Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Road sweeping between Bayview Ave and Mary Ellen Dr for 9.6 km (Nanaimo). Until Wed May 15 at 3:30 PM PDT. Lane Closure. Watch for traffic control. Last updated Tue Apr 16 at 8:01 AM PDT. (DBC-62748) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work between Resort Way and Martindale Rd for 0.8 km (Parksville). Until Thu Apr 18 at 3:30 PM PDT. Shoulder closed. Possible delays. Fortis utility work in preparation for watermain installation. Watch for Traffic Control Personnel. Last updated Tue Apr 2 at 9:06 AM PDT. (DBC-62131) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Utility work planned between Northdowne Rd and Bowser Rd for 0.9 km (18 km south of Buckley Bay Ferry Terminal to 18 km north of Qualicum Beach). Starting Mon Apr 29 at 7:00 AM PDT until Tue Jul 30 at 5:00 PM PDT. Shoulder will be closed. Single lane alternating traffic will be in effect. Expect minor delays. Watermain replacement. Watch for traffic control and speed reduction to 50 km/h in work zone. Last updated Thu Apr 4 at 2:57 PM PDT. (DBC-62321) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Kirby Rd and Graham Rd for 0.8 km (5 to 4 km north of Courtenay). Starting Mon Apr 29 at 9:00 AM PDT until Mon Apr 29 at 2:00 PM PDT. BC Hydro Pole replacement. Single Lane Alternating Traffic. Last updated Thu Apr 18 at 8:52 AM PDT. (DBC-62870) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Ditching between Jubilee Pky and Terrain Rd for 10.4 km (Campbell River to 11 km south of Campbell River). Until Fri Apr 19 at 5:30 PM PDT. Watch for traffic control. Last updated Fri Apr 12 at 12:32 PM PDT. (DBC-62626) |