Highway 101 Both Directions |
Highway 101, in both directions. Special event planned between Alberni St and Duncan St for 0.9 km (Powell River). Starting Sun Dec 1 at 2:00 PM PDT until Sun Dec 1 at 5:00 PM PDT. Road closure planned. The annual Santa Claus Parade will be taking place. Next update time Sun Dec 1 at 5:00 PM PDT. Last updated Fri Oct 25 at 12:04 PM PDT. (DBC-69604) |
Highway 17 Westbound |
Highway 17, westbound. Bridge construction planned between Bridgeview Dr and Old Yale Rd for 2.5 km (Surrey). Starting Thu Nov 28 until Sat Nov 30. From 9:00 PM to 5:00 AM PST on Thursday, Friday and Saturday. Detour via Bridgeview Dr to 120th St. Next update time Sat Nov 30 at 5:00 AM PST. Last updated Tue Nov 19 at 4:13 PM PST. (DBC-70359) |
Highway 17 Eastbound |
Highway 17, eastbound. Bridge construction planned between Old Yale Rd and Bridgeview Dr (Surrey). Starting Mon Nov 25 until Wed Nov 27. From 9:00 PM to 5:00 AM PST on Monday, Tuesday and Wednesday. Road closure planned. Watch for traffic control personnel. Detour planned. Drivers to detour at Tannery Rd to 120th St. Next update time Wed Nov 27 at 5:00 AM PST. Last updated Tue Nov 19 at 5:10 PM PST. (DBC-70360) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Vehicle incident between the start of Highway 5 (Coquihalla South) and Exit 290: Merritt for 111.5 km (Hope to Merritt). Road closed. Assessment in progress. Detour via Highway 1 or Highway 3. Next update time Thu Nov 21 at 2:15 AM PST. Last updated Thu Nov 21 at 1:17 AM PST. (DBC-70418) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. There are rocks on the road between 7 Day Adventist Youth Camp Rd and Ross Rd (Hope). Road closed. Assessment in progress. No detour available. Alternate route via Highway 1 and Highway 9. Estimated time of re-opening Wed Nov 27 at 6:00 PM PST. Next update time Wed Nov 27 at 6:00 PM PST. Last updated Mon Nov 18 at 1:02 PM PST. (DBC-70255) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work between 5km south of Hell's Gate and Alexandra Tunnel. Until Thu Nov 21. From 8:00 AM to 4:00 PM PST daily. Right lane is blocked. Expect minor delays. For pole access and cable splicing. Last updated Mon Nov 4 at 10:03 AM PST. (DBC-69912) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Exit 33: Kensington Ave and Exit 37: Gaglardi Way for 4.3 km (Burnaby). Until Sat Nov 23. From 8:00 PM to 5:00 AM PST daily. Right lane closed. Shoulder closed. Last updated Thu Nov 14 at 11:52 AM PST. (DBC-70242) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 208 St and Exit 73 for 9.3 km (Langley - District). Until Sat Nov 30 at 5:00 AM PDT. Lane Closure. Expect minor delays. Last updated Tue Jun 25 at 9:00 AM PDT. (DBC-65554) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Sat Nov 30 at 5:30 AM PDT. Centre lane blocked. Right lane is blocked. Weekend closures from 9:00 PM to 7:30 AM. Last updated Fri Nov 1 at 7:00 PM PDT. (DBC-69860) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation at Exit 73 (Langley - District). Until Sat Nov 30 at 5:30 AM PDT. Early works investigation with coring and drilling. Saturday work from 9:00 p, to 7:00am. NO work on Sundays. Last updated Fri Nov 1 at 6:57 PM PDT. (DBC-69861) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work between Bradner Rd and Exit 90: McCallum Rd for 8.1 km (Abbotsford). Until Sat Nov 30. From 8:30 PM to 5:30 AM PDT on weekdays. Median installation and soil removal. Fast lane closed in both directions. Last updated Mon Oct 28 at 10:09 AM PDT. (DBC-69660) |
Highway 1 Both Directions |
[Truncated] Highway 1 (TransCanada Highway), in both directions. Construction work planned between Exit 83: Mt Lehman Rd and Exit 90: McCallum Rd for 7.2 km (Abbotsford). Starting Sun Dec 1 until Tue Dec 31. From 8:30 PM to 5:30 AM PST on weekdays. Left lane will be closed in both directions. Industrial traffic may slow or block regular traffic. For advanced works on median installation. Please use caution and obey all traffic control. Work ongoing Monday to Friday nights, ending Saturday mornin |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Bridge construction between Exit 104: No 3 Rd and Exit 109: Yale Rd for 1.3 km (1 km east of Abbotsford to Chilliwack). Until Thu Nov 21 at 5:00 AM PST. Left lane is blocked. Last updated Mon Nov 18 at 10:57 AM PST. (DBC-70324) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 153: Laidlaw Rd and Exit 160: Hunter Creek Rd (1 km west of Hope). Starting Mon Nov 25 at 7:00 AM PST until Mon Nov 25 at 1:00 PM PST. Expect minor delays. Right lane will be closed. Last updated Tue Nov 19 at 9:29 AM PST. (DBC-70343) |
