 |
Route |
 |
 |
Description |
 |
 |
Last Updated |
 |
 |
| |
Highway 3A between Castlegar and Creston Both Directions |
 |
|
Bridge Construction at Akokli Creek Bridge 40 km west of Junction with Highway 3, in Creston 7:00 am to 7:00 pm daily through Oct 31 except Statutory Holiday weekends. The road is reduced to single lane alternating traffic. Expect Minor Delays. Updated on Tue Apr 27 at 11:42 am. (ID# -20492) |
|
 |
Apr 27, 2010 11:42 AM
|
|
 |
| |
Highway 3A between Castlegar and Creston Both Directions |
 |
|
Environmental Cleanup 16 km west of Creston 7:00 am to 6:00 pm daily starting Aug 30 through Sep 3. The road will be reduced to single lane alternating traffic. Expect minor delays. Updated on Mon Aug 30 at 6:17 am. (ID# -23093) |
|
 |
Aug 30, 2010 06:17 AM
|
|
 |
| |
Highway 3B Both Directions |
 |
|
Paving 2 km east of Rossland at Redstone Intersection to Junction with Highway 22 in Rossland (2 km), 7:00 am to 7:00 pm Mon-Sat through Sep 4. Expect minor delays. Updated on Tue Aug 17 at 9:56 am. (ID# -22905) |
|
 |
Aug 17, 2010 09:56 AM
|
|
 |
| |
Highway 6 Both Directions |
 |
|
Ferry Service Interruption from Fauquier Ferry Dock to Needles Ferry Dock (1.1 km). Due to a broken cable there will be delays longer than 30 minutes. The ferry will be leaving the Fauquier dock every hour on the hour and the Needles dock every hour on the half hour. Ferry will be back in normal service at 2:00 pm Sep 2, confidence level high. Updated on Thu Sep 2 at 2:51 am. (ID# 98919) |
|
 |
Sep 02, 2010 02:51 AM
|
|
 |
| |
Highway 22 Both Directions |
 |
|
Paving from British Columbia and Washington Border, South of Rossland to Junction with Highway 3B in Rossland (12.5 km), 7:00 am to 7:00 pm Mon-Sat through Sep 4. Traffic Control on site. Expect minor delays. Updated on Tue Aug 17 at 9:38 am. (ID# -22903) |
|
 |
Aug 17, 2010 09:38 AM
|
|
 |
| |
Needles Ferry Both Directions |
 |
|
Ferry Service Interruption at Lower Arrow Lake. Due to a broken cable there will be delays longer than 30 minutes. The ferry will be leaving the Fauquier dock every hour on the hour and the Neeldles dock every hour on the half hour. Ferry will be back in normal service at 2:00 pm Sep 2, confidence level high. Updated on Thu Sep 2 at 3:38 am. (ID# 98916) |
|
 |
Sep 02, 2010 03:38 AM
|
|
 |
 |