Other Roads Both Directions |
Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Sat Jun 15 at 2:00 PM PDT. Last updated Fri Mar 15 at 3:25 PM PDT. (DBC-16911) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 2 at 2:00 PM PDT. Last updated Wed Mar 27 at 2:27 PM PDT. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Fri Apr 19 at 2:00 PM PST. Last updated Tue Jan 30 at 11:53 PM PST. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Tue Apr 2 at 2:00 PM PDT. Last updated Wed Mar 27 at 2:27 PM PDT. (DBC-28386) |
Other Roads |
Allenby Road. Mudslide between Miller Road and Boys Road. Road closed. Assessment in progress. Alternate routes available. Next update time Sun Jun 2 at 3:00 PM PST. Last updated Thu Jan 25 at 11:11 PM PST. (DBC-35173) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 10 at 2:00 PM PST. Last updated Thu Jan 25 at 11:10 PM PST. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 4 at 2:00 PM PST. Last updated Thu Jan 4 at 3:11 PM PST. (DBC-53013) |
Other Roads Both Directions |
Keating Cross Road, in both directions. Construction work at Barbara Drive. Exit ramp is closed. Access to Barbara Drive from Keating Cross Road to be permanently closed for the construction of the Keating Crossroad Flyover. Next update time Mon Jul 1. Last updated Thu Jan 25 at 11:14 PM PST. (DBC-54341) |
Other Roads Both Directions |
Peninsula Road, in both directions. Road construction work between Seaplane Base Road and Bay Street. Until Fri May 31 at 7:00 PM PST. Watch for traffic control. Single lane alternating traffic. Expect major delays. Next update time Fri May 31 at 7:00 PM PST. Last updated Fri Feb 16 at 3:50 PM PST. (DBC-60822) |
Other Roads Westbound |
Old Hope Princeton Hwy, westbound. Utility work planned between 6th Ave and 7th Ave in Hope. Starting Mon Apr 15 until Fri Apr 19. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed. Watch for traffic control personnel. Expect delays. Next update time Fri Apr 19 at 4:00 PM PDT. Last updated Mon Mar 25 at 1:49 PM PDT. (DBC-62023) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed May 1 at 1:30 PM MST. Last updated Tue Mar 26 at 3:13 PM MST. (DBC-30093) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Penticton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Tue Apr 9 at 3:00 PM PDT. Last updated Thu Mar 21 at 2:37 PM PDT. (DBC-35978) |
Other Roads Both Directions |
Phibbs Exchange, in both directions. Construction work at the vicinity of Phibbs Exchange until Spring 2024. Sidewalk users should expect sidewalk closures and detours throughout the duration of the project. Last updated Wed Feb 15 at 7:24 PM PST. (DBC-46374) |
Other Roads Southbound |
Keating Cross Rd, southbound. Construction work at Highway 17 On Ramp. Until Mon Jun 3. Entrance ramp closed. Detour in effect. Detour required to access Highway 17. Last updated Wed Mar 27 at 7:07 PM PDT. (DBC-52617) |
Other Roads |
Martindale Rd. Construction work at Highway 17 On Ramp. Until Sat Jun 8. Entrance ramp closed. Access to Martindale Rd from Highway 17 will be permanently closed. Access to Martindale Rd from Gliddon Road will remain open. Last updated Wed Mar 27 at 7:07 PM PDT. (DBC-52618) |
Other Roads Both Directions |
North Road on Gabriola Island, in both directions. Paving operations between Lockinvar Lane and Tin Can Alley. Until Fri Mar 29 at 4:00 PM PST. Single lane alternating traffic. Shoulder closed. Expect minor delays. North Road Pavement Sidewalk upgrade. Please watch for traffic control persons. Last updated Mon Feb 12 at 2:26 PM PST. (DBC-60668) |
Other Roads Southbound |
Daly Ave, southbound. Utility work planned between Mascot Ave and Highway 3. Starting Mon Apr 15 until Fri Apr 19. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Wed Mar 27 at 2:43 PM PDT. (DBC-61064) |
Other Roads Both Directions |
Canal Rd, in both directions. Geotechnical investigation at Mt Norman Access Rd. Single lane alternating traffic. Watch for traffic control. Expect delays. March 22nd - 23rd expect minor delays. 4hr closures beginning on Monday the 25th to Wednesday the 27th from 10am to 2pm, expect delays. Slow down to 20km/h through the work zone. Next update time Fri Mar 29 at 12:00 PM PDT. Last updated Wed Mar 27 at 7:08 PM PDT. (DBC-61149) |
Other Roads Both Directions |
Old Yale Road, in both directions. Construction work at south of Highway 17. Until Mon Apr 1. Road closed. Local traffic only. Last updated Thu Feb 29 at 3:48 PM PST. (DBC-61167) |
Other Roads Both Directions |
Halston Avenue Connector, in both directions. Bridge construction between Kingston Avenue and Salish Road in Kamloops. Until Wed Jul 10. Lane closures in both directions in effect. Watch for traffic control. Possible delays. Last updated Wed Mar 27 at 6:55 PM PDT. (DBC-61191) |
Other Roads Both Directions |