Highway 1 |
Highway 1 (TransCanada Highway). Fog patches between Albert St and Jackass Summit for 69.2 km (Yale to 2 km north of Jackass Mountain Summit). Last updated Mon Nov 18 at 5:23 PM PST. (DBCRCON-192840) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between Anderson River Mainline and Thomas Rd for 2.8 km (21 to 24 km north of Yale). Until Thu Nov 28. From 8:00 AM to 4:00 PM PST daily. Lane Closure. Last updated Thu Nov 14 at 11:46 AM PST. (DBC-70240) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 70th Ave and 75 Ave 1 km north of Langley - City. Until Thu Dec 19. From 8:00 PM to 5:00 AM PDT daily. Last updated Wed Sep 4 at 4:12 PM PDT. (DBC-67896) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work between 136 St and 144 St for 0.6 km (Surrey). Until Fri Nov 29 at 4:00 PM PDT. Watch for slow moving trucks entering and exiting the Surrey Substation. Last updated Fri Sep 20 at 5:08 PM PDT. (DBC-68474) |
Highway 10 Eastbound |
Highway 10, eastbound. Utility work planned between 136 St and 144 St (Surrey). Starting Wed Nov 27 at 9:00 AM PST until Wed Nov 27 at 3:00 PM PST. Shoulder will be closed. Last updated Thu Nov 7 at 2:48 PM PST. (DBC-70077) |
Highway 10 Eastbound |
Highway 10, eastbound. Paving operations planned between 180 St and 188 St for 1.6 km (Surrey). Starting Sat Nov 23 at 7:00 AM PST until Sat Nov 23 at 3:00 PM PST. Right lane will be closed. Expect delays. 184th Street paving. Last updated Thu Nov 14 at 1:27 PM PST. (DBC-70245) |
Highway 10 |
Highway 10. Construction work at Worrell Cres (Langley - District). Until Thu Dec 19 at 5:00 PM PDT. Work is between 70th Ave. And 75th Ave. Last updated Mon Aug 19 at 8:47 AM PDT. (DBC-67327) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 232 St and the end of Highway 10 for 0.5 km (Langley - District). Until Fri Feb 28, 2025. From 8:00 AM to 4:00 PM PST daily. Right lane closed. Expect delays. Last updated Wed Nov 13 at 1:19 PM PST. (DBC-70210) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work at Jenkinson Rd (26 km east of Powell River). Until Fri Nov 22 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on weekdays. Lane Closure. Work is between Rickson Rd. And Jenkinson Rd. For switch maintenance. Last updated Fri Nov 15 at 5:49 PM PST. (DBC-70279) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work planned between Egmont Rd and Hallowell Rd for 5.2 km (40 to 45 km west of Sechelt). Starting Mon Dec 2 at 9:00 AM PST until Mon Dec 2 at 3:00 PM PST. Expect delays. Last updated Mon Nov 18 at 4:52 PM PST. (DBC-70332) |
Highway 101 Both Directions |
Highway 101, in both directions. Road construction work at Monkey Tree Lane (Sechelt). Until Sun Dec 15. From 7:00 AM to 7:00 PM PST on weekdays. Shoulder closed. Right lane closed. For highway widening works as part of the Selma Park Subdivision entrance works. Intermittent lane closures. Last updated Tue Nov 12 at 9:23 AM PST. (DBC-70160) |
Highway 101 Both Directions |
Highway 101, in both directions. Electrical maintenance planned between Oceanview Dr and Henry Rd for 1.2 km (1 to 2 km west of Gibsons). Starting Mon Nov 25 at 9:00 AM PST until Mon Nov 25 at 3:00 PM PST. Single lane alternating traffic will be in effect. Obey all traffic signage. Last updated Tue Nov 19 at 9:52 AM PST. (DBC-70344) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work between Valley Rd and Bateman Rd for 0.6 km (Abbotsford). Until Sat Nov 30. From 7:00 AM to 5:00 PM PST daily. Watch for traffic control. Expect delays. Work will be taking place November 12-16 and 18-30. Highway 11 northbound and southbound 4 lane shift. 50 km/h speed limit. Last updated Thu Nov 14 at 5:45 PM PST. (DBC-67048) |
Highway 11 Southbound |
