbound |
Highway 99, northbound. Electrical maintenance planned between Scott Cres and Cleveland Ave (Squamish). Starting Mon Apr 7 until Fri May 2. Right turn lane will be closed. Shoulder will be closed. Next update time Fri May 2 at 6:00 AM PDT. Last updated Fri Mar 28 at 1:34 PM PDT. (DBC-74602) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Scott Cres and Cleveland Ave (Squamish). Starting Fri May 2 until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane will be closed. Shoulder will be closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Lorimer Rd and Blackcomb Way for 1.3 km (Whistler). Starting Mon Apr 7 until Fri Apr 11. From 9:00 AM to 3:00 PM PDT daily. Last updated Fri Mar 14 at 5:37 PM PDT. (DBC-73993) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 |
Highway 99. Utility work between Davis Rd and E Lillooet Rd for 0.6 km (Lillooet). Until Mon Apr 7. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Mar 19 at 9:35 AM PDT. (DBC-74147) |
Highway 99 |
Highway 99. Utility work between Smith Rd and Marble Canyon Provincial Pk for 5.6 km (37 to 43 km north of Lillooet). Until Mon Mar 31. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Mon Mar 10 at 2:06 PM PDT. (DBC-73756) |
Kootenay Lake Ferry |
Kootenay Lake Ferry. Travel advisory in effect between Balfour and Kootenay Bay. Kootenay Lake Ferry on regular winter schedule. Expect delays or short-notice sailing cancellations due to crewing issues. Next update time Mon Mar 31 at 9:00 AM PDT. Last updated Fri Mar 28 at 8:12 AM PDT. (DBC-74174) |
Morris Valley Rd Both Directions |
Morris Valley Rd, in both directions. Construction work at Chehalis Rd. Until Thu Apr 24. From 6:00 AM to 7:00 PM PDT daily. Intermittent single lane alternating traffic. Lane shift and speed reduction 24/7. Last updated Mon Mar 17 at 1:40 PM PDT. (DBC-73186) |
Nazko Rd |
Nazko Rd. Watch for slippery sections between Bluestone Rd and Baezaeko Rd for 67.3 km (75 to 8 km east of Nazko). Compact snow. Last updated Sun Mar 30 at 12:47 AM PDT. (DBCRCON-221604) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed Jul 2 at 10:00 AM MST. Last updated Thu Jan 2 at 11:37 AM MST. (DBC-30093) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Mar 31 at 10:00 AM PST. Last updated Fri Jan 31 at 10:56 AM PST. (DBC-35978) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. No work April 18th to April 20th. Next update time Mon Jun 30 at 9:00 AM PDT. Last updated Sat Mar 29 at 9:29 AM PDT. (DBC-68621) |
Other Roads Both Directions |
Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Expect delays. Partial road washout, obey signage. Next update time Thu Apr 17 at 8:00 AM PDT. Last updated Mon Mar 17 at 11:53 AM PDT. (DBC-71008) |
Other Roads Both Directions |
Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Night Work from 8:00pm to 5:30am, Construction work between Highway 1 and Highway 17 near Victoria. Expect delays and traffic interruptions on Hwy 1, Hwy 17, Ravine Way and Carey Rd both directions. Construction zone in effect 24/7. Last updated Fri Mar 21 at 1:10 PM PDT. (DBC-71339) |
Other Roads Eastbound |
Dollarton Highway, eastbound. Utility work between Highway 1 and Dollarton Bridge in North Vancouver - City. Until Wed Apr 30. From 7:00 AM to 8:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Wed Mar 12 at 1:42 PM PDT. (DBC-72344) |
Other Roads Both Directions |
Fairbanks Rd, in both directions. Utility work between 1110 Fairbanks Rd and 1108 Fairbanks Rd. Until Tue Apr 22 at 5:00 PM PST. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility Work - Pipe installation. Watch for work crews. Last updated Mon Feb 24 at 11:59 AM PST. (DBC-73197) |
Other Roads Both Directions |
Lamarque Rd, in both directions. Construction work between Swanson Rd and Smith Rd. Until Mon Mar 31 at 9:00 PM PST. Road closed for repairs. Culvert Washout - assessment in progress. Last updated Tue Feb 25 at 4:24 PM PST. (DBC-73250) |
Other Roads |
Coleman Road. Construction work at Bates Road in Courtenay. Until Mon Mar 31 at 5:00 PM PST. Single lane alternating traffic. Watch for traffic control. Expect delays. Coleman and Bates road intersection realignment. Last updated Wed Feb 26 at 11:39 AM PST. (DBC-73274) |
Other Roads Westbound |
