DriveBC Road Conditions and Events

  • Events for Highway 52
  • Highway 52 Both directions Fog Patches from Tumbler Ridge to 28 km south of Arras (70.7 km). Updated Tue May 21 at 2:59 pm PDT. (ID# 152894)
    Highway 52 Both directions Construction 26 km south of Arras until further notice. Temporary bridges in northbound and southbound lanes. Posted speed through construction site 30 kmh. Drivers to proceed with caution. Updated on March 26 at 9:29 am PDT. (ID# -31501)

Share

© BC Ministry of Transportation and Infrastructure

Home | About | Help | Feedback