DriveBC Road Conditions and Events

  • Events for Highway 19A between Parksville and Campbell River
  • Highway 19A between Parksville and Campbell River Both directions Construction 1.5 km south of Courtenay between Beachwood Road to Christie Parkway, 7:00 am to 4:00 pm Mon-Fri through Jun 7. The road is reduced to single lane alternating traffic. Updated on Mon May 6 at 1:42 pm PDT. (ID# -40603)

Share

© BC Ministry of Transportation and Infrastructure

Home | About | Help | Feedback