University Blvd, westbound. Road maintenance work planned between Blanca St and Acadia Rd 1 km north of Vancouver. Starting Sun Mar 30 at 7:00 AM PST until Sun Mar 30 at 4:00 PM PST. Road closure planned. Watch for traffic control personnel. Last updated Fri Mar 7 at 6:14 AM PST. (DBC-73631) |
Other Roads Both Directions |
Pacific Marine Rd, in both directions. Geotechnical investigation between Hemmingsen Rd and Lens Rd near Port Renfrew. Until Mon Mar 31. From 6:00 AM to 6:00 PM PDT daily. Right turn lane closed. Watch for traffic control. Last updated Mon Mar 10 at 9:36 AM PDT. (DBC-73738) |
Other Roads |
Christensen Road. Utility work between Marten Road and Nagwuntloo Street. Until Fri Apr 4. From 8:00 AM to 4:00 PM PDT daily. Please watch for signage and personnel. Last updated Mon Mar 10 at 1:32 PM PDT. (DBC-73754) |
Other Roads Eastbound |
Moray Bridge , eastbound. Bridge maintenance between River Road and Airport Road in Richmond. Until Fri Apr 4 at 4:30 PM PDT. From 6:30 AM to 4:30 PM PDT on weekdays. Lane Closure. Last updated Thu Mar 20 at 8:44 AM PDT. (DBC-73757) |
Other Roads Both Directions |
Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. WATERMAIN INSTALL - Watch for work crews. Last updated Tue Mar 18 at 11:57 AM PDT. (DBC-73760) |
Other Roads Northbound |
Port Washington Rd, northbound. Utility work planned between Upper Terrace and Otter Bay Rd. Starting Tue Apr 1 until Thu Apr 17 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Closure will also take place from June 23rd to June 27th, 2025. Last updated Wed Mar 12 at 9:02 AM PDT. (DBC-73831) |
Other Roads Both Directions |
Highway 18 / Youbou Rd, in both directions. Utility work between Indian Rd and N Shore Rd in Lake Cowichan. Until Tue Apr 15. From 8:30 AM to 6:00 PM PDT daily. Shoulder maintenance. Single lane alternating traffic. Last updated Fri Mar 28 at 9:46 AM PDT. (DBC-74161) |
Other Roads Both Directions |
Othello Road, in both directions. Construction work between Tunnels Road and Highway 5 (Exit 183). Until Fri May 2. From 6:00 AM to 7:00 PM PDT daily. Expect delays. Othello Road MoTT Project. Last updated Thu Mar 20 at 3:18 PM PDT. (DBC-74227) |
Other Roads Eastbound |
East Sooke Rd , eastbound. Utility work planned between Sutiacum Rd and Beecher Bay 1 km north of Sooke. Starting Tue Apr 15 until Thu Apr 17. From 9:00 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Shoulder will be closed. Watch for traffic control personnel. Next update time Thu Apr 17 at 3:00 PM PDT. Last updated Mon Mar 24 at 10:56 AM PDT. (DBC-74351) |
Other Roads Eastbound |
Cypress Bowl Road, eastbound. Utility work planned between Eagle Lake Access Rd and West Vancouver Public Works Yard in West Vancouver. Starting Wed Apr 2 at 7:00 AM PDT until Fri Apr 4 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Wednesday, Thursday and Friday. Lane Closure. Shoulder will be closed. Last updated Tue Mar 25 at 4:44 PM PDT. (DBC-74444) |
Other Roads Both Directions |
Old Hope Princeton Way, in both directions. Utility work planned between Highway 3 and 7 Ave in Hope. Starting Sun Apr 6 until Wed Apr 9. From 8:00 AM to 4:00 PM PDT on Sunday, Monday, Tuesday and Wednesday. Traffic will be held intermittently. Last updated Fri Mar 28 at 1:35 PM PDT. (DBC-74603) |
Other Roads Both Directions |
Mission Mountain Road, in both directions. Muddy sections between Mission Dam and Shalalth Cut Off near Lillooet. Last updated Sat Mar 29 at 10:11 PM PDT. (DBC-74628) |
Telegraph Creek Rd |
Telegraph Creek Rd (Highway 51). Muddy sections between Stikine Ave and Riverview Dr for 56.6 km (Telegraph Creek to 51 km west of Dease Lake). Last updated Sat Mar 29 at 3:57 PM PDT. (DBCRCON-221605) |
Telegraph Creek Rd |
Telegraph Creek Rd (Highway 51). Rest area closed at Burnt Trailer/Tanzilla Acc (51 km west of Dease Lake). E Hok E Edak An (The Burn) Rest Area closed for repairs. Next update time Mon Mar 31 at 3:00 PM PDT. Last updated Mon Mar 24 at 8:17 AM PDT. (DBC-73948) |
Toby Creek Rd Both Directions |
Toby Creek Rd, in both directions. Frost heaves between Panorama Dr and Panorama Dr; Westside Rd for 17.5 km (Invermere to Panorama Mountain Resort). Watch for falling rocks. Next update time Mon Mar 31 at 7:00 AM MST. Last updated Mon Mar 3 at 6:05 AM MST. (DBC-73314) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712) |
Usk Ferry |
Usk Ferry. Seasonal shutdown between Usk Ferry and the end of Usk Ferry (Usk). Cable Car in service. Last updated Mon Dec 16 at 9:15 AM PST. (DBC-71149) |