Barnhartvale Road, in both directions. Tree pruning between Buse Lake and Highway 97 near Kamloops. Until Fri Mar 29 at 5:00 PM PDT. Single lane alternating traffic. Last updated Wed Mar 27 at 6:55 PM PDT. (DBC-61270) |
Other Roads Eastbound |
W 16th Avenue, eastbound. Utility work between Westbrook Mall and Binning Road 1 km north of Ucluelet. Until Sat Jun 15. From 7:00 AM to 5:00 PM PDT on weekdays. Right lane closed. Installation of new watermain, fire hydrants chambers and road paving. Last updated Thu Mar 7 at 2:12 PM PDT. (DBC-61404) |
Other Roads |
Thorley Road. Geotechnical investigation between Noak Rd and Monnich Rd near Hixon. Until Sat Mar 30 at 6:00 PM PDT. Single lane alternating traffic. Watch for crews and signs. Last updated Wed Mar 27 at 7:08 PM PDT. (DBC-61517) |
Other Roads |
Camp Creek Rd. Geotechnical investigation between Hwy 97 and Horrocks Road 15 km north of Hixon. Until Mon Apr 15 at 6:00 PM PDT. Single lane alternating traffic. Watch for crews and signs. Last updated Wed Mar 27 at 7:08 PM PDT. (DBC-61519) |
Other Roads Both Directions |
Cedar Road, in both directions. Utility work between Duke Point Highway and MacMillan Road near Nanaimo. Until Wed Jul 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Watermain and water service replacement for North Cedar Improvement District, please proceed with caution. Last updated Thu Mar 14 at 2:43 PM PDT. (DBC-61661) |
Other Roads Both Directions |
Dog Creek Road, in both directions. Muddy sections between Meadow Lake Road and Enterprise Road 15 km south of 150 Mile House. Recommended 4x4 only. Next update time Fri Apr 26 at 10:00 AM PDT. Last updated Thu Mar 28 at 3:20 PM PDT. (DBC-61691) |
Other Roads Eastbound |
Smith Road, eastbound. Utility work between Lothian Road and Lamarque Road near Port Alberni. Until Thu Apr 4 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Water service and asphalt work. Expect minor delays. Last updated Mon Mar 18 at 2:32 PM PDT. (DBC-61768) |
Other Roads Both Directions |
Beaver Creek Road, in both directions. Utility work between Twisden Rd and Plested Rd near Port Alberni. Until Mon Apr 1 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Telus Fiber installation and testing. Watch for Traffic Control Personnel. Last updated Fri Mar 22 at 12:56 PM PDT. (DBC-61949) |
Other Roads Both Directions |
Cherry Creek Road, in both directions. Utility work between Moore Road and Horne Lake Rd near Port Alberni. Until Mon Apr 1 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Telus Fiber installation and testing along Cherry Creek Rd from Moore Rd to Cowley Road, along Cowley Rd from Cherry Creek Rd to Cypress Blvd, and along Cypress Blvd from Cowley Rd to Batty Rd. Watch for Traffic Control Personnel. Last updated Fri Mar 22 at 1:03 PM PDT. (DBC-61950) |
Other Roads |
Stirling Arm Drive. Utility work between Herbert Rd and McCoy Lake Rd near Port Alberni. Until Mon Apr 1 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Telus Fiber installation and testing on Stirlig Arm Drive, Sharon Drive, Katherine Drive, Tyler Drive, Sheila Way, and McCoy Lake Road to Landfill Road. Watch for Traffic Control Personnel. Last updated Fri Mar 22 at 1:15 PM PDT. (DBC-61951) |
Other Roads Both Directions |
Francis St, in both directions. Utility work planned between Black Road Rd and 25 Ave near Vernon. Starting Mon Apr 8 at 7:00 AM PDT until Mon Apr 8 at 5:00 PM PDT. The road will be closed. Detour planned. Last updated Wed Mar 27 at 2:39 PM PDT. (DBC-62017) |
Other Roads Westbound |
Old Hope Princeton Way, westbound. Utility work planned between 6th Ave and 7th Ave. Starting Mon Apr 15 until Fri Apr 19. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed. Watch for traffic control personnel. Last updated Mon Mar 25 at 2:41 PM PDT. (DBC-62027) |
Other Roads Both Directions |
Brechin Road, in both directions. Paving operations planned between Stewart Avenue and Beach Drive in Nanaimo. Starting Tue Apr 2 at 7:00 AM PDT until Fri Apr 5 at 5:00 PM PDT. Watch for traffic control personnel. Possible delays. Eastbound traffic on Brechin Road reduced to one lane to accommodate paving operations, Westbound lanes shifted. Last updated Wed Mar 27 at 1:34 PM PDT. (DBC-62106) |
Other Roads Northbound |
Hwy 99/Hwy 12, northbound. Utility work planned between Davis Rd and Pine Ridge Rd. Starting Mon Apr 1 at 8:00 AM PDT until Mon Apr 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Mar 28 at 3:14 PM PDT. (DBC-62146) |
Other Roads Both Directions |
Cross Creek Rd, in both directions. Utility work between Queens Ave and Tyrol Rd. Until Fri May 10. From 7:00 AM to 5:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Mar 28 at 5:32 PM PDT. (DBC-62152) |
Other Roads Eastbound |
Cypress Bowl Road, eastbound. Construction work planned between power lines and Chippendale Road. Starting Wed May 8 at 7:00 AM PDT until Wed May 8 at 5:00 PM PDT. Right lane will be blocked. Last updated Thu Mar 28 at 5:56 PM PDT. (DBC-62153) |