Highway 11, southbound. Utility work between Bateman Rd and McClary Ave for 5.8 km (Abbotsford). Until Fri Nov 29. From 9:00 AM to 3:00 PM PST daily. Shoulder closed. Right lane closed. Last updated Thu Oct 24 at 2:20 PM PST. (DBC-69566) |
Highway 11 Southbound |
Highway 11, southbound. Road construction work at Townshipline Rd (Abbotsford). Until Tue Dec 31. Right turn lane closed. Last updated Tue Oct 8 at 2:26 PM PST. (DBC-69040) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work at Cedar Valley Conn (Mission). Until Sat Nov 23. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Watch for traffic control. Expect delays. Highway 11 - London Ave-200m north of Highway 7 on Cedar Valley Connector. Highway 7 - Hurd S.-Haig St. Remembrance Day - November 9 - 11 no traffic disruptions. Last updated Fri Oct 25 at 10:23 AM PDT. (DBC-68005) |
Highway 13 Both Directions |
Highway 13, in both directions. Geotechnical investigation between Robertson Cres and 46 Ave (Langley - District). Until Sat Nov 30 at 5:30 AM PDT. Early works investigation and asphalt coring. Last updated Fri Nov 1 at 6:46 PM PDT. (DBC-69859) |
Highway 15 Both Directions |
Highway 15, in both directions. Utility work between 76th Avenue and 73rd Avenue. Until Mon Dec 9. From 8:00 PM to 5:00 AM PST daily. Lane Closure. For pole relocation. Northbound right lane and southbound left turn lane will be closed. Last updated Wed Nov 6 at 12:42 PM PST. (DBC-70026) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Industrial traffic may slow or block regular traffic. Between 48 Ave and 40 Ave for 1.7 km (Surrey). Starting Sat Nov 30 at 8:00 AM PST until Tue Dec 31 at 5:00 PM PST. From 8:00 AM to 5:00 PM PST daily. Last updated Tue Nov 12 at 8:06 AM PST. (DBC-70156) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Shoulder maintenance planned between 58 Ave and 60 Ave for 0.4 km (Surrey). Starting Mon Nov 25 until Fri Dec 20. From 9:30 AM to 2:30 PM PST on weekdays. Right lane will be blocked. No work during winter maintenance. Last updated Wed Nov 13 at 3:14 PM PST. (DBC-70215) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Construction work at Fraser Hwy (Surrey). Until Tue Nov 26. From 9:30 AM to 2:30 PM PST on weekdays. Median removal. No work during winter maintenance activities. Last updated Tue Nov 19 at 6:19 PM PST. (DBC-70365) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Utility work between 68A Ave and 80 Ave for 1.7 km (Surrey). Until Wed Nov 27. From 9:00 AM to 2:00 PM PST daily. Lane Closure. Last updated Fri Nov 15 at 1:35 PM PST. (DBC-70274) |
Highway 15 |
Highway 15 (Pacific Highway). Construction work between Fraser Hwy and 80 Ave for 1.1 km (Surrey). Until Mon Dec 9. From 8:00 PM to 5:00 AM PST daily. Lane closures in both directions in effect. No work during winter maintenance activities. Last updated Tue Nov 19 at 6:21 PM PST. (DBC-70366) |
Highway 17 Southbound |
Highway 17, southbound. Maintenance planned at 64 St (Delta). Starting Thu Nov 21 at 10:00 AM PST until Thu Nov 21 at 3:00 PM PST. Right lane will be closed. Watch for traffic control personnel. Last updated Wed Nov 20 at 8:18 AM PST. (DBC-70387) |
Highway 17 Westbound |
Highway 17, westbound. Road sweeping between Tannery Rd and 80 St Conn for 10.4 km (Surrey to Delta). Until Thu Nov 21 at 4:00 AM PST. Right lane closed. Last updated Wed Nov 20 at 9:14 PM PST. (DBC-70417) |
Highway 3 |
Highway 3 (Crowsnest Highway). Compact snow between First Avalanche Gate and Sunday Summit for 78.6 km (17 km east of Hope to 32 km west of Princeton). Last updated Tue Nov 19 at 1:22 PM PST. (DBCRCON-192847) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Maintenance between Sunshine Valley and Manning Park Resort for 46.2 km (17 to 64 km east of Hope). Until Fri Dec 13 at 7:00 PM PST. Right lane is blocked. Shoulder closed. Work is between Rhododendron Flats and Cayuse Flats. Last updated Tue Nov 5 at 2:40 PM PST. (DBC-69992) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work at Manning Park Resort (64 km east of Hope). Until Sat Dec 14. From 6:00 AM to 7:00 PM PST on weekdays. Right lane closed. Watch for traffic control. Work will be taking place between Cayuse Flats and Rhododendron Flats. Last updated Wed Nov 13 at 3:36 PM PST. (DBC-70216) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Utility work between Exit 183: Othello Rd and the start of Highway 5 (Coquihalla South) (3 km north of Hope). Until Fri Nov 22 at 4:30 PM PDT. Right lane closed. Expect delays. Right lane to be closed on the Nicolum Creek Bridge, prior to Exit 183: Othello Road. Last updated Tue Oct 15 at 1:22 PM PDT. (DBC-69037) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Maintenance between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Thu Sep 5 at 10:23 AM PDT. (DBC-67924) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Utility work at Exit 183: Othello Rd (6 km north of Hope). Until Sat Nov 30. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Last updated Tue Oct 22 at 2:18 PM PDT. (DBC-69489) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Road maintenance work between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Fri Dec 6 at 4:00 PM PST. Right lane is blocked. Last updated Thu Nov 7 at 9:21 AM PST. (DBC-70061) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Carr St and 218 St (Maple Ridge). Until Mon Dec 30 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays. Expect intermittent right lane closures as crews work on a residential structure. Last updated Fri Oct 18 at 4:14 PM PDT. (DBC-69370) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between 266 St and 272 St for 0.5 km (Maple Ridge). Until Sat Dec 7. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Watch for traffic control. Expect delays. Work will be taking place November 12-16 / November 18-23 / November 25-30 / December 2-7. Last updated Tue Nov 12 at 5:01 PM PST. (DBC-67049) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Horne St and James St for 0.2 km (Mission). Until Fri Dec 6 at 3:00 PM PST. Right lane is blocked. Shoulder closed. Curb adjustment for additional bus stop. Last updated Fri Nov 1 at 3:56 PM PST. (DBC-69851) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Special event planned between Haig St and Glasgow Ave for 1.7 km (Mission). Starting Sat Dec 7 at 3:00 PM PST until Sat Dec 7 at 10:00 PM PST. Road closure planned. Mission Candlelight Parade. Last updated Tue Nov 12 at 11:07 AM PST. (DBC-70168) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Tree pruning between Taylor Rd and Beach Camp Rd for 12.5 km (1 km west of Kent to 13 km east of Mission). Until Sun Dec 1. From 9:00 AM to 4:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Thu Oct 24 at 2:29 PM PDT. (DBC-68459) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Johnson Slough Rest Area and Wahleach Rd for 3.4 km (Kent). Until Sat Nov 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Right lane closed. Shoulder closed. Watch for traffic control. Last updated Wed Aug 7 at 2:21 PM PDT. (DBC-66954) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Wahleach Rd and Johnson Slough Rest Area (Kent). Until Sat Nov 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Reduced speed zone. Watch for traffic control personnel. Last updated Thu Aug 8 at 5:01 PM PDT. (DBC-67009) |
Highway 9 Southbound |
Highway 9, southbound. Utility work planned between Morrow Rd and Bristol Dr for 0.4 km (Kent). Starting Tue Nov 26 at 9:00 AM PST until Fri Dec 6 at 4:00 PM PST. Right lane will be blocked. Last updated Mon Nov 4 at 4:04 PM PST. (DBC-69944) |
Highway 9 Both Directions |
Highway 9, in both directions. Road construction work between Pioneer Ave and McCallum Rd for 1.3 km (Kent). Until Thu Dec 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Lane closure from Else Rd to McCallum Rd. No lane closures November 9th to 11th. Last updated Tue Oct 8 at 2:22 PM PDT. (DBC-69039) |
Highway 9 Northbound |
Highway 9, northbound. Utility work planned between Balsam Ave and Walnut Ave for 0.3 km (Harrison Hot Springs). Starting Wed Nov 27 until Fri Dec 6. From 9:00 AM to 4:00 PM PST on weekdays. Single lane alternating traffic will be in effect. Last updated Tue Nov 5 at 1:48 PM PST. (DBC-69989) |
Highway 91 Both Directions |
Highway 91, in both directions. Geotechnical investigation at Exit 8: Nordel Way (Delta). Until Sat Nov 30 at 5:00 PM PDT. Shoulder closed. Survey work in all directions at this intersection. No lane closure. Last updated Fri Nov 1 at 7:13 PM PDT. (DBC-69862) |
Highway 91A Eastbound |
