| Highway 1 Both directions |
Construction on Vicars Road, Kamloops 10:00 pm to 6:00 am daily starting May 21 through May 22. Expect minor delays. Use detours as posted. Updated on Thu May 16 at 10:56 am PDT. (ID# -41034) |
| Highway 5 Both directions |
Watch for fallen rocks at Coquihalla Summit (1244 metres). Updated on Fri May 17 at 11:30 pm PDT. (ID# 151791) |
| Highway 5 Southbound |
Construction at Exit 355, Inks Lake 7:00 am to 6:00 pm Mon-Sat starting May 21 through May 31. Milling and paving starting at Inks Lake Road. 24 hour lane closure will be in effect. 60 km an hour speed zone in effect during work hours. Updated on Fri May 17 at 1:37 pm PDT. (ID# -41071) |
| Highway 5A Both directions |
Watch for fallen rocks from Gulliford Lake Rest Area to Junction with Highway 97C - Aspen Grove (23.4 km). Updated on Fri May 17 at 11:30 pm PDT. (ID# 151816) |
| Highway 5A Both directions |
Watch for fallen rocks from Merritt to Stump Lake Ranch (57.1 km). Updated on Fri May 17 at 11:29 pm PDT. (ID# 151771) |
| Highway 8 Both directions |
Watch for fallen rocks from Exit 286, Junction with Highway 5, in Merritt to Dot Ranch Cutoff Road - East (33.5 km). Updated on Fri May 17 at 11:29 pm PDT. (ID# 151772) |
| Highway 8 Both directions |
Bridge Construction 3.5 km east of Junction with Highway 1, in Spences Bridge through Mon Jun 24 at 11:59 pm. The road is reduced to single lane alternating traffic with up to 20 minutes delay. Updated on Fri May 3 at 11:46 am PDT. (ID# -40587) |
| Lytton Ferry Both directions |
Ferry Out of Service at Fraser River Until Further Notice due to high water levels. Updated on Fri May 17 at 11:44 pm PDT. (ID# 152819) |
| McLure Ferry Both directions |
Closed in both directions at North Thompson River because of high water levels, until further notice. Updated on Fri May 17 at 11:44 pm PDT. (ID# 152851) |