Highway 91A, eastbound. Utility work between Boyd St and Stewardson Way for 0.5 km (New Westminster). Until Sat Nov 30. From 10:00 PM to 5:00 AM PST daily. Right lane closed. Watch for traffic control. Last updated Fri Nov 15 at 3:15 PM PST. (DBC-70275) |
Highway 99 Both Directions |
Highway 99, in both directions. Maintenance planned at Massey Tunnel (Richmond). Starting Mon Dec 2 at 10:00 PM PST until Fri Dec 6 at 5:00 AM PST. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Thu Nov 14 at 6:46 AM PST. (DBC-70228) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Blundell Rd and Exit 32: Steveston Hwy for 2.5 km (Richmond). Until Fri Jan 31, 2025. From 10:00 PM to 5:00 AM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Aug 30 at 3:14 PM PDT. (DBC-67769) |
Highway 99 |
Highway 99. Road maintenance work planned at Porteau Cove Rd (9 km north of Lions Bay). Starting Thu Nov 21 at 9:00 AM PST until Thu Nov 21 at 4:00 PM PST. Single lane alternating traffic will be in effect. Last updated Wed Nov 20 at 12:03 PM PST. (DBC-70399) |
Highway 99 Both Directions |
Highway 99, in both directions. Geotechnical investigation between Main St and Davis Rd for 91.5 km (1 km north of Pemberton to Lillooet). Until Fri Nov 22 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for crews working at various sites between Mount Currie and Lillooet. Last updated Tue Sep 24 at 4:33 PM PDT. (DBC-68582) |
Highway 99 |
Highway 99. Watch for slippery sections between Lil'wat Pl and Hat Creek Rd for 100.6 km (Lillooet). Last updated Wed Nov 20 at 7:08 PM PST. (DBCRCON-193490) |
Highway 99A Both Directions |
Highway 99A (King George Blvd), in both directions. Utility work planned between South Surrey Park And Ride and 44 Ave for 0.6 km (Surrey). Starting Mon Nov 25 until Sat Nov 30. From 8:00 PM to 6:00 AM PST daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Nov 6 at 3:10 PM PST. (DBC-70037) |
Other Roads Both Directions |
Othello Road, in both directions. Road construction work between Highway 5 and Tunnel Road. Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays. Last updated Fri Jul 26 at 2:59 PM PDT. (DBC-64917) |
Other Roads Both Directions |
NW Marine Drive, in both directions. Utility work at Acadia Rd. Until Tue Dec 31 at 7:00 PM PDT. Lane Closure. NW Marine Dr. And Acadia Rd sewer separation and watermain work. Last updated Thu Jul 25 at 4:32 PM PDT. (DBC-66577) |
Other Roads |
Redrooffs Rd. Construction work between Hwy 101 and Cove Rd. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:32 PM PDT. (DBC-67111) |
Other Roads Both Directions |
Beach Ave, in both directions. Construction work between Flume Rd and Park Rd. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:41 PM PDT. (DBC-67113) |
Other Roads Both Directions |
Day Rd, in both directions. Construction work between Lockyer Rd and End of Day Rd East. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:40 PM PDT. (DBC-67114) |
Other Roads Westbound |
University Blvd., westbound. Maintenance between Western Parkway and Wesbrook Mall in Vancouver. Until Thu Jan 30, 2025. Shoring work on the south face of Menno Hall along University Blvd. Last updated Sun Sep 1 at 8:44 PM PDT. (DBC-67270) |
Other Roads Southbound |
Sylvester Rd, southbound. Utility work planned between Davies Rd and Nicomen Slough. Starting Mon Nov 25 until Fri Jan 24, 2025. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Oct 31 at 1:37 PM PDT. (DBC-69810) |
Other Roads Both Directions |
56th Avenue, in both directions. Geotechnical investigation between 256th St. And 264th St. Until Sat Nov 30 at 5:30 AM PST. Early works investigation and asphalt coring. Last updated Mon Nov 11 at 11:26 PM PST. (DBC-69857) |
Other Roads Eastbound |
56th Avenue, eastbound. Geotechnical investigation between WB Hwy 1 on ramp and Gloucester Way. Until Sat Nov 30 at 5:30 AM PST. Early works investigation and asphalt coring. Last updated Mon Nov 11 at 11:25 PM PST. (DBC-69858) |
Other Roads Eastbound |
Lonsdale Ave, eastbound. Tree pruning planned between 23rd St E and 26th St E 1 km north of North Vancouver - City. Starting Sun Nov 24 at 9:00 AM PST until Sun Nov 24 at 4:00 PM PST. Last updated Wed Nov 13 at 3:54 PM PST. (DBC-